Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10539
Well Classification: OW Status: PR - 9/27/2024
Well Name/No:Warbler #13W-27-10
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/27/2024
FacilityID:483420LocationID:483031
County:ADAMS #001Location:SWSE 13 1S66W 6
Field:WATTENBERG - #90750Elevation:5083 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1265FSL  1436 FELLat/Long: 39.961369 / -104.719692Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.961369 / -104.719692Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/19/2024
End Date: 5/2/2024
Reported: 5/16/2024
Days to report: 14
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 9/27/2024             Measured TD: 22017 ft.    Vertical TD: 7735 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 9/27/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:12/11/2025
Proposed Top PZ Location:Sec:13 Twp: 1S 66W Footage: 358 FSL  860 FWL
Bottom Hole Location:Sec:16 Twp: 1S 66W Footage: 360 FSL  2180 FEL
Proposed Depth/Form:21991 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-3386 , Unit Acreage: 2640, Drill Unit: T1S R66W SEC 13: W2W
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 669, Top: 0 ft., Bottom: 2500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 21991 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2840, Top: , Bottom: 21991 ft.

Wellbore Completed
Completion Date:8/28/2023
Spud Date:6/28/2023Spud Date Is:ACTUAL
Measured TD:22017 ft.Measured PB depth:22015 ft.
True Vertical TD:7735 ft.True Vertical PB depth:7735 ft.
Top PZ Location:Sec:13 Twp: 1S 66WFootage: 277 FSL  880 FWL
Bottom Hole Location:Sec:16 Twp: 1S 66WFootage: 228 FSL  2178 FEL
Log Types:CBL, MWD, (RES in API 001-10533 & 001-10529)
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 114 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 114 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2707 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 1236, Top: 0 ft., Bottom: 2707 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 22015 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 3450, Top: 1265 ft., Bottom: 22015 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4822 ft.NN
SUSSEX5275 ft.NN
SHANNON5912 ft.NN
SHARON SPRINGS7652 ft.NN
NIOBRARA7672 ft.NN
FORT HAYS8297 ft.NN
CODELL8385 ft.NN

Formation CARL                     Formation Classification:  OW                     Status:  CM - 3/4/2025                  Interval Top: 13479 ft.    Interval Bottom: 20423 ft.

 Completed Information for Formation CARLILE
1st Production Date:9/14/2024Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:4/19/2024Treatment End Date:5/2/2024
Treatment Summary:13479 - 13495, 19139 - 19807, 20244 - 20423
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:13479 ft.# Of Holes:263
Interval Bottom:20423 ft.Hole Size:0.36 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 3/4/2025                  Interval Top: 12624 ft.    Interval Bottom: 12667 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/14/2024Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:12624 ft.# Of Holes:24
Interval Bottom:12667 ft.Hole Size:0.36 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 3/4/2025                  Interval Top: 9368 ft.    Interval Bottom: 21586 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:9/14/2024Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:4/19/2024Treatment End Date:5/2/2024
Treatment Summary:9368 - 9425, 12680 - 12864, 19028 - 19125, 21540 - 21586
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:9368 ft.# Of Holes:233
Interval Bottom:21586 ft.Hole Size:0.36 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 3/4/2025                  Interval Top: 8437 ft.    Interval Bottom: 21949 ft.

 Completed Information for Formation CODELL
1st Production Date:9/14/2024Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:4/19/2024Treatment End Date:5/2/2024
Treatment Summary:8437 - 9351, 9438 - 12606, 12882 - 13466, 13507 - 19010, 19808 - 20231, 20437 - 21539, 21597 - 21949
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8437 ft.# Of Holes:3861
Interval Bottom:21949 ft.Hole Size:0.36 in.

Formation NFCC                     Formation Classification:  OW                     Status:  PR - 9/27/2024                 Interval Top: 8437 ft.    Interval Bottom: 21949 ft.

 Completed Information for Formation NIOBRARA-FORT HAYS-CODELL-CARLILE
1st Production Date:9/14/2024Choke Size: 
Formation Name:NIOBRARA-FORT HAYS-CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:4/19/2024Treatment End Date:5/2/2024
Treatment Summary:Frac'd Niobrara-Fort Hays-Codell-Carlile with 76 stage plug and perf: 13443183 total pounds proppant pumped: 8254333 pounds 40/70 mesh; 5188850 pounds 100 mesh; 393663 total bbls fluid pumped: 357713 bbls gelled fluid; 35890 bbls fresh water and 60 bbls 15% HCl Acid.
Total fluid used in treatment (bbls):393663Max pressure during treatment (psi):9092
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:76
Total acid used in treatment (bbls):60Min frac gradient (psi/ft):0.84
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):35890Disposition method For flowback:DISPOSAL
Total proppant used (lbs):13443183Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8183 ft.
Tubing Packer Depth:8182 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/27/2024Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 692
BBLS_OIL 474
BTU_GAS 1400
CALC_BBLS_H2O 692
CALC_BBLS_OIL 474
CALC_GOR 1027
CALC_MCF_GAS 487
CASING_PRESS 601
GRAVITY_OIL 42
MCF_GAS 487
TUBING_PRESS 1713
Perforation Data:
Interval Top:8437 ft.# Of Holes:4381
Interval Bottom:21949 ft.Hole Size:0.36 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)238937
Total Gas Produced (MCF)317331
GOR1328
GOR DeterminationBOE
Average BOE per Day803.239
Average MCFE per Day4658.805

 Federal Financial Assurance  i 

 Tribal Well  i No