Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-005-07224
Well Classification: OW Status: SI - 5/1/2024
Well Name/No:Sky Ranch 4-65 9-10 #1H
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date5/1/2024
FacilityID:437368LocationID:437367
County:ARAPAHOE #005Location:NENE 10 4S65W 6
Field:DJ HORIZONTAL NIOBRARA - #16950Elevation:5699 ft.
Planned Location:660FNL  350 FELLat/Long: 39.723814 / -104.642000Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.723814 / -104.642000Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/9/2014
End Date: 12/20/2014
Reported: 1/12/2015
Days to report: 23
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 5/1/2024             Measured TD: 17305 ft.    Vertical TD: 7958 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 5/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:5/26/2016
Proposed Top PZ Location:Sec:10 Twp: 4S 65W Footage: 663 FNL  1262 FEL
Bottom Hole Location:Sec:9 Twp: 4S 65W Footage: 676 FNL  488 FWL
Proposed Depth/Form:17333 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-448 , Unit Acreage: 1280, Drill Unit: S.9&10:All
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 39.7 , Citings Type: PLANNED
Cement:Sacks: 50, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2199 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 690, Top: 0 ft., Bottom: 2199 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 17333 ft., Weight: 23 , Citings Type: PLANNED
Cement:Sacks: 2170, Top: 2099 ft., Bottom: 17333 ft.

Wellbore Completed
Completion Date:9/22/2014
Spud Date:9/6/2014Spud Date Is:ACTUAL
Measured TD:17305 ft.Measured PB depth:17294 ft.
True Vertical TD:7958 ft.True Vertical PB depth:7958 ft.
Top PZ Location:Sec:10 Twp: 4S 65WFootage: 663 FNL  1262 FEL
Bottom Hole Location:Sec:9 Twp: 4S 65WFootage: 676 FNL  488 FWL
Log Types:LWD, Mud, CBL
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: CMP , Citings Type: ACTUAL
Cement:Sacks: 50, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2207 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 690, Top: 0 ft., Bottom: 2207 ft., Determination Method: VISU
Casing:String Type: 1ST LINER, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 17294 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 2465, Top: 2103 ft., Bottom: 17294 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SHANNON5103 ft.NN
SUSSEX5594 ft.NN
SHARON SPRINGS7702 ft.NN
NIOBRARA7780 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  SI - 5/1/2024                  Interval Top: 8282 ft.    Interval Bottom: 17173 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/10/2014Treatment End Date:12/20/2014
Treatment Summary:Frac 48 stages with 11,850,906 lbs total proppant including 1,452,738 lbs 100 Mesh + 10,398,168 lbs 40/70 in 277,493 bbls total base fluids.
Total fluid used in treatment (bbls):277493Max pressure during treatment (psi):8841
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:48
Total acid used in treatment (bbls):3357Min frac gradient (psi/ft):0.85
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):14714
Fresh water used in treatment (bbls):274136Disposition method For flowback:DISPOSAL
Total proppant used (lbs):11850906Green completions techniques utilized:No
Reason green techniques Not utilized: PIPELINE
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 536
BBLS_OIL 1613
BTU_GAS 1432
CALC_BBLS_H2O 536
CALC_BBLS_OIL 1613
CALC_GOR 1661
CALC_MCF_GAS 2679
GRAVITY_OIL 41
MCF_GAS 2679
TUBING_PRESS 690
Perforation Data:
Interval Top:8282 ft.# Of Holes:1462
Interval Bottom:17173 ft.Hole Size:0.375 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2024 - January 2025i
Total Oil Produced (Barrels)1219
Total Gas Produced (MCF)5300
GOR4347
GOR DeterminationBOE
Average BOE per Day5.925
Average MCFE per Day34.376

 Federal Financial Assurance  i 

 Tribal Well  i No