|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 8/1/2024 Measured TD: 18069 ft. Vertical TD: 7991 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 8/1/2024 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 6/18/2021 | | Proposed Top PZ Location: | Sec:2 Twp: 5S 65W | Footage: 1862 FNL 470 FEL | | Bottom Hole Location: | Sec:3 Twp: 5S 65W | Footage: 1854 FNL 465 FWL | | Proposed Depth/Form: | 18045 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | STATE | Surface Owner: | STATE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 535-1087 , Unit Acreage: 1280, Drill Unit: Sec 2& 3 All | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 42 , Citings Type: PLANNED | | Cement: | Sacks: 86, Top: 0 ft., Bottom: 100 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2250 ft., Weight: 40 , Citings Type: PLANNED | | Cement: | Sacks: 1212, Top: 0 ft., Bottom: 2250 ft. | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18045 ft., Weight: 20 , Citings Type: PLANNED | | Cement: | Sacks: 2626, Top: , Bottom: 18045 ft. |
| | |
| Wellbore Completed | | Completion Date: | 5/9/2021 | | Spud Date: | 3/7/2021 | Spud Date Is: | ACTUAL | | Measured TD: | 18069 ft. | Measured PB depth: | 18033 ft. | | True Vertical TD: | 7991 ft. | True Vertical PB depth: | 7991 ft. | | Top PZ Location: | Sec:2 Twp: 5S 65W | Footage: 1862 FNL 470 FEL | | Bottom Hole Location: | Sec:3 Twp: 5S 65W | Footage: 1854 FNL 465 FWL | | Log Types: | Mud, MWD/LWD, CBL, Casing evaluation tool, (Resistivity on 005-07221). | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 104 ft., Weight: 42.09 , Citings Type: ACTUAL | | Cement: | Sacks: 42, Top: 0 ft., Bottom: 104 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2281 ft., Weight: 40 , Citings Type: ACTUAL | | Cement: | Sacks: 1126, Top: 0 ft., Bottom: 2281 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18046 ft., Weight: 20 , Citings Type: ACTUAL | | Cement: | Sacks: 2582, Top: 2278 ft., Bottom: 18046 ft., Determination Method: CBL | | Additional Cement: | String Type: SURF , Top: 0 ft., Depth: 29 ft., Bottom: 29 ft., Sacks: 10, Method: 1 INCH | | Formation | Interval Top | Log Bottom | Cored | DSTs | | DENVER | 24 ft. | 1608 ft. | N | N | | LARAMIE | 1608 ft. | 1953 ft. | N | N | | FOX HILLS | 1953 ft. | 2136 ft. | N | N | | PIERRE | 2136 ft. | 7906 ft. | N | N | | NIOBRARA | 7906 ft. | | N | N |
Formation NBRR Formation Classification: OW Status: PR - 8/1/2024 Interval Top: 8423 ft. Interval Bottom: 18020 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 7/24/2021 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 6/1/2021 | Treatment End Date: | 7/4/2021 | | Treatment Summary: | 377273 bbls of water, 373 bbls of additives (FRP-22G, Bardac 2250M, T-Chlor 12.5, SAFE-BFH-2, XLS-3Z, BHL-68, ACI-97, ASF-67, LGA-3J) and 1756 bbl HCL in a 48 stage frac with 7250 ibs of DFR-1X and 71872 lbs of silica quartz proppant | | Total fluid used in treatment (bbls): | 379402 | Max pressure during treatment (psi): | 8810 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 48 | | Total acid used in treatment (bbls): | 1756 | Min frac gradient (psi/ft): | 0.84 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 21638 | | Fresh water used in treatment (bbls): | 377273 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 71872 | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7531 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/6/2021 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 639 | | BBLS_OIL | 653 | | BTU_GAS | 1513 | | CALC_BBLS_H2O | 639 | | CALC_BBLS_OIL | 653 | | CALC_GOR | 968 | | CALC_MCF_GAS | 632 | | GRAVITY_OIL | 56 | | MCF_GAS | 632 | | TUBING_PRESS | 1103 |
| | Perforation Data: | | Interval Top: | 8423 ft. | # Of Holes: | 1184 | | Interval Bottom: | 18020 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 17701 |
| Total Gas Produced (MCF) | 16382 |
| GOR | 925 |
| GOR Determination | BOE |
| Average BOE per Day | 56.396 |
| Average MCFE per Day | 327.095 |
| Federal Financial Assurance | i | |
|
|