Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-005-07215
Well Classification: OW Status: PA - 11/22/2024
Well Name/No:Cottonwood Creek 4-65 27 #1H
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date11/22/2024
FacilityID:435170LocationID:435169
Municipality/County:AURORA / ARAPAHOE #005Location:SWNW 27 4S65W 6
Field:DJ HORIZONTAL NIOBRARA - #16950Elevation:5707 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1750FNL  325 FWLLat/Long: 39.677161 / -104.658414Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.677161 / -104.658414Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/4/2014
End Date: 5/9/2014
Reported: 5/20/2014
Days to report: 11
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 2/22/2014             Measured TD: 8248 ft.    Vertical TD: 8240 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 2/22/2014
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:11/22/2015
Proposed Top PZ Location:Sec:27 Twp: 4S 65W Footage: 1977 FNL  330 FWL
Bottom Hole Location:Sec:27 Twp: 4S 65W Footage: 1977 FNL  332 FWL
Proposed Depth/Form:8297 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-100 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 39.7 , Citings Type: PLANNED
Cement:Sacks: 50, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2146 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 610, Top: 0 ft., Bottom: 2146 ft.
Casing:String Type: OPEN HOLE, Hole Size: 8.75 in., Size: , Top: 2146 ft., Depth: 8297 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:3/5/2014
Spud Date:2/22/2014Spud Date Is:ACTUAL
Measured TD:8248 ft.Measured PB depth:7079 ft.
True Vertical TD:8240 ft.True Vertical PB depth:7072 ft.
Bottom Hole Location:Sec:27 Twp: 4S 65WFootage: 1977 FNL  332 FWL
Log Types:Gamma Ray, Mud
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: CMP , Citings Type: ACTUAL
Cement:Sacks: 50, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2157 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 680, Top: 0 ft., Bottom: 2157 ft., Determination Method: VISU
Casing:String Type: OPEN HOLE, Hole Size: 8.75 in., Size: , Top: 2157 ft., Depth: 8248 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
Additional Cement:String Type: OPEN HOLE , Top: 7079 ft., Depth: 7287 ft., Bottom: 8248 ft., Sacks: 325, Method:
FormationInterval TopLog BottomCoredDSTs
SHANNON5035 ft.NN
SUSSEX5378 ft.NN
SHARON SPRINGS7684 ft.7781 ft.NN
NIOBRARA7781 ft.8092 ft.NN
FORT HAYS8092 ft.8118 ft.NN
CARLILE8118 ft.NN
  No formation data to display.

Sidetrack #01             Wellbore Classification: OW             Status: AB - 11/22/2024             Measured TD: 12126 ft.    Vertical TD: 7863 ft.

 Wellbore Data for Sidetrack #01Wellbore Classification: OW        AB - 11/22/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:11/22/2015
Proposed Top PZ Location:Sec:27 Twp: 4S 65W Footage: 2046 FNL  822 FWL
Bottom Hole Location:Sec:27 Twp: 4S 65W Footage: 1986 FNL  499 FEL
Proposed Depth/Form:12126 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-100 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 39.7 , Citings Type: PLANNED
Cement:Sacks: 50, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2146 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 610, Top: 0 ft., Bottom: 2146 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8260 ft., Weight: 32 , Citings Type: PLANNED
Cement:Sacks: 560, Top: 2046 ft., Bottom: 8260 ft.
Casing:String Type: 1ST LINER, Hole Size: 6 in., Size: 4.5 in., Top: 7250 ft., Depth: 12126 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:3/20/2014
Spud Date:2/22/2014Spud Date Is:ACTUAL
Measured TD:12126 ft.Measured PB depth:12116 ft.
True Vertical TD:7863 ft.True Vertical PB depth:7863 ft.
Top PZ Location:Sec:27 Twp: 4S 65WFootage: 2046 FNL  822 FWL
Bottom Hole Location:Sec:27 Twp: 4S 65WFootage: 1986 FNL  499 FEL
Log Types:MWD, Triple combo, Mud, CBL, resistivity
Casing:String Type: CONDUCTOR, Hole Size: , Size: , Top: 0 ft., Depth: 100 ft., Weight: 65 , Citings Type: ACTUAL
Cement:Sacks: 50, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2157 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 680, Top: 0 ft., Bottom: 2157 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: , Top: 0 ft., Depth: 8161 ft., Weight: 32 , Citings Type: ACTUAL
Cement:Sacks: 525, Top: 3150 ft., Bottom: 8161 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: , Size: 4.5 in., Top: 7153 ft., Depth: 12116 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: 350, Top: 7185 ft., Bottom: 12116 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SHANNON5035 ft.NN
SUSSEX5378 ft.NN
SHARON SPRINGS7702 ft.7825 ft.NN
NIOBRARA7825 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  AB - 11/22/2024                Interval Top: 8213 ft.    Interval Bottom: 12000 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/4/2014Treatment End Date:6/9/2014
Treatment Summary:Frac 22 stages with 69,805 bbls fresh water and 3,821,288 lbs total proppant including 188,481 lbs 40/70 + 3,340,683 lbs 20/40 + 292,124 lbs CRC 20/40.
Total fluid used in treatment (bbls):7123179Max pressure during treatment (psi):8528
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:22
Total acid used in treatment (bbls):1381Min frac gradient (psi/ft):0.85
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):8205
Fresh water used in treatment (bbls):69850Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3821288Green completions techniques utilized:No
Reason green techniques Not utilized: PIPELINE
Tubing Size:2.375 in.Tubing Setting Depth:7232 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 211
BBLS_OIL 666
BTU_GAS 1432
CALC_BBLS_H2O 211
CALC_BBLS_OIL 666
CALC_GOR 1186
CALC_MCF_GAS 790
GRAVITY_OIL 44
MCF_GAS 790
TUBING_PRESS 700
Perforation Data:
Interval Top:8213 ft.# Of Holes:475
Interval Bottom:12000 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY11/22/2024
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2027
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No