Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10544
Well Classification: OW Status: PR - 9/27/2024
Well Name/No:Warbler #13W-27-08
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/27/2024
FacilityID:483425LocationID:483031
County:ADAMS #001Location:NWSE 13 1S66W 6
Field:WATTENBERG - #90750Elevation:5081 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1321FSL  1435 FELLat/Long: 39.961523 / -104.719690Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.961526 / -104.719690Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/2/2024
End Date: 5/12/2024
Reported: 5/23/2024
Days to report: 11
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 9/27/2024             Measured TD: 22053 ft.    Vertical TD: 7706 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 9/27/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:12/11/2025
Proposed Top PZ Location:Sec:13 Twp: 1S 66W Footage: 2354 FNL  860 FWL
Bottom Hole Location:Sec:16 Twp: 1S 66W Footage: 2367 FNL  2181 FEL
Proposed Depth/Form:22094 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-3386 , Unit Acreage: 2640, Drill Unit: T1S R66W SEC 13: W2W
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 669, Top: 0 ft., Bottom: 2500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 22094 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2855, Top: , Bottom: 22094 ft.

Wellbore Completed
Completion Date:9/4/2023
Spud Date:6/26/2023Spud Date Is:ACTUAL
Measured TD:22053 ft.Measured PB depth:22046 ft.
True Vertical TD:7706 ft.True Vertical PB depth:7706 ft.
Top PZ Location:Sec:13 Twp: 1S 66WFootage: 2504 FNL  880 FWL
Bottom Hole Location:Sec:16 Twp: 1S 66WFootage: 2504 FNL  2181 FEL
Log Types:CBL, MWD, (RES in API 001-10533 & 001-10529)
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 114 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 114 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2750 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 1171, Top: 0 ft., Bottom: 2750 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 22046 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 3455, Top: 550 ft., Bottom: 22046 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4775 ft.NN
SUSSEX5248 ft.NN
SHANNON5944 ft.NN
SHARON SPRINGS7701 ft.NN
NIOBRARA7714 ft.NN
FORT HAYS8499 ft.NN
CODELL8702 ft.NN

Formation CARL                     Formation Classification:  OW                     Status:  CM - 3/4/2025                  Interval Top: 13110 ft.    Interval Bottom: 21814 ft.

 Completed Information for Formation CARLILE
1st Production Date:9/13/2024Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:5/2/2024Treatment End Date:5/12/2024
Treatment Summary:13110 - 13374, 13880 - 14007, 15195 - 15318, 18626 - 18972, 19000 - 19174, 21604 - 21814
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:13110 ft.# Of Holes:488
Interval Bottom:21814 ft.Hole Size:0.36 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 3/4/2025                  Interval Top: 8713 ft.    Interval Bottom: 21982 ft.

 Completed Information for Formation CODELL
1st Production Date:9/13/2024Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:5/2/2024Treatment End Date:5/12/2024
Treatment Summary:8713 - 11129, 11644 - 13097, 13388 - 13879, 14020 - 15181, 15332 - 18091, 18223 - 18613, 18985 - 18986, 19186 - 21591, 21828 - 21982
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8713 ft.# Of Holes:3676
Interval Bottom:21982 ft.Hole Size:0.36 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 3/4/2025                  Interval Top: 8509 ft.    Interval Bottom: 18213 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:9/13/2024Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:5/2/2024Treatment End Date:5/12/2024
Treatment Summary:8509 - 8697, 11143 - 11538, 11553 - 11630, 18109 - 18213
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8509 ft.# Of Holes:341
Interval Bottom:18213 ft.Hole Size:0.36 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 3/4/2025                  Interval Top: 8472 ft.    Interval Bottom: 8494 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/13/2024Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:8472 ft.# Of Holes:18
Interval Bottom:8494 ft.Hole Size:0.36 in.

Formation NFCC                     Formation Classification:  OW                     Status:  PR - 9/27/2024                 Interval Top: 8472 ft.    Interval Bottom: 21982 ft.

 Completed Information for Formation NIOBRARA-FORT HAYS-CODELL-CARLILE
1st Production Date:9/13/2024Choke Size: 
Formation Name:NIOBRARA-FORT HAYS-CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:5/2/2024Treatment End Date:5/12/2024
Treatment Summary:Frac'd Niobrara-Fort Hays-Codell-Carlile with 78 stage plug and perf: 13471615 total pounds proppant pumped: 8557905 pounds 40/70 mesh; 4913710 pounds 100 mesh; 402307 total bbls fluid pumped: 366951 bbls gelled fluid; 35273 bbls fresh water and 83 bbls 15% HCl Acid.
Total fluid used in treatment (bbls):402307Max pressure during treatment (psi):9071
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:78
Total acid used in treatment (bbls):83Min frac gradient (psi/ft):0.87
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):35273Disposition method For flowback:DISPOSAL
Total proppant used (lbs):13471615Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8170 ft.
Tubing Packer Depth:8168 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/27/2024Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 519
BBLS_OIL 672
BTU_GAS 1400
CALC_BBLS_H2O 519
CALC_BBLS_OIL 672
CALC_GOR 1015
CALC_MCF_GAS 682
CASING_PRESS 750
GRAVITY_OIL 42
MCF_GAS 682
TUBING_PRESS 1857
Perforation Data:
Interval Top:8472 ft.# Of Holes:4523
Interval Bottom:21982 ft.Hole Size:0.36 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)142840
Total Gas Produced (MCF)271686
GOR1902
GOR DeterminationBOE
Average BOE per Day518.776
Average MCFE per Day3008.875

 Federal Financial Assurance  i 

 Tribal Well  i No