Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-005-07267
Well Classification: OW Status: PR - 8/1/2023
Well Name/No:WILDHORSE #5-64 15-16-1BHZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TRUE OIL LLC - 90450
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:89/6121-S
Facility Status:PRStatus Date8/1/2023
FacilityID:449921LocationID:449920
County:ARAPAHOE #005Location:NESE 15 5S64W 6
Field:WILDCAT - #99999Elevation:5936 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2460FSL  440 FELLat/Long: 39.615025 / -104.530988Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.615024 / -104.530988Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/7/2017
End Date: 10/14/2017
Reported: 1/22/2018
Days to report: 100
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 8/1/2023             Measured TD: 18483 ft.    Vertical TD: 7752 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 8/1/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:4/5/2019
Proposed Top PZ Location:Sec:15 Twp: 5S 64W Footage: 328 FNL  621 FEL
Bottom Hole Location:Sec:16 Twp: 5S 64W Footage: 338 FNL  103 FWL
Proposed Depth/Form:18338 ft.
Surface Mineral Owner Same:No
Mineral Owner:STATESurface Owner:STATE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-757 , Unit Acreage: 1280, Drill Unit: 5S64W:15 & 16-All
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 65 , Citings Type: PLANNED
Cement:Sacks: 40, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2100 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 872, Top: 0 ft., Bottom: 2100 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18338 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2751, Top: 0 ft., Bottom: 18338 ft.

Wellbore Completed
Completion Date:9/7/2017
Spud Date:8/11/2017Spud Date Is:ACTUAL
Measured TD:18483 ft.Measured PB depth:18426 ft.
True Vertical TD:7752 ft.True Vertical PB depth:7752 ft.
Top PZ Location:Sec:15 Twp: 5S 64WFootage: 328 FNL  621 FEL
Bottom Hole Location:Sec:16 Twp: 5S 64WFootage: 338 FNL  103 FWL
Log Types:CBL, MUD, MWD, (Resistivity on 005-07269)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 65 , Citings Type: ACTUAL
Cement:Sacks: 216, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2173 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 1000, Top: 0 ft., Bottom: 2185 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18474 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2555, Top: 980 ft., Bottom: 18483 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX5529 ft.NN
SHANNON6104 ft.NN
SHARON SPRINGS8095 ft.NN
NIOBRARA8227 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 8/1/2023                  Interval Top: 8746 ft.    Interval Bottom: 18333 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:12/6/2017Choke Size:30.000 in.
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/30/2017Treatment End Date:10/13/2017
Treatment Summary:Frac 55 stages with 56,224 gal total 15% HCL Acid + 299,591 bbls total base fluids + 1,102,976 lbs 100MESH + 3,858,320 lbs 40/70 sand + 10,055,790 lbs 30/50 sand.
Total fluid used in treatment (bbls):300930Max pressure during treatment (psi):8711
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:55
Total acid used in treatment (bbls):1339Min frac gradient (psi/ft):0.82
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):34706
Fresh water used in treatment (bbls):299591Disposition method For flowback:DISPOSAL
Total proppant used (lbs):15017086Green completions techniques utilized:No
Reason green techniques Not utilized: PIPELINE
Tubing Size:2.875 in.Tubing Setting Depth:8032 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/30/2017Test Method:FLOW
Hours Tested:24Gas Type:SHALE
Gas Disposal:FLARED
Test TypeMeasure
BBLS_H2O 678
BBLS_OIL 767
BTU_GAS 1431
CALC_BBLS_H2O 678
CALC_BBLS_OIL 767
CALC_GOR 785
CALC_MCF_GAS 602
CASING_PRESS 1025
GRAVITY_OIL 40
MCF_GAS 602
TUBING_PRESS 560
Perforation Data:
Interval Top:8746 ft.# Of Holes:1650
Interval Bottom:18333 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)10971
Total Gas Produced (MCF)16337
GOR1489
GOR DeterminationBOE
Average BOE per Day37.795
Average MCFE per Day219.222

 Federal Financial Assurance  i 

 Tribal Well  i No