|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 10/1/2024 Measured TD: 8815 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 10/1/2024 | | Wellbore Permit | | | Permit #: | 19801860 | Expiration Date: | 10/21/1984 | | Proposed Depth/Form: | 8900 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | STATE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 317 C,K , Unit Acreage: 80, Drill Unit: S2SW |
| | |
| Wellbore Completed | | Completion Date: | 3/2/1985 | | Spud Date: | 1/8/1981 | Spud Date Is: | ACTUAL | | Measured TD: | 8815 ft. | Measured PB depth: | 8775 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 240 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 225, Top: 0 ft., Bottom: 240 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8815 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 550, Top: 5923 ft., Bottom: 8815 ft., Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4193 ft. | | N | N | | NIOBRARA | 7912 ft. | | N | N | | FORT HAYS | 8238 ft. | | N | N | | CARLILE | 8268 ft. | | N | N | | GRANEROS | 8533 ft. | | N | N | | D SAND | 8623 ft. | | N | N | | J SAND | 8670 ft. | | N | N | | SKULL CREEK | 8742 ft. | | N | N |
Formation JSND Formation Classification: OW Status: PR - 11/1/2024 Interval Top: 8729 ft. Interval Bottom: 8740 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 8/20/1984 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | PUMPING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 3/2/1985 | | Treatment Summary: | SEE SCANNED DOCUMENT # 00423831 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8740 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/8/1984 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | VENTED | |
| Test Type | Measure |
|---|
| BBLS_OIL | 65 | | CALC_GOR | 585 | | CASING_PRESS | 30 | | GRAVITY_OIL | 41 | | MCF_GAS | 38 |
| | Perforation Data: | | Interval Top: | 8729 ft. | # Of Holes: | 23 | | Interval Bottom: | 8740 ft. | Hole Size: | 0.5 in. |
|
Formation DSND Formation Classification: OW Status: PR - 4/1/2025 Interval Top: 8645 ft. Interval Bottom: 8654 ft.| Completed Information for Formation D SAND | | 1st Production Date: | 2/27/1985 | Choke Size: | | | Formation Name: | D SAND | Commingled: | Yes | | Production Method: | CASING SWAB | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 3/2/1985 | | Treatment Summary: | SEE SCANNED DOCUMENT # 00423826 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8740 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/28/1985 | Test Method: | CASING SWAB | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 95 | | BBLS_OIL | 10 | | GRAVITY_OIL | 41 |
| | Perforation Data: | | Interval Top: | 8645 ft. | # Of Holes: | 19 | | Interval Bottom: | 8654 ft. | Hole Size: | |
|
Formation DJSND Formation Classification: OW Status: CM - 5/22/1985| Completed Information for Formation D & J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | D & J SAND | Commingled: | | | Production Method: | ROD PUMP | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation DJSND. |
| | No Perforation Data was found for formation DJSND. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 01/2025 - 12/2025 |
| Total Oil Produced (Barrels) | 73 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | BOE |
| Average BOE per Day | 0.198 |
| Average MCFE per Day | 1.152 |
| Federal Financial Assurance | i | |
|
|