|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 5/18/2013 Measured TD: 7780 ft. Vertical TD: 7775 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 5/18/2013 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 2/20/2015 | | Proposed Top PZ Location: | Sec:12 Twp: 4S 64W | Footage: 649 FSL 216 FEL | | Bottom Hole Location: | Sec:12 Twp: 4S 64W | Footage: 649 FSL 216 FEL | | Proposed Depth/Form: | 7728 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 535-203 , Unit Acreage: 640, Drill Unit: ALL | | Casing: | String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 0 , Citings Type: PLANNED | | Cement: | Sacks: 50, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1950 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 630, Top: 0 ft., Bottom: 1950 ft. | | Casing: | String Type: OPEN HOLE, Hole Size: , Size: , Top: 1950 ft., Depth: 7728 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 5/24/2013 | | Spud Date: | 5/17/2013 | Spud Date Is: | ACTUAL | | Measured TD: | 7780 ft. | Measured PB depth: | 6623 ft. | | True Vertical TD: | 7775 ft. | True Vertical PB depth: | | | Bottom Hole Location: | Sec:12 Twp: 4S 64W | Footage: 649 FSL 216 FEL | | Log Types: | Triple Combo/GR, CBL, Platform Express Cement Volume, Sonic,MWD
CM/ACE
CM/CI | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: CMP , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1970 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 1040, Top: 0 ft., Bottom: 1970 ft., Determination Method: VISU | | Casing: | String Type: OPEN HOLE, Hole Size: 8.75 in., Size: , Top: 1970 ft., Depth: 7786 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: | | Additional Cement: | String Type: OPEN HOLE , Top: 6805 ft., Depth: 7743 ft., Bottom: 7743 ft., Sacks: 320, Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PIERRE | 1765 ft. | | N | N | | SHARON SPRINGS | 7188 ft. | 7244 ft. | N | N | | NIOBRARA | 7244 ft. | 7576 ft. | N | N | | FORT HAYS | 7576 ft. | 7604 ft. | N | N | | CARLILE | 7604 ft. | 7674 ft. | N | N | | GREENHORN | 7674 ft. | | N | N | | No formation data to display. |
Sidetrack #01 Wellbore Classification: OW Status: SI - 6/1/2025 Measured TD: 11725 ft. Vertical TD: 7449 ft.| Wellbore Data for Sidetrack #01 | Wellbore Classification: OW SI - 6/1/2025 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 2/20/2015 | | Proposed Top PZ Location: | Sec:12 Twp: 4S 64W | Footage: 680 FSL 809 FEL | | Bottom Hole Location: | Sec:12 Twp: 4S 64W | Footage: 654 FSL 482 FWL | | Proposed Depth/Form: | 11664 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 535-203 , Unit Acreage: 640, Drill Unit: ALL | | Casing: | String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 0 , Citings Type: PLANNED | | Cement: | Sacks: 50, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1950 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 630, Top: 0 ft., Bottom: 1950 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7691 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 530, Top: 1850 ft., Bottom: 7691 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6691 ft., Depth: 11664 ft., Weight: 13.5 , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 6/3/2013 | | Spud Date: | 5/17/2013 | Spud Date Is: | ACTUAL | | Measured TD: | 11725 ft. | Measured PB depth: | 11725 ft. | | True Vertical TD: | 7449 ft. | True Vertical PB depth: | 7449 ft. | | Top PZ Location: | Sec:12 Twp: 4S 64W | Footage: 680 FSL 809 FEL | | Bottom Hole Location: | Sec:12 Twp: 4S 64W | Footage: 654 FSL 482 FWL | | Log Types: | LWD, Mud, CBL, CM/ACE,CM/CI
| | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: CMP , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1970 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 1040, Top: 0 ft., Bottom: 1970 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7737 ft., Weight: 32 , Citings Type: ACTUAL | | Cement: | Sacks: 530, Top: 1600 ft., Bottom: 7737 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 6 in., Size: 4.5 in., Top: 6717 ft., Depth: 11715 ft., Weight: 13.5 , Citings Type: ACTUAL | | Cement: | Sacks: 0, Top: , Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SHARON SPRINGS | 7214 ft. | 7300 ft. | N | N | | NIOBRARA | 7300 ft. | | N | N |
Formation NBRR Formation Classification: OW Status: SI - 6/1/2025 Interval Top: 7737 ft. Interval Bottom: 11725 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 2/7/2014 | Choke Size: | 17.000 in. | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | Yes |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 12/11/2013 | Treatment End Date: | 12/17/2013 | | Treatment Summary: | Frac 20 stages with 4,285,981 gal (102,047 bbls) fresh water + 6,964,063 lbs proppant including 408,460 lbs 40/70 + 6,105,961 lbs 20/40 + 449,624 lbs 20/40 CRC. | | Total fluid used in treatment (bbls): | 102047 | Max pressure during treatment (psi): | 8259 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.33 | | Type Of gas: | | Number Of staged intervals: | 20 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.83 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 12592 | | Fresh water used in treatment (bbls): | 102047 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 6964063 | Green completions techniques utilized: | No | | Reason green techniques Not utilized: PIPELINE |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6696 ft. | | Tubing Packer Depth: | 6667 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/14/2014 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | FLARED | |
| Test Type | Measure |
|---|
| BBLS_H2O | 388 | | BBLS_OIL | 162 | | BTU_GAS | 1432 | | CALC_BBLS_H2O | 388 | | CALC_BBLS_OIL | 162 | | CALC_GOR | 747 | | CALC_MCF_GAS | 121 | | CASING_PRESS | 15 | | GRAVITY_OIL | 39 | | MCF_GAS | 121 | | TUBING_PRESS | 356 |
| | Perforation Data: | | Interval Top: | 7737 ft. | # Of Holes: | 568 | | Interval Bottom: | 11725 ft. | Hole Size: | 0.375 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 01/2025 - 12/2025 |
| Total Oil Produced (Barrels) | 143 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | BOE |
| Average BOE per Day | 0.384 |
| Average MCFE per Day | 2.228 |
| Federal Financial Assurance | i | |
|
|