Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-005-07222
Well Classification: OW Status: PR - 4/1/2025
Well Name/No:State Elbert #1H
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:1960.12
Facility Status:PRStatus Date4/1/2025
FacilityID:436510LocationID:436514
County:ARAPAHOE #005Location:SENE 2 5S65W 6
Field:DJ HORIZONTAL NIOBRARA - #16950Elevation:5857 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1367FNL  387 FELLat/Long: 39.649072 / -104.623864Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.649069 / -104.623864Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/15/2014
End Date: 10/20/2014
Reported: 12/16/2015
Days to report: 422
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 4/1/2025             Measured TD: 12263 ft.    Vertical TD: 7817 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 4/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/22/2016
Proposed Top PZ Location:Sec:1 Twp: 5S 65W Footage: 669 FNL  617 FWL
Bottom Hole Location:Sec:1 Twp: 5S 65W Footage: 681 FNL  621 FEL
Proposed Depth/Form:12377 ft.
Surface Mineral Owner Same:No
Mineral Owner:STATESurface Owner:STATE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 39.7 , Citings Type: PLANNED
Cement:Sacks: 50, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2238 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 630, Top: 0 ft., Bottom: 2238 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 12377 ft., Weight: 23 , Citings Type: PLANNED
Cement:Sacks: 1500, Top: 2138 ft., Bottom: 12377 ft.

Wellbore Completed
Completion Date:8/30/2014
Spud Date:7/29/2014Spud Date Is:ACTUAL
Measured TD:12263 ft.Measured PB depth:12209 ft.
True Vertical TD:7817 ft.True Vertical PB depth:7817 ft.
Top PZ Location:Sec:1 Twp: 5S 65WFootage: 669 FNL  617 FWL
Bottom Hole Location:Sec:1 Twp: 5S 65WFootage: 681 FNL  621 FEL
Log Types:LWD, Mud, CBL
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: CMP , Citings Type: ACTUAL
Cement:Sacks: 50, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2239 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 700, Top: 0 ft., Bottom: 2239 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 12209 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 1595, Top: 1960 ft., Bottom: 12209 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SHANNON5160 ft.NN
SUSSEX5444 ft.NN
SHARON SPRINGS7850 ft.NN
NIOBRARA8040 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 4/1/2025                  Interval Top: 8228 ft.    Interval Bottom: 12043 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:12/29/2014Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/15/2014Treatment End Date:10/21/2014
Treatment Summary:Frac 22 stages w/ 7,457,000 lbs total proppant including 430,680 lbs White 40/70 + 6,591,500 lbs White 20/40 + 434,820 lbs CRC 20/40 in 100,786 bbls total base fluids.
Total fluid used in treatment (bbls):100786Max pressure during treatment (psi):9007
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:22
Total acid used in treatment (bbls):1115Min frac gradient (psi/ft):0.86
Recycled water used in treatment (bbls):3088Total flowback volume recovered (bbls):9212
Fresh water used in treatment (bbls):96583Disposition method For flowback:DISPOSAL
Total proppant used (lbs):7457000Green completions techniques utilized:No
Reason green techniques Not utilized: PIPELINE
Tubing Size:2.375 in.Tubing Setting Depth:7630 ft.
Tubing Packer Depth:7603 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/12/2015Test Method:Flow
Hours Tested:24Gas Type:SHALE
Gas Disposal:FLARED
Test TypeMeasure
BBLS_H2O 221
BBLS_OIL 481
BTU_GAS 1432
CALC_BBLS_H2O 221
CALC_BBLS_OIL 481
CALC_GOR 1089
CALC_MCF_GAS 524
GRAVITY_OIL 41
MCF_GAS 524
TUBING_PRESS 440
Perforation Data:
Interval Top:8228 ft.# Of Holes:528
Interval Bottom:12043 ft.Hole Size:0.375 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)2361
Total Gas Produced (MCF)715
GOR302
GOR DeterminationBOE
Average BOE per Day6.778
Average MCFE per Day39.331

 Federal Financial Assurance  i 

 Tribal Well  i No