Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-005-07363
Well Classification: OW Status: PR - 8/1/2024
Well Name/No:Arkansas 4-64 #3-2 3DH
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/1/2024
FacilityID:454818LocationID:454808
County:ARAPAHOE #005Location:NWSW 3 4S64W 6
Field:DJ HORIZONTAL NIOBRARA - #16950Elevation:5611 ft.
Planned Location:1983FSL  495 FWLLat/Long: 39.729872 / -104.544072Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/26/2022
End Date: 2/14/2022
Reported: 7/8/2022
Originally Reported: 2/28/2022
Days to report: 144
Days to report: 14
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 8/1/2024             Measured TD: 17768 ft.    Vertical TD: 7415 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 8/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:9/14/2024
Proposed Top PZ Location:Sec:3 Twp: 4S 64W Footage: 1370 FSL  330 FWL
Bottom Hole Location:Sec:2 Twp: 4S 64W Footage: 1370 FSL  330 FEL
Proposed Depth/Form:17939 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-1355 , Unit Acreage: 1280, Drill Unit: T4S R64W Sec. 2 & 3:
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 42.09 , Citings Type: PLANNED
Cement:Sacks: 114, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 3024 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 1617, Top: 0 ft., Bottom: 3024 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17939 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2489, Top: , Bottom: 17939 ft.

Wellbore Completed
Completion Date:12/2/2021
Spud Date:10/28/2021Spud Date Is:ACTUAL
Measured TD:17768 ft.Measured PB depth:17761 ft.
True Vertical TD:7415 ft.True Vertical PB depth:7415 ft.
Top PZ Location:Sec:3 Twp: 4S 64WFootage: 1420 FSL  341 FWL
Bottom Hole Location:Sec:2 Twp: 4S 64WFootage: 1405 FSL  440 FEL
Log Types:CBL, MUD, MWD, (COMPOSITE 005-07360)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 115, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 3098 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 1530, Top: 0 ft., Bottom: 3098 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17761 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2800, Top: 3292 ft., Bottom: 17761 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4910 ft.NN
SHANNON5708 ft.NN
SHARON SPRINGS7385 ft.NN
NIOBRARA7467 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 8/1/2024                  Interval Top: 7889 ft.    Interval Bottom: 17650 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/17/2022Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:1/26/2022Treatment End Date:2/14/2022
Treatment Summary:Frac'd Niobrara with 55 stage plug and perf: 15296105 total pounds proppant pumped: 14541610 pounds 40/70 mesh; 754495 pounds 100 mesh. 621228 total bbls fluid pumped: 598963 bbls gelled fluid; 18336 bbls fresh water and 3929 bbls 15% HCl Acid.
Total fluid used in treatment (bbls):621228Max pressure during treatment (psi):8924
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:55
Total acid used in treatment (bbls):3929Min frac gradient (psi/ft):0.83
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):2384
Fresh water used in treatment (bbls):18336Disposition method For flowback:DISPOSAL
Total proppant used (lbs):15296105Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7778 ft.
Tubing Packer Depth:7776 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/2/2022Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 20
BBLS_OIL 7
BTU_GAS 1337
CALC_BBLS_H2O 20
CALC_BBLS_OIL 7
CALC_GOR 11714
CALC_MCF_GAS 82
CASING_PRESS 1050
GRAVITY_OIL 39
MCF_GAS 82
TUBING_PRESS 1350
Perforation Data:
Interval Top:7889 ft.# Of Holes:2392
Interval Bottom:17650 ft.Hole Size:0.26 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
April 2024 - March 2025i
Total Oil Produced (Barrels)37124
Total Gas Produced (MCF)72414
GOR1950
GOR DeterminationBOE
Average BOE per Day134.649
Average MCFE per Day780.961

 Federal Financial Assurance  i 

 Tribal Well  i No