Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-005-06547
Well Classification: OW Status: PR - 9/1/2021
Well Name/No:CHAMPLIN 126 AMOCO B #3
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:RENEGADE OIL & GAS COMPANY LLC - 74165
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/1/2021
FacilityID:204462LocationID:320685
County:ARAPAHOE #005Location:SWNE 5 5S62W 6
Field:DRAGOON - #18850Elevation:5565 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1980FNL  1980 FELLat/Long: 39.645866 / -104.348532Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.646050 / -104.348410Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 9/1/2021             Measured TD: 7571 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 9/1/2021
Wellbore Permit
Permit #:19720564 Expiration Date:7/17/1973
Proposed Depth/Form:7550 ft.
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: DSND , Formation: D SAND , Order: 0 , Unit Acreage: 80, Drill Unit: SWNE

Wellbore Completed
Completion Date:8/8/1972
Spud Date:7/18/1972Spud Date Is:ACTUAL
Measured TD:7571 ft.Measured PB depth:7524 ft.
True Vertical TD:True Vertical PB depth:
Log Types:IES, FDC DENSITY-GR-CALIPER, GR COLLAR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 216 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 7571 ft., Weight: 14,15.517, Citings Type: ACTUAL
Cement:Sacks: 500, Top: 0 ft., Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
MUDDY D7376 ft.

Formation DSND                     Formation Classification:  OW                     Status:  PR - 9/1/2021                  Interval Top: 7379 ft.    Interval Bottom: 7392 ft.

 Completed Information for Formation D SAND
1st Production Date:8/2/1972Choke Size:0.312 in.
Formation Name:D SANDCommingled:
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:8/8/1972
Treatment Summary:SEE SCAN DOCUMENT # 422831
Tubing Size:2.875 in.Tubing Setting Depth:7420 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/8/1972Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 10
BBLS_OIL 250
CALC_BBLS_H2O 10
CALC_BBLS_OIL 250
CALC_GOR 1740
CALC_MCF_GAS 435
CASING_PRESS 1200
MCF_GAS 435
TUBING_PRESS 290
Perforation Data:
Interval Top:7379 ft.# Of Holes:
Interval Bottom:7392 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)999
Total Gas Produced (MCF)3692
GOR3695
GOR DeterminationBOE
Average BOE per Day4.489
Average MCFE per Day26.007

 Federal Financial Assurance  i 

 Tribal Well  i No