Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-005-07178
Well Classification: OW Status: SI - 4/1/2025
Well Name/No:Tebo 32 #3H
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date4/1/2025
FacilityID:427918LocationID:427920
County:ARAPAHOE #005Location:SESW 32 4S64W 6
Field:DJ HORIZONTAL NIOBRARA - #16950Elevation:5968 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:350FSL  1980 FWLLat/Long: 39.653308 / -104.577633Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.653308 / -104.577633Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/6/2012
End Date: 8/6/2012
Reported: 5/29/2013
Days to report: 296
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 5/25/2012             Measured TD: 8300 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 5/25/2012
Wellbore PermitDRIFTED
Permit #:Expiration Date:2/25/2014
Proposed Top PZ Location:Sec:32 Twp: 4S 64W Footage: 871 FSL  1980 FWL
Bottom Hole Location:Sec:32 Twp: 4s 64w Footage: 746 FSL  2005 FWL
Proposed Depth/Form:8236 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-118 , Unit Acreage: 640, Drill Unit: Sec 32
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 60 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 50, Top: 0 ft., Bottom: 60 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2210 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 690, Top: 0 ft., Bottom: 2210 ft.
Casing:String Type: OPEN HOLE, Hole Size: 8.75 in., Size: , Top: 2210 ft., Depth: 8236 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:5/30/2012
Spud Date:5/27/2012Spud Date Is:Actual
Measured TD:8300 ft.Measured PB depth:7299 ft.
True Vertical TD:True Vertical PB depth:
Bottom Hole Location:Sec:32 Twp: 4s 64wFootage: 746 FSL  2005 FWL
Log Types:Caliper, Induction, Neutron, Triple Combo, Mud, Gamma Ray
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 117 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 50, Top: 0 ft., Bottom: 117 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2221 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 710, Top: 0 ft., Bottom: 2221 ft., Determination Method: VISU
Casing:String Type: OPEN HOLE, Hole Size: 8.75 in., Size: , Top: 2221 ft., Depth: 8300 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
Additional Cement:String Type: OPEN HOLE , Top: 7299 ft., Depth: 7270 ft., Bottom: 8300 ft., Sacks: 345, Method:
FormationInterval TopLog BottomCoredDSTs
SUSSEX5087 ft.
SHANNON5362 ft.
SHARON SPRINGS7682 ft.
NIOBRARA7767 ft.
FORT HAYS8076 ft.
CODELL8108 ft.
GREENHORN8175 ft.
  No formation data to display.

Sidetrack #01             Wellbore Classification: OW             Status: SI - 4/1/2025             Measured TD: 11938 ft.    Vertical TD: 7927 ft.

 Wellbore Data for Sidetrack #01Wellbore Classification: OW        SI - 4/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:4/19/2014
Proposed Top PZ Location:Sec:32 Twp: 4S 64W Footage: 463 FSL  1992 FWL
Bottom Hole Location:Sec:32 Twp: 4S 64W Footage: 655 FNL  2077 FWL
Proposed Depth/Form:11868 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-118 , Unit Acreage: 640, Drill Unit: Sec 32
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 60 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 50, Top: 0 ft., Bottom: 60 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2210 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 690, Top: 0 ft., Bottom: 2210 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8042 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 530, Top: 2110 ft., Bottom: 8042 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7124 ft., Depth: 11868 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 296, Top: 7124 ft., Bottom: 11868 ft.

Wellbore Completed
Completion Date:6/29/2012
Spud Date:5/27/2012Spud Date Is:ACTUAL
Measured TD:11938 ft.Measured PB depth:11938 ft.
True Vertical TD:7927 ft.True Vertical PB depth:7927 ft.
Top PZ Location:Sec:32 Twp: 4S 64WFootage: 463 FSL  1992 FWL
Bottom Hole Location:Sec:32 Twp: 4S 64WFootage: 655 FNL  2077 FWL
Log Types:Mud, Gamma Ray, CBL, Combination Open Hole.
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 117 ft., Weight: 0 , Citings Type: ACTUAL
Cement:Sacks: 50, Top: 0 ft., Bottom: 117 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2221 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 710, Top: 0 ft., Bottom: 2221 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8289 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 820, Top: 1970 ft., Bottom: 8289 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7236 ft., Depth: 11928 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
NIOBRARA7772 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  SI - 2/1/2025                  Interval Top: 8289 ft.    Interval Bottom: 11938 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/23/2012Choke Size:0.000 in.
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/6/2012Treatment End Date:8/8/2012
Treatment Summary:Frac 20 stages thru sliding sleeves with 2,953,313 gallons (70,317 bbls) fresh water gel + 3,308,281 lbs sand proppant.
Total fluid used in treatment (bbls):70317Max pressure during treatment (psi):8214
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:20
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.87
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):17310
Fresh water used in treatment (bbls):70317Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3308281Green completions techniques utilized:No
Reason green techniques Not utilized: PIPELINE
Tubing Size:2.875 in.Tubing Setting Depth:7220 ft.
Tubing Packer Depth:7200 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/3/2013Test Method:Flow
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 37
BBLS_OIL 57
BTU_GAS 1466
CALC_BBLS_H2O 37
CALC_BBLS_OIL 57
CALC_GOR 5052
CALC_MCF_GAS 288
CASING_PRESS 726
GRAVITY_OIL 37
MCF_GAS 288
TUBING_PRESS 556
Perforation Data:
Interval Top:8289 ft.# Of Holes:20
Interval Bottom:11938 ft.Hole Size:
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)117
Total Gas Produced (MCF)0
GOR
GOR DeterminationBOE
Average BOE per Day0.315
Average MCFE per Day1.825

 Federal Financial Assurance  i 

 Tribal Well  i No