Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-005-07189
Well Classification: OW Status: PR - 4/1/2025
Well Name/No:WATKINS #30-5-8H
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/1/2025
FacilityID:429807LocationID:429810
Municipality/County:AURORA / ARAPAHOE #005Location:SWNW 30 4S64W 6
Field:DJ HORIZONTAL NIOBRARA - #16950Elevation:5765 ft.
Planned Location:2280FNL  350 FWLLat/Long: 39.675472 / -104.602253Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.675472 / -104.602250Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/12/2014
End Date: 7/2/2014
Reported: 7/8/2014
Days to report: 6
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 3/6/2014             Measured TD: 8203 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 3/6/2014
Wellbore Permit
Permit #:Expiration Date:8/2/2014
Proposed Top PZ Location:Sec:30 Twp: 4S 64W Footage: 2280 FNL  350 FWL
Bottom Hole Location:Sec:30 Twp: 4S 64W Footage: 2280 FNL  350 FWL
Proposed Depth/Form:8203 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-447 , Unit Acreage: 640, Drill Unit: S.30:All
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 39.7 , Citings Type: PLANNED
Cement:Sacks: 50, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2060 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 580, Top: 0 ft., Bottom: 2060 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8169 ft., Weight: 26# , Citings Type: PLANNED
Cement:Sacks: 720, Top: 0 ft., Bottom: 8169 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7127 ft., Depth: 12525 ft., Weight: 11.6# , Citings Type: PLANNED
Cement:Sacks: 0, Top: , Bottom:
Casing:String Type: OPEN HOLE, Hole Size: 9.625 in., Size: 0 in., Top: 2060 ft., Depth: 8203 ft., Weight: 0 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:3/2/2014
Spud Date:3/1/2014Spud Date Is:ACTUAL
Measured TD:8203 ft.Measured PB depth:6925 ft.
True Vertical TD:True Vertical PB depth:
Log Types:LWD, MUD, Wireline
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: CMP , Citings Type: ACTUAL
Cement:Sacks: 50, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2052 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 650, Top: 0 ft., Bottom: 2052 ft., Determination Method: VISU
Casing:String Type: OPEN HOLE, Hole Size: 8.75 in., Size: , Top: 2052 ft., Depth: 8203 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
Additional Cement:String Type: OPEN HOLE , Top: 6976 ft., Depth: 7176 ft., Bottom: 8203 ft., Sacks: 340, Method:
FormationInterval TopLog BottomCoredDSTs
SUSSEX4922 ft.5070 ft.NN
SHANNON5257 ft.5470 ft.NN
SHARON SPRINGS7534 ft.7662 ft.NN
NIOBRARA7662 ft.7972 ft.NN
FORT HAYS7972 ft.8000 ft.NN
CARLILE8000 ft.8064 ft.NN
GREENHORN8064 ft.NN
  No formation data to display.

Sidetrack #01             Wellbore Classification: OW             Status: PR - 4/1/2025             Measured TD: 12116 ft.    Vertical TD: 7736 ft.

 Wellbore Data for Sidetrack #01Wellbore Classification: OW        PR - 4/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:1/21/2016
Proposed Top PZ Location:Sec:30 Twp: 4S 64W Footage: 2300 FNL  930 FWL
Bottom Hole Location:Sec:30 Twp: 4S 64W Footage: 2226 FNL  460 FEL
Proposed Depth/Form:12158 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-447 , Unit Acreage: 640, Drill Unit: S. 30:All
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 39.7 , Citings Type: PLANNED
Cement:Sacks: 50, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2060 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 580, Top: 0 ft., Bottom: 2060 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 12158 ft., Weight: 23 , Citings Type: PLANNED
Cement:Sacks: 1170, Top: 1950 ft., Bottom: 12158 ft.

Wellbore Completed
Completion Date:3/17/2014
Spud Date:3/1/2014Spud Date Is:ACTUAL
Measured TD:12116 ft.Measured PB depth:12106 ft.
True Vertical TD:7736 ft.True Vertical PB depth:7736 ft.
Top PZ Location:Sec:30 Twp: 4S 64WFootage: 2302 FNL  943 FWL
Bottom Hole Location:Sec:30 Twp: 4S 64WFootage: 2231 FNL  482 FEL
Log Types:LWD, Mud, CBL
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: CMP , Citings Type: ACTUAL
Cement:Sacks: 50, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2052 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 650, Top: 0 ft., Bottom: 2052 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 12106 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 1425, Top: 2880 ft., Bottom: 12106 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4922 ft.5070 ft.NN
SHANNON5257 ft.5470 ft.NN
SHARON SPRINGS7557 ft.7724 ft.NN
NIOBRARA7724 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 4/1/2025                  Interval Top: 8191 ft.    Interval Bottom: 11936 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/30/2014Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/12/2014Treatment End Date:7/2/2014
Treatment Summary:Frac 22 stages w/ 6,845,454 lbs total proppant including 596,980 lbs 100 Mesh + 5,799,982 lbs 40/70 + 448,492 lbs CRC 40/70 in 171,167 bbls total base fluids.
Total fluid used in treatment (bbls):171167Max pressure during treatment (psi):8677
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:22
Total acid used in treatment (bbls):2095Min frac gradient (psi/ft):0.80
Recycled water used in treatment (bbls):4165Total flowback volume recovered (bbls):13778
Fresh water used in treatment (bbls):164907Disposition method For flowback:DISPOSAL
Total proppant used (lbs):6845454Green completions techniques utilized:No
Reason green techniques Not utilized: PIPELINE
Tubing Size:2.375 in.Tubing Setting Depth:7185 ft.
Tubing Packer Depth:7155 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/17/2014Test Method:Flow
Hours Tested:24Gas Type:SHALE
Gas Disposal:FLARED
Test TypeMeasure
BBLS_H2O 245
BBLS_OIL 506
BTU_GAS 1432
CALC_BBLS_H2O 245
CALC_BBLS_OIL 506
CALC_GOR 1320
CALC_MCF_GAS 668
GRAVITY_OIL 41
MCF_GAS 668
TUBING_PRESS 500
Perforation Data:
Interval Top:8191 ft.# Of Holes:624
Interval Bottom:11936 ft.Hole Size:0.375 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)4028
Total Gas Produced (MCF)1522
GOR377
GOR DeterminationBOE
Average BOE per Day11.759
Average MCFE per Day68.196

 Federal Financial Assurance  i 

 Tribal Well  i No