|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 9/1/2025 Measured TD: 8575 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 9/1/2025 | | Wellbore Permit | | | Permit #: | 19720959 | Expiration Date: | 11/17/1973 | | Proposed Depth/Form: | 8550 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | STATE | Surface Owner: | STATE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 80, Drill Unit: N2SW |
| | |
| Wellbore Completed | | Completion Date: | 1/13/1973 | | Spud Date: | 12/20/1972 | Spud Date Is: | ACTUAL | | Measured TD: | 8575 ft. | Measured PB depth: | 8535 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | IES, FDC-GR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 259 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 0 ft., Bottom: 259 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 8575 ft., Weight: 15.5/17 , Citings Type: ACTUAL | | Cement: | Sacks: 350, Top: 7356 ft., Bottom: 8575 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 1581 ft., Depth: 2338 ft., Bottom: 2340 ft., Sacks: 400, Method: DV TOOL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | FOX HILLS | 1851 ft. | | N | N | | HYGIENE | 3030 ft. | | N | N | | NIOBRARA | 7741 ft. | | N | N | | FORT HAYS | 8014 ft. | | N | N | | D SAND | 8421 ft. | | N | N | | J SAND | 8492 ft. | | N | N |
Formation JSND Formation Classification: OW Status: PR - 9/1/2025 Interval Top: 8452 ft. Interval Bottom: 8468 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 1/13/1973 | Choke Size: | 1.000 in. | | Formation Name: | J SAND | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 1/13/1973 | | Treatment Summary: | NONE |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | | | Tubing Packer Depth: | 8407 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/13/1973 | Test Method: | FLOWING | | Hours Tested: | 12 | Gas Type: | | | Gas Disposal: | VENTED | |
| Test Type | Measure |
|---|
| BBLS_H2O | 15.5 | | BBLS_OIL | 768 | | CALC_BBLS_H2O | 31 | | CALC_BBLS_OIL | 1536 | | CALC_GOR | 840 | | CALC_MCF_GAS | 1290 | | MCF_GAS | 645 | | TUBING_PRESS | 150 |
| | Perforation Data: | | Interval Top: | 8452 ft. | # Of Holes: | 32 | | Interval Bottom: | 8468 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 337 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.158 |
| Average MCFE per Day | 0.916 |
| Federal Financial Assurance | i | |
|
|