Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10533
Well Classification: OW Status: PR - 9/27/2024
Well Name/No:Warbler #13W-27-07
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/27/2024
FacilityID:483414LocationID:483031
County:ADAMS #001Location:NWSE 13 1S66W 6
Field:WATTENBERG - #90750Elevation:5081 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1349FSL  1435 FELLat/Long: 39.961600 / -104.719689Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.961605 / -104.719689Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/2/2024
End Date: 5/12/2024
Reported: 5/23/2024
Days to report: 11
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 9/1/2024             Measured TD: 22365 ft.    Vertical TD: 7720 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 9/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:12/11/2025
Proposed Top PZ Location:Sec:13 Twp: 1S 66W Footage: 1086 FNL  860 FWL
Bottom Hole Location:Sec:16 Twp: 1S 66W Footage: 1091 FNL  2185 FEL
Proposed Depth/Form:22441 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-3386 , Unit Acreage: 2640, Drill Unit: T1S R66W SEC 13: W2W
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 669, Top: 0 ft., Bottom: 2500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 22441 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2906, Top: , Bottom: 22441 ft.

Wellbore Completed
Completion Date:9/14/2023
Spud Date:6/24/2023Spud Date Is:ACTUAL
Measured TD:22365 ft.Measured PB depth:22347 ft.
True Vertical TD:7720 ft.True Vertical PB depth:7720 ft.
Top PZ Location:Sec:13 Twp: 1S 66WFootage: 1262 FNL  880 FWL
Bottom Hole Location:Sec:16 Twp: 1S 66WFootage: 1312 FNL  2185 FEL
Log Types:CBL, MWD, RES
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 114 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 114 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2830 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 1171, Top: 0 ft., Bottom: 2830 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 22347 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 3500, Top: 1350 ft., Bottom: 22347 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4929 ft.NN
SUSSEX5358 ft.NN
SHANNON5993 ft.NN
SHARON SPRINGS7954 ft.NN
NIOBRARA7964 ft.NN
FORT HAYS8779 ft.NN
CODELL9079 ft.NN

Formation CARL                     Formation Classification:  OW                     Status:  CM - 3/4/2025                  Interval Top: 10397 ft.    Interval Bottom: 20911 ft.

 Completed Information for Formation CARLILE
1st Production Date:9/13/2024Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:5/2/2024Treatment End Date:5/12/2024
Treatment Summary:10397 - 10601, 11217 - 11729, 13535 - 13647, 18044 - 18127, 18612 - 18839, 20384 - 20911
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:10397 ft.# Of Holes:627
Interval Bottom:20911 ft.Hole Size:0.36 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 3/4/2025                  Interval Top: 9091 ft.    Interval Bottom: 22290 ft.

 Completed Information for Formation CODELL
1st Production Date:9/13/2024Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:5/2/2024Treatment End Date:5/12/2024
Treatment Summary:9091 - 9439, 9784 - 10384, 10686 - 10687, 11027 - 11203, 11743 - 13517, 13661 - 17530, 17661 - 18031, 18145 - 18599, 18853 - 20372, 20925 - 21814, 21889 - 22290
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:9091 ft.# Of Holes:3345
Interval Bottom:22290 ft.Hole Size:0.36 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 9/27/2024                 Interval Top: 8785 ft.    Interval Bottom: 22290 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:9/13/2024Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:5/2/2024Treatment End Date:5/12/2024
Treatment Summary:Frac'd Carlile-Codell-Fort Hays with 77 stage plug and perf: 13542395 total pounds proppant pumped: 8210405 pounds 40/70 mesh; 5331990 pounds 100 mesh; 395020 total bbls fluid pumped: 358083 bbls gelled fluid; 36830 bbls fresh water and 107 bbls 15% HCl Acid.
Total fluid used in treatment (bbls):395020Max pressure during treatment (psi):9236
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:77
Total acid used in treatment (bbls):107Min frac gradient (psi/ft):0.89
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):36830Disposition method For flowback:DISPOSAL
Total proppant used (lbs):13542395Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8410 ft.
Tubing Packer Depth:8409 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/27/2024Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 492
BBLS_OIL 620
BTU_GAS 1400
CALC_BBLS_H2O 492
CALC_BBLS_OIL 620
CALC_GOR 1003
CALC_MCF_GAS 622
CASING_PRESS 622
GRAVITY_OIL 42
MCF_GAS 622
TUBING_PRESS 1860
Perforation Data:
Interval Top:8785 ft.# Of Holes:4397
Interval Bottom:22290 ft.Hole Size:0.36 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 3/4/2025                  Interval Top: 8785 ft.    Interval Bottom: 21871 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:9/13/2024Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:5/2/2024Treatment End Date:5/12/2024
Treatment Summary:8785 - 9073, 9452 - 9765, 10611, 10673, 10700 - 11009, 17544 - 17660, 21828 - 21871
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8785 ft.# Of Holes:425
Interval Bottom:21871 ft.Hole Size:0.36 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)184852
Total Gas Produced (MCF)374427
GOR2025
GOR DeterminationBOE
Average BOE per Day688.305
Average MCFE per Day3992.174

 Federal Financial Assurance  i 

 Tribal Well  i No