Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10542
Well Classification: OW Status: PR - 9/27/2024
Well Name/No:Warbler #24W-27-11
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/27/2024
FacilityID:483423LocationID:483031
County:ADAMS #001Location:SWSE 13 1S66W 6
Field:WATTENBERG - #90750Elevation:5084 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1237FSL  1436 FELLat/Long: 39.961293 / -104.719693Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.961293 / -104.719693Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/19/2024
End Date: 5/2/2024
Reported: 5/16/2024
Days to report: 14
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 9/27/2024             Measured TD: 22244 ft.    Vertical TD: 7730 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 9/27/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:12/11/2025
Proposed Top PZ Location:Sec:24 Twp: 1S 66W Footage: 914 FNL  860 FWL
Bottom Hole Location:Sec:21 Twp: 1S 66W Footage: 913 FNL  2182 FEL
Proposed Depth/Form:22242 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-3386 , Unit Acreage: 2640, Drill Unit: T1S R66W SEC 13: W2W
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 669, Top: 0 ft., Bottom: 2500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 22242 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2877, Top: , Bottom: 22242 ft.

Wellbore Completed
Completion Date:8/23/2023
Spud Date:6/29/2023Spud Date Is:ACTUAL
Measured TD:22244 ft.Measured PB depth:22222 ft.
True Vertical TD:7730 ft.True Vertical PB depth:7730 ft.
Top PZ Location:Sec:24 Twp: 1S 66WFootage: 904 FNL  80 FWL
Bottom Hole Location:Sec:21 Twp: 1S 66WFootage: 950 FNL  2181 FEL
Log Types:CBL, MWD, (RES 001-10533 & 001-10529)
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 92 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 92 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2747 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 1245, Top: 0 ft., Bottom: 2747 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 22222 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2905, Top: 1465 ft., Bottom: 22222 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4854 ft.NN
SUSSEX5327 ft.NN
SHANNON6030 ft.NN
SHARON SPRINGS7872 ft.NN
NIOBRARA7890 ft.NN
FORT HAYS8665 ft.NN
CODELL8945 ft.NN
CARLILE13161 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 3/4/2025                  Interval Top: 13162 ft.    Interval Bottom: 17111 ft.

 Completed Information for Formation CARLILE
1st Production Date:9/14/2024Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:4/19/2024Treatment End Date:5/2/2024
Treatment Summary:13162 - 13178, 13577 - 13677, 15869 - 15943, 17020 - 17111
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:13162 ft.# Of Holes:119
Interval Bottom:17111 ft.Hole Size:0.36 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 3/4/2025                  Interval Top: 8955 ft.    Interval Bottom: 22162 ft.

 Completed Information for Formation CODELL
1st Production Date:9/14/2024Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:4/19/2024Treatment End Date:5/2/2024
Treatment Summary:8955 - 13148, 13192 - 13565, 13690 - 15855, 15957 - 17006, 17125 - 18042, 19723 - 22162
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8955 ft.# Of Holes:3491
Interval Bottom:22162 ft.Hole Size:0.36 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 3/4/2025                  Interval Top: 8665 ft.    Interval Bottom: 19710 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:9/14/2024Choke Size: 
Formation Name:FORT HAYSCommingled:
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:4/19/2024Treatment End Date:5/2/2024
Treatment Summary:8665 - 8937, 18060 - 18219, 18561 - 18718, 19404 - 19710
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8665 ft.# Of Holes:374
Interval Bottom:19710 ft.Hole Size:0.36 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 3/4/2025                  Interval Top: 8659 ft.    Interval Bottom: 19386 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/14/2024Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:4/19/2024Treatment End Date:5/2/2024
Treatment Summary:8659 - 8664, 18220 - 18543, 18731 - 19386
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:8659 ft.# Of Holes:348
Interval Bottom:19386 ft.Hole Size:0.36 in.

Formation NFCC                     Formation Classification:  OW                     Status:  PR - 9/27/2024                 Interval Top: 8659 ft.    Interval Bottom: 22162 ft.

 Completed Information for Formation NIOBRARA-FORT HAYS-CODELL-CARLILE
1st Production Date:9/14/2024Choke Size: 
Formation Name:NIOBRARA-FORT HAYS-CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:4/19/2024Treatment End Date:5/2/2024
Treatment Summary:Frac'd Niobrara-Fort Hays-Codell-Carlile with 76 stage plug and perf: 13425718 total pounds proppant pumped: 6920398 pounds 40/70 mesh; 6505320 pounds 100 mesh; 396321 total bbls fluid pumped: 359449 bbls gelled fluid; 36756 bbls fresh water and 116 bbls 15% HCl Acid.
Total fluid used in treatment (bbls):396321Max pressure during treatment (psi):9363
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:76
Total acid used in treatment (bbls):116Min frac gradient (psi/ft):0.87
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):36756Disposition method For flowback:DISPOSAL
Total proppant used (lbs):13425718Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8302 ft.
Tubing Packer Depth:8301 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/27/2024Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 727
BBLS_OIL 481
BTU_GAS 1400
CALC_BBLS_H2O 727
CALC_BBLS_OIL 481
CALC_GOR 1015
CALC_MCF_GAS 488
CASING_PRESS 715
GRAVITY_OIL 42
MCF_GAS 488
TUBING_PRESS 1625
Perforation Data:
Interval Top:8659 ft.# Of Holes:4332
Interval Bottom:22162 ft.Hole Size:0.36 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)147469
Total Gas Produced (MCF)245716
GOR1666
GOR DeterminationBOE
Average BOE per Day520.898
Average MCFE per Day3021.204

 Federal Financial Assurance  i 

 Tribal Well  i No