Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-005-07361
Well Classification: OW Status: PR - 8/1/2024
Well Name/No:ARKANSAS 4-64 3-2 #3CH
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/1/2024
FacilityID:454812LocationID:454808
County:ARAPAHOE #005Location:NWSW 3 4S64W 6
Field:DJ HORIZONTAL NIOBRARA - #16950Elevation:5611 ft.
Planned Location:2023FSL  495 FWLLat/Long: 39.729982 / -104.544072Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/25/2022
End Date: 2/14/2022
Reported: 7/8/2022
Originally Reported: 2/28/2022
Days to report: 144
Days to report: 14
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 8/1/2024             Measured TD: 17826 ft.    Vertical TD: 7368 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 8/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:9/14/2024
Proposed Top PZ Location:Sec:3 Twp: 4S 64W Footage: 2602 FNL  330 FWL
Bottom Hole Location:Sec:2 Twp: 4S 64W Footage: 2300 FSL  330 FEL
Proposed Depth/Form:17927 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-1355 , Unit Acreage: 1280, Drill Unit: T4S R64W Sec. 2 & 3:
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 42.09 , Citings Type: PLANNED
Cement:Sacks: 114, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 3037 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 1624, Top: 0 ft., Bottom: 3037 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17927 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2485, Top: , Bottom: 17927 ft.

Wellbore Completed
Completion Date:11/27/2021
Spud Date:10/27/2021Spud Date Is:ACTUAL
Measured TD:17826 ft.Measured PB depth:17814 ft.
True Vertical TD:7368 ft.True Vertical PB depth:7368 ft.
Top PZ Location:Sec:3 Twp: 4S 64WFootage: 2571 FNL  340 FWL
Bottom Hole Location:Sec:2 Twp: 4S 64WFootage: 2208 FSL  329 FEL
Log Types:CBL, MUD, MWD, (COMPOSITE 005-07360)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 115, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 3115 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 1536, Top: 0 ft., Bottom: 3115 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17814 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2795, Top: 2794 ft., Bottom: 17814 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4920 ft.NN
SHANNON5721 ft.NN
SHARON SPRINGS7429 ft.NN
NIOBRARA7511 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 8/1/2024                  Interval Top: 7895 ft.    Interval Bottom: 17694 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/17/2022Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:1/25/2022Treatment End Date:2/14/2022
Treatment Summary:Frac'd Niobrara with 57 stage plug and perf: 15385285 total pounds proppant pumped: 14626690 pounds 40/70 mesh; 758595 pounds 100 mesh. 632424 total bbls fluid pumped: 609527 bbls gelled fluid; 18830 bbls fresh water and 4067 bbls 15% HCl Acid.
Total fluid used in treatment (bbls):632424Max pressure during treatment (psi):9125
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:57
Total acid used in treatment (bbls):4067Min frac gradient (psi/ft):0.82
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):2415
Fresh water used in treatment (bbls):18830Disposition method For flowback:DISPOSAL
Total proppant used (lbs):15385285Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7808 ft.
Tubing Packer Depth:7806 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/2/2022Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 22
BBLS_OIL 6
BTU_GAS 1337
CALC_BBLS_H2O 22
CALC_BBLS_OIL 6
CALC_GOR 12500
CALC_MCF_GAS 75
CASING_PRESS 925
GRAVITY_OIL 39
MCF_GAS 75
TUBING_PRESS 1250
Perforation Data:
Interval Top:7895 ft.# Of Holes:2480
Interval Bottom:17694 ft.Hole Size:0.26 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
April 2024 - March 2025i
Total Oil Produced (Barrels)27771
Total Gas Produced (MCF)80100
GOR2884
GOR DeterminationBOE
Average BOE per Day111.088
Average MCFE per Day644.278

 Federal Financial Assurance  i 

 Tribal Well  i No