Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-005-07368
Well Classification: OW Status: SI - 5/1/2024
Well Name/No:Chico 4-65 26-25 #2DH
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date5/1/2024
FacilityID:455197LocationID:455198
Municipality/County:AURORA / ARAPAHOE #005Location:SWNW 26 4S65W 6
Field:WILDCAT - #99999Elevation:5793 ft.
Planned Location:2190FNL  525 FWLLat/Long: 39.675958 / -104.639046Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.675960 / -104.639046Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/15/2019
End Date: 5/18/2019
Reported: 7/1/2019
Days to report: 44
Disclosure: Sidetrack #00
Start Date: 4/16/2019
End Date: 5/18/2019
Reported: 1/26/2020
Originally Reported: 10/23/2019
Days to report: 253
Days to report: 158
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 5/1/2024             Measured TD: 17975 ft.    Vertical TD: 7895 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 5/1/2024
Wellbore PermitHORIZONTAL
Permit #:Expiration Date:5/24/2020
Proposed Top PZ Location:Sec:26 Twp: 4S 65W Footage: 2462 FNL  745 FWL
Bottom Hole Location:Sec:25 Twp: 4S 65W Footage: 2475 FNL  328 FEL
Proposed Depth/Form:18009 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-937 , Unit Acreage: 1280, Drill Unit: S 25 & 26 ALL
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 65 , Citings Type: PLANNED
Cement:Sacks: , Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2236 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 610, Top: 0 ft., Bottom: 2236 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18009 ft., Weight: 23 , Citings Type: PLANNED
Cement:Sacks: 2250, Top: 2236 ft., Bottom: 18009 ft.
Casing:String Type: 1ST LINER, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18200 ft., Weight: 23 , Citings Type: PLANNED
Cement:Sacks: 2250, Top: 2236 ft., Bottom: 18200 ft.

Wellbore Completed
Completion Date:10/18/2018
Spud Date:10/2/2018Spud Date Is:ACTUAL
Measured TD:17975 ft.Measured PB depth:17867 ft.
True Vertical TD:7895 ft.True Vertical PB depth:7896 ft.
Top PZ Location:Sec:26 Twp: 4S 65WFootage: 2462 FNL  745 FWL
Bottom Hole Location:Sec:25 Twp: 4S 65WFootage: 2475 FNL  328 FEL
Log Types:MWD/LWD; Mud Log; Resistivity ; CBL
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 65 , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 100 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2264 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 770, Top: 0 ft., Bottom: 2280 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17957 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 2365, Top: 1594 ft., Bottom: 17975 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FOX HILLS1841 ft.
PIERRE2036 ft.
SUSSEX7307 ft.
SHANNON7614 ft.
SHARON SPRINGS7811 ft.
NIOBRARA7921 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  SI - 5/1/2024                  Interval Top: 8507 ft.    Interval Bottom: 17782 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:7/24/2019Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/16/2019Treatment End Date:5/18/2019
Treatment Summary:2,758 bbls of 15% HCl Acid 9,549 bbls of Fresh Water 342,076 bbls of FR Water 30 bbls of Linear Gel 1,441,285 pounds of 100 Mesh 10,479,125 pounds of 40/70 White
Total fluid used in treatment (bbls):354413Max pressure during treatment (psi):9277
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.36
Type Of gas:Number Of staged intervals:38
Total acid used in treatment (bbls):2758Min frac gradient (psi/ft):0.91
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):19771
Fresh water used in treatment (bbls):351655Disposition method For flowback:DISPOSAL
Total proppant used (lbs):11920410Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8344 ft.
Tubing Packer Depth:8336 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/15/2019Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1676
BBLS_OIL 976
BTU_GAS 1458
CALC_BBLS_H2O 1676
CALC_BBLS_OIL 976
CALC_GOR 1191
CALC_MCF_GAS 1162
CASING_PRESS 3
GRAVITY_OIL 38
MCF_GAS 1162
TUBING_PRESS 1324
Perforation Data:
Interval Top:8507 ft.# Of Holes:1230
Interval Bottom:17782 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
April 2024 - March 2025i
Total Oil Produced (Barrels)427
Total Gas Produced (MCF)8850
GOR20725
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No