Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-005-07231
Well Classification: OW Status: PR - 10/1/2020
Well Name/No:Tiberius 4-64 8-7 #4CH
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/1/2020
FacilityID:439224LocationID:439225
County:ARAPAHOE #005Location:SESE 8 4S64W 6
Field:WILDCAT - #99999Elevation:5658 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:560FSL  355 FELLat/Long: 39.711756 / -104.565958Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.711756 / -104.565958Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/29/2018
End Date: 1/30/2018
Reported: 3/15/2018
Days to report: 44
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 10/1/2020             Measured TD: 15416 ft.    Vertical TD: 7656 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 10/1/2020
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:2/25/2019
Proposed Top PZ Location:Sec:8 Twp: 4S 64W Footage: 615 FSL  1558 FEL
Bottom Hole Location:Sec:7 Twp: 4S 64W Footage: 780 FSL  2383 FWL
Proposed Depth/Form:15452 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-753 , Unit Acreage: 1280, Drill Unit: Sec. 7-8 ALL
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 39.7 , Citings Type: PLANNED
Cement:Sacks: 50, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1947 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 620, Top: 0 ft., Bottom: 1947 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 15452 ft., Weight: 23 , Citings Type: PLANNED
Cement:Sacks: 1070, Top: 1947 ft., Bottom: 15452 ft.

Wellbore Completed
Completion Date:10/5/2017
Spud Date:9/29/2017Spud Date Is:ACTUAL
Measured TD:15416 ft.Measured PB depth:1767 ft.
True Vertical TD:7656 ft.True Vertical PB depth:1767 ft.
Top PZ Location:Sec:8 Twp: 4S 64WFootage: 615 FSL  1558 FEL
Bottom Hole Location:Sec:7 Twp: 4S 64WFootage: 780 FSL  2383 FWL
Log Types:Resistivity Logs (Gamma Ray, Propagation Resistivity) and MWD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 126 ft., Weight: 39.7 , Citings Type: ACTUAL
Cement:Sacks: 50, Top: 0 ft., Bottom: 126 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1968 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 678, Top: 0 ft., Bottom: 1967 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 15400 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 2045, Top: 1767 ft., Bottom: 15416 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
FOX HILLS1628 ft.1746 ft.NN
PIERRE1746 ft.7488 ft.NN
NIOBRARA7488 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 10/1/2020                 Interval Top: 8265 ft.    Interval Bottom: 15263 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:2/25/2018Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/29/2018Treatment End Date:2/5/2018
Treatment Summary:Treatment consisted of: 8,410,680 gallons of FR Water (FR-76) 90,629 gallons of 15% HCl Acid 612,180 pounds of 100 Mesh 8,538,520 pounds of 40/70
Total fluid used in treatment (bbls):206455Max pressure during treatment (psi):8802
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:29
Total acid used in treatment (bbls):2158Min frac gradient (psi/ft):0.80
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):9330
Fresh water used in treatment (bbls):200254Disposition method For flowback:DISPOSAL
Total proppant used (lbs):9150700Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8140 ft.
Tubing Packer Depth:8112 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/28/2018Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 858
BBLS_OIL 1228
BTU_GAS 1348
CALC_BBLS_H2O 858
CALC_BBLS_OIL 1228
CALC_GOR 1
CALC_MCF_GAS 893
GRAVITY_OIL 40
MCF_GAS 893
TUBING_PRESS 581
Perforation Data:
Interval Top:8265 ft.# Of Holes:1072
Interval Bottom:15263 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)10690
Total Gas Produced (MCF)8913
GOR833
GOR DeterminationBOE
Average BOE per Day33.497
Average MCFE per Day194.280

 Federal Financial Assurance  i 

 Tribal Well  i No