Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-005-07224
Well Classification: OW Status: PR - 5/1/2025
Well Name/No:Sky Ranch 4-65 9-10 #1H
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/1/2025
FacilityID:437368LocationID:437367
County:ARAPAHOE #005Location:NENE 10 4S65W 6
Field:DJ HORIZONTAL NIOBRARA - #16950Elevation:5699 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:660FNL  350 FELLat/Long: 39.723814 / -104.642000Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.723814 / -104.642000Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/9/2014
End Date: 12/20/2014
Reported: 1/12/2015
Days to report: 23
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 5/1/2025             Measured TD: 17305 ft.    Vertical TD: 7958 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 5/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:5/26/2016
Proposed Top PZ Location:Sec:10 Twp: 4S 65W Footage: 663 FNL  1262 FEL
Bottom Hole Location:Sec:9 Twp: 4S 65W Footage: 676 FNL  488 FWL
Proposed Depth/Form:17333 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-448 , Unit Acreage: 1280, Drill Unit: S.9&10:All
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 39.7 , Citings Type: PLANNED
Cement:Sacks: 50, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2199 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 690, Top: 0 ft., Bottom: 2199 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 17333 ft., Weight: 23 , Citings Type: PLANNED
Cement:Sacks: 2170, Top: 2099 ft., Bottom: 17333 ft.

Wellbore Completed
Completion Date:9/22/2014
Spud Date:9/6/2014Spud Date Is:ACTUAL
Measured TD:17305 ft.Measured PB depth:17294 ft.
True Vertical TD:7958 ft.True Vertical PB depth:7958 ft.
Top PZ Location:Sec:10 Twp: 4S 65WFootage: 663 FNL  1262 FEL
Bottom Hole Location:Sec:9 Twp: 4S 65WFootage: 676 FNL  488 FWL
Log Types:LWD, Mud, CBL
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: CMP , Citings Type: ACTUAL
Cement:Sacks: 50, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2207 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 690, Top: 0 ft., Bottom: 2207 ft., Determination Method: VISU
Casing:String Type: 1ST LINER, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 17294 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 2465, Top: 2103 ft., Bottom: 17294 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SHANNON5103 ft.NN
SUSSEX5594 ft.NN
SHARON SPRINGS7702 ft.NN
NIOBRARA7780 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 5/1/2025                  Interval Top: 8282 ft.    Interval Bottom: 17173 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/10/2014Treatment End Date:12/20/2014
Treatment Summary:Frac 48 stages with 11,850,906 lbs total proppant including 1,452,738 lbs 100 Mesh + 10,398,168 lbs 40/70 in 277,493 bbls total base fluids.
Total fluid used in treatment (bbls):277493Max pressure during treatment (psi):8841
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:48
Total acid used in treatment (bbls):3357Min frac gradient (psi/ft):0.85
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):14714
Fresh water used in treatment (bbls):274136Disposition method For flowback:DISPOSAL
Total proppant used (lbs):11850906Green completions techniques utilized:No
Reason green techniques Not utilized: PIPELINE
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 536
BBLS_OIL 1613
BTU_GAS 1432
CALC_BBLS_H2O 536
CALC_BBLS_OIL 1613
CALC_GOR 1661
CALC_MCF_GAS 2679
GRAVITY_OIL 41
MCF_GAS 2679
TUBING_PRESS 690
Perforation Data:
Interval Top:8282 ft.# Of Holes:1462
Interval Bottom:17173 ft.Hole Size:0.375 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)11552
Total Gas Produced (MCF)32365
GOR2801
GOR DeterminationBOE
Average BOE per Day46.804
Average MCFE per Day271.470

 Federal Financial Assurance  i 

 Tribal Well  i No