Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-005-07366
Well Classification: OW Status: PR - 9/1/2025
Well Name/No:Chico 4-65 26-25 #2BH
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/1/2025
FacilityID:455195LocationID:455198
Municipality/County:AURORA / ARAPAHOE #005Location:SWNW 26 4S65W 6
Field:WILDCAT - #99999Elevation:5796 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2110FNL  525 FWLLat/Long: 39.676178 / -104.639045Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.676179 / -104.639045Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/22/2019
End Date: 5/4/2019
Reported: 7/1/2019
Days to report: 58
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 9/1/2025             Measured TD: 17932 ft.    Vertical TD: 7833 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 9/1/2025
Wellbore PermitHORIZONTAL
Permit #:Expiration Date:5/24/2020
Proposed Top PZ Location:Sec:26 Twp: 4S 65W Footage: 1858 FNL  757 FWL
Bottom Hole Location:Sec:25 Twp: 4S 65W Footage: 1835 FNL  349 FEL
Proposed Depth/Form:18006 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-937 , Unit Acreage: 1280, Drill Unit: All S25, All S26
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 65 , Citings Type: PLANNED
Cement:Sacks: , Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2236 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 610, Top: 0 ft., Bottom: 2236 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18006 ft., Weight: 23 , Citings Type: PLANNED
Cement:Sacks: 2250, Top: 2236 ft., Bottom: 18006 ft.

Wellbore Completed
Completion Date:10/30/2018
Spud Date:10/4/2018Spud Date Is:ACTUAL
Measured TD:17932 ft.Measured PB depth:17825 ft.
True Vertical TD:7833 ft.True Vertical PB depth:7833 ft.
Top PZ Location:Sec:26 Twp: 4S 65WFootage: 1858 FNL  757 FWL
Bottom Hole Location:Sec:25 Twp: 4S 65WFootage: 1835 FNL  349 FEL
Log Types:LWD/MWD; Mud Log; CBL; (Resistivity in API 005-07368)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 125 ft., Weight: 65 , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 125 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2306 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 770, Top: 0 ft., Bottom: 2320 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17912 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 2365, Top: 542 ft., Bottom: 17932 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FOX HILLS1841 ft.
PIERRE2036 ft.
SUSSEX7375 ft.
SHANNON7598 ft.
SHARON SPRINGS7810 ft.
NIOBRARA7929 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 9/1/2025                  Interval Top: 8490 ft.    Interval Bottom: 17740 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:7/17/2019Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/22/2019Treatment End Date:5/4/2019
Treatment Summary:2,848 bbls of 15% HCl Acid 11,409 bbls of Fresh Water 323,250 bbls of FR Water 1,274,950 pounds of 100 Mesh 11,353,000 pounds of 40/70 White
Total fluid used in treatment (bbls):337507Max pressure during treatment (psi):9127
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.36
Type Of gas:Number Of staged intervals:38
Total acid used in treatment (bbls):2848Min frac gradient (psi/ft):0.86
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):1014
Fresh water used in treatment (bbls):334659Disposition method For flowback:DISPOSAL
Total proppant used (lbs):12627950Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8340 ft.
Tubing Packer Depth:8333 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/25/2019Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 753
BBLS_OIL 907
BTU_GAS 1572
CALC_BBLS_H2O 753
CALC_BBLS_OIL 907
CALC_GOR 988
CALC_MCF_GAS 896
CASING_PRESS 1
GRAVITY_OIL 43
MCF_GAS 896
TUBING_PRESS 1030
Perforation Data:
Interval Top:8490 ft.# Of Holes:1230
Interval Bottom:17740 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)820
Total Gas Produced (MCF)237
GOR289
GOR DeterminationBOE
Average BOE per Day2.373
Average MCFE per Day13.743

 Federal Financial Assurance  i 

 Tribal Well  i No