|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 6/1/2020 Measured TD: 18193 ft. Vertical TD: 7814 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 6/1/2020 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 4/5/2019 | Proposed Top PZ Location: | Sec:15 Twp: 5S 64W | Footage: 342 FSL 759 FEL | Bottom Hole Location: | Sec:16 Twp: 5S 64W | Footage: 333 FSL 101 FWL | Proposed Depth/Form: | 18195 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | STATE | Surface Owner: | STATE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 535-757 , Unit Acreage: 1280, Drill Unit: 5S64W:15 & 16-All | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 65 , Citings Type: PLANNED | Cement: | Sacks: 40, Top: 0 ft., Bottom: 80 ft. | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2100 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 872, Top: 0 ft., Bottom: 2100 ft. | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18195 ft., Weight: 20 , Citings Type: PLANNED | Cement: | Sacks: 2726, Top: 0 ft., Bottom: 18195 ft. |
| | |
Wellbore Completed | Completion Date: | 7/18/2018 | Spud Date: | 5/1/2018 | Spud Date Is: | ACTUAL | Measured TD: | 18193 ft. | Measured PB depth: | 18160 ft. | True Vertical TD: | 7814 ft. | True Vertical PB depth: | 7814 ft. | Top PZ Location: | Sec:15 Twp: 5S 64W | Footage: 342 FSL 759 FEL | Bottom Hole Location: | Sec:16 Twp: 5S 64W | Footage: 333 S 101 W | Log Types: | MUD Log, MWD, CBL Open-hole logs were run on the Powell 5-64 15-16-1CHZ (API: 05-005-07269). | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 65 , Citings Type: ACTUAL | Cement: | Sacks: 216, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2142 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 770, Top: 0 ft., Bottom: 2152 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18183 ft., Weight: 20 , Citings Type: ACTUAL | Cement: | Sacks: 2515, Top: 50 ft., Bottom: 18193 ft., Determination Method: VISU | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 5340 ft. | | N | N | SHANNON | 5846 ft. | | N | N | SHARON SPRINGS | 7744 ft. | | N | N | NIOBRARA | 7853 ft. | | N | N |
Formation NBRR Formation Classification: OW Status: PR - 6/1/2020 Interval Top: 8510 ft. Interval Bottom: 18078 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 1/18/2019 | Choke Size: | 0.000 in. | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 11/17/2018 | Treatment End Date: | 12/4/2018 | Treatment Summary: | The Citadel 5-64 15-16-1CHZ was completed with the following:
13,117 bbls of PD Treated Water, 98,259 bbls of VFR Water 0.5 gpt, 77,989 bbls of VFR Water 1.0 gpt, 114,896 bbls of Hybor G 25#, 160 bbls of Linear Gel 25#, 640 bbls of 15% HCl Acid, 2,346,703 pounds of 100 Mesh and 12,730,241 pounds of 30/50 White utilizing 48 stages with 1,392 perforations.
| Total fluid used in treatment (bbls): | 305061 | Max pressure during treatment (psi): | 4258 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.40 | Type Of gas: | | Number Of staged intervals: | 48 | Total acid used in treatment (bbls): | 640 | Min frac gradient (psi/ft): | 0.81 | Recycled water used in treatment (bbls): | 13117 | Total flowback volume recovered (bbls): | 7994 | Fresh water used in treatment (bbls): | 291305 | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 15076944 | Green completions techniques utilized: | No | Reason green techniques Not utilized: PIPELINE |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7580 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 1/17/2019 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | FLARED | |
Test Type | Measure |
---|
BBLS_H2O | 1117 | BBLS_OIL | 95 | BTU_GAS | 1350 | CALC_BBLS_H2O | 1117 | CALC_BBLS_OIL | 95 | CALC_GOR | 674 | CALC_MCF_GAS | 64 | CASING_PRESS | 2000 | GRAVITY_OIL | 45 | MCF_GAS | 64 | TUBING_PRESS | 1100 |
| Perforation Data: | Interval Top: | 8510 ft. | # Of Holes: | 1392 | Interval Bottom: | 18078 ft. | Hole Size: | 0.4 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 13693 |
Total Gas Produced (MCF) | 20334 |
GOR | 1484 |
GOR Determination | BOE |
Average BOE per Day | 46.977 |
Average MCFE per Day | 272.479 |
Federal Financial Assurance | i | |
|
|