Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10533
Well Classification: OW Status: PR - 9/27/2024
Well Name/No:Warbler #13W-27-07
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/27/2024
FacilityID:483414LocationID:483031
County:ADAMS #001Location:NWSE 13 1S66W 6
Field:WATTENBERG - #90750Elevation:5081 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1349FSL  1435 FELLat/Long: 39.961600 / -104.719689Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.961605 / -104.719689Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/2/2024
End Date: 5/12/2024
Reported: 5/23/2024
Days to report: 11
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 9/1/2024             Measured TD: 22365 ft.    Vertical TD: 7720 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 9/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:12/11/2025
Proposed Top PZ Location:Sec:13 Twp: 1S 66W Footage: 1086 FNL  860 FWL
Bottom Hole Location:Sec:16 Twp: 1S 66W Footage: 1091 FNL  2185 FEL
Proposed Depth/Form:22441 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-3386 , Unit Acreage: 2640, Drill Unit: T1S R66W SEC 13: W2W
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 669, Top: 0 ft., Bottom: 2500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 22441 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2906, Top: , Bottom: 22441 ft.

Wellbore Completed
Completion Date:9/14/2023
Spud Date:6/24/2023Spud Date Is:ACTUAL
Measured TD:22365 ft.Measured PB depth:22347 ft.
True Vertical TD:7720 ft.True Vertical PB depth:7720 ft.
Top PZ Location:Sec:13 Twp: 1S 66WFootage: 1262 FNL  880 FWL
Bottom Hole Location:Sec:16 Twp: 1S 66WFootage: 1312 FNL  2185 FEL
Log Types:CBL, MWD, RES
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 114 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 114 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2830 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 1171, Top: 0 ft., Bottom: 2830 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 22347 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 3500, Top: 1350 ft., Bottom: 22347 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4929 ft.NN
SUSSEX5358 ft.NN
SHANNON5993 ft.NN
SHARON SPRINGS7954 ft.NN
NIOBRARA7964 ft.NN
FORT HAYS8779 ft.NN
CODELL9079 ft.NN

Formation CARL                     Formation Classification:  OW                     Status:  CM - 3/4/2025                  Interval Top: 10397 ft.    Interval Bottom: 20911 ft.

 Completed Information for Formation CARLILE
1st Production Date:9/13/2024Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:5/2/2024Treatment End Date:5/12/2024
Treatment Summary:10397 - 10601, 11217 - 11729, 13535 - 13647, 18044 - 18127, 18612 - 18839, 20384 - 20911
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:10397 ft.# Of Holes:627
Interval Bottom:20911 ft.Hole Size:0.36 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 3/4/2025                  Interval Top: 9091 ft.    Interval Bottom: 22290 ft.

 Completed Information for Formation CODELL
1st Production Date:9/13/2024Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:5/2/2024Treatment End Date:5/12/2024
Treatment Summary:9091 - 9439, 9784 - 10384, 10686 - 10687, 11027 - 11203, 11743 - 13517, 13661 - 17530, 17661 - 18031, 18145 - 18599, 18853 - 20372, 20925 - 21814, 21889 - 22290
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:9091 ft.# Of Holes:3345
Interval Bottom:22290 ft.Hole Size:0.36 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 9/27/2024                 Interval Top: 8785 ft.    Interval Bottom: 22290 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:9/13/2024Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:5/2/2024Treatment End Date:5/12/2024
Treatment Summary:Frac'd Carlile-Codell-Fort Hays with 77 stage plug and perf: 13542395 total pounds proppant pumped: 8210405 pounds 40/70 mesh; 5331990 pounds 100 mesh; 395020 total bbls fluid pumped: 358083 bbls gelled fluid; 36830 bbls fresh water and 107 bbls 15% HCl Acid.
Total fluid used in treatment (bbls):395020Max pressure during treatment (psi):9236
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:77
Total acid used in treatment (bbls):107Min frac gradient (psi/ft):0.89
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):36830Disposition method For flowback:DISPOSAL
Total proppant used (lbs):13542395Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8410 ft.
Tubing Packer Depth:8409 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/27/2024Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 492
BBLS_OIL 620
BTU_GAS 1400
CALC_BBLS_H2O 492
CALC_BBLS_OIL 620
CALC_GOR 1003
CALC_MCF_GAS 622
CASING_PRESS 622
GRAVITY_OIL 42
MCF_GAS 622
TUBING_PRESS 1860
Perforation Data:
Interval Top:8785 ft.# Of Holes:4397
Interval Bottom:22290 ft.Hole Size:0.36 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 3/4/2025                  Interval Top: 8785 ft.    Interval Bottom: 21871 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:9/13/2024Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:5/2/2024Treatment End Date:5/12/2024
Treatment Summary:8785 - 9073, 9452 - 9765, 10611, 10673, 10700 - 11009, 17544 - 17660, 21828 - 21871
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8785 ft.# Of Holes:425
Interval Bottom:21871 ft.Hole Size:0.36 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)319076
Total Gas Produced (MCF)497912
GOR1560
GOR DeterminationBOE
Average BOE per Day1111.044
Average MCFE per Day6444.050

 Federal Financial Assurance  i 

 Tribal Well  i No