|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 8/1/2024 Measured TD: 18102 ft. Vertical TD: 8032 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 8/1/2024 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 6/18/2021 | Proposed Top PZ Location: | Sec:2 Twp: 5S 65W | Footage: 1268 FNL 465 FEL | Bottom Hole Location: | Sec:3 Twp: 5S 65W | Footage: 1226 FNL 466 FWL | Proposed Depth/Form: | 17981 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | STATE | Surface Owner: | STATE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 535-1087 , Unit Acreage: 1280, Drill Unit: Sec 2 & 3 All | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 42 , Citings Type: PLANNED | Cement: | Sacks: 86, Top: 0 ft., Bottom: 100 ft. | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2250 ft., Weight: 40 , Citings Type: PLANNED | Cement: | Sacks: 1212, Top: 0 ft., Bottom: 2250 ft. | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17981 ft., Weight: 20 , Citings Type: PLANNED | Cement: | Sacks: 2613, Top: , Bottom: 17981 ft. |
| | |
Wellbore Completed | Completion Date: | 5/14/2021 | Spud Date: | 3/8/2021 | Spud Date Is: | ACTUAL | Measured TD: | 18102 ft. | Measured PB depth: | 18069 ft. | True Vertical TD: | 8032 ft. | True Vertical PB depth: | 8033 ft. | Top PZ Location: | Sec:2 Twp: 5S 65W | Footage: 1268 FNL 465 FEL | Bottom Hole Location: | Sec:3 Twp: 5S 65W | Footage: 1226 FNL 466 FWL | Log Types: | Mud, MWD/LWD, CBL, Casing evaluation tool, (Resistivity on 005-07221). | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 104 ft., Weight: 42.09 , Citings Type: ACTUAL | Cement: | Sacks: 42, Top: 0 ft., Bottom: 104 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2277 ft., Weight: 40 , Citings Type: ACTUAL | Cement: | Sacks: 1115, Top: 0 ft., Bottom: 2277 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18083 ft., Weight: 20 , Citings Type: ACTUAL | Cement: | Sacks: 2648, Top: 2240 ft., Bottom: 18083 ft., Determination Method: CBL | Additional Cement: | String Type: SURF , Top: 0 ft., Depth: 23 ft., Bottom: 23 ft., Sacks: 7, Method: 1 INCH | Formation | Interval Top | Log Bottom | Cored | DSTs | DENVER | 24 ft. | 1607 ft. | N | N | LARAMIE | 1607 ft. | 1953 ft. | N | N | FOX HILLS | 1953 ft. | 2136 ft. | N | N | PIERRE | 2136 ft. | 7912 ft. | N | N | NIOBRARA | 7912 ft. | | N | N |
Formation NBRR Formation Classification: OW Status: PR - 8/1/2024 Interval Top: 8461 ft. Interval Bottom: 18057 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 7/28/2021 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | HYDRAULIC FRACTURING | Treatment Date: | 6/1/2021 | Treatment End Date: | 7/4/2021 | Treatment Summary: | 366064 bbls of water, 364 bbls of additives (FRP-22G, Bardac 2250M, T-Chlor 12.5, SAFE-BFH-2, XLS-3Z, BHL-68, ACI-97, ASF-67, LGA-3J) and 1733 bbl HCL in a 48 stage frac with 7896 ibs of DFR-1X and 71531 lbs of silica quartz proppant | Total fluid used in treatment (bbls): | 368161 | Max pressure during treatment (psi): | 8615 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 48 | Total acid used in treatment (bbls): | 1733 | Min frac gradient (psi/ft): | 0.87 | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 16291 | Fresh water used in treatment (bbls): | 366064 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 71531 | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8057 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 8/7/2021 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 680 | BBLS_OIL | 467 | BTU_GAS | 1517 | CALC_BBLS_H2O | 680 | CALC_BBLS_OIL | 467 | CALC_GOR | 1086 | CALC_MCF_GAS | 507 | GRAVITY_OIL | 60 | MCF_GAS | 507 | TUBING_PRESS | 988 |
| Perforation Data: | Interval Top: | 8461 ft. | # Of Holes: | 1208 | Interval Bottom: | 18057 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 6844 |
Total Gas Produced (MCF) | 11879 |
GOR | 1735 |
GOR Determination | BOE |
Average BOE per Day | 19.637 |
Average MCFE per Day | 113.907 |
Federal Financial Assurance | i | |
|
|