|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 9/1/2025 Measured TD: 7388 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 9/1/2025 | | Wellbore Permit | | | Permit #: | 19730980 | Expiration Date: | 11/29/1974 | | Proposed Depth/Form: | 7400 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | STATE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: DJSND , Formation: D & J SAND , Order: 0 , Unit Acreage: 80, Drill Unit: W2NE |
| | |
| Wellbore Completed | | Completion Date: | 1/27/1975 | | Spud Date: | 11/29/1973 | Spud Date Is: | ACTUAL | | Measured TD: | 7388 ft. | Measured PB depth: | | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | IES & FDC | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 98 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: , Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7388 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 0 ft., Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | FOX HILLS | 925 ft. | | | | | NIOBRARA | 6395 ft. | | | | | D SAND | 7180 ft. | | | | | J SAND | 7234 ft. | | | |
Formation JSND Formation Classification: OW Status: PR - 9/1/2025 Interval Top: 7273 ft. Interval Bottom: 7303 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 1/24/1974 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | PUMPING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 1/27/1975 | | Treatment Summary: | SEE SCAN DOCUMENT # 420536 |
| | Tubing Size: | 2 in. | Tubing Setting Depth: | 7234 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/4/1974 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | VENTED | |
| Test Type | Measure |
|---|
| BBLS_H2O | 10 | | BBLS_OIL | 42 |
| | Perforation Data: | | Interval Top: | 7273 ft. | # Of Holes: | 16 | | Interval Bottom: | 7303 ft. | Hole Size: | |
|
Formation DJSND Formation Classification: OW Status: CM - 8/20/1980 Interval Top: 7186 ft. Interval Bottom: 7303 ft.| Completed Information for Formation D & J SAND | | 1st Production Date: | 1/24/1974 | Choke Size: | 0.000 in. | | Formation Name: | D & J SAND | Commingled: | Yes | | Production Method: | PUMPING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 1/27/1975 | | Treatment Summary: | SEE SCAN DOCUMENT # 420538 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation DJSND. |
| | Perforation Data: | | Interval Top: | 7186 ft. | # Of Holes: | 32 | | Interval Bottom: | 7303 ft. | Hole Size: | |
|
Formation DSND Formation Classification: OW Status: PR - 9/1/2025 Interval Top: 7186 ft. Interval Bottom: 7191 ft.| Completed Information for Formation D SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | D SAND | Commingled: | Yes | | Production Method: | PUMPING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 1/27/1975 | | Treatment Summary: | SEE SCAN DOCUMENT # 420538 |
| | Tubing Size: | 2 in. | Tubing Setting Depth: | 7234 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/11/1975 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | VENTED | |
| Test Type | Measure |
|---|
| BBLS_OIL | 100 |
| | Perforation Data: | | Interval Top: | 7186 ft. | # Of Holes: | 16 | | Interval Bottom: | 7191 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 16 |
| Total Gas Produced (MCF) | 16 |
| GOR | 1000 |
| GOR Determination | BOE |
| Average BOE per Day | 0.044 |
| Average MCFE per Day | 0.304 |
| Federal Financial Assurance | i | |
|
|