|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 9/1/2025 Measured TD: 7810 ft. Vertical TD: 0 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 9/1/2025 | | Wellbore Permit | | | Permit #: | 19801439 | Expiration Date: | 10/10/1981 | | Proposed Depth/Form: | 7800 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 80, Drill Unit: W2SE |
| | |
| Wellbore Completed | | Completion Date: | 12/12/1980 | | Spud Date: | 10/13/1980 | Spud Date Is: | ACTUAL | | Measured TD: | 7810 ft. | Measured PB depth: | 7761 ft. | | True Vertical TD: | 0 ft. | True Vertical PB depth: | | | Log Types: | SP-IES, FDC-GR CALIPER LOG | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 216 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 0 ft., Bottom: , Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 7810 ft., Weight: 15.5,14.5, Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 0 ft., Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | FOX HILLS | 1243 ft. | | | | | SUSSEX | 4650 ft. | | | | | SHANNON | 5315 ft. | | | | | NIOBRARA | 6826 ft. | | | | | FORT HAYS | 7217 ft. | | | | | CODELL | 7247 ft. | | | | | D SAND | 7624 ft. | | | | | J SAND | 7670 ft. | | | |
Formation JSND Formation Classification: GW Status: PR - 9/1/2025 Interval Top: 7674 ft. Interval Bottom: 7722 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 11/24/1980 | Choke Size: | 0.313 in. | | Formation Name: | J SAND | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 12/12/1980 | | Treatment Summary: | SEE SCANNED DOCUMENT #00378270 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7662 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/12/1980 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 34 | | BBLS_OIL | 33 | | CALC_BBLS_H2O | 34 | | CALC_BBLS_OIL | 33 | | CALC_GOR | 22000 | | CALC_MCF_GAS | 710 | | GRAVITY_OIL | 36 | | MCF_GAS | 710 |
| | Perforation Data: | | Interval Top: | 7674 ft. | # Of Holes: | 128 | | Interval Bottom: | 7722 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 15 |
| Total Gas Produced (MCF) | 9 |
| GOR | 600 |
| GOR Determination | BOE |
| Average BOE per Day | 0.041 |
| Average MCFE per Day | 0.267 |
| Federal Financial Assurance | i | |
|
|