Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10529
Well Classification: OW Status: PR - 9/27/2024
Well Name/No:Warbler #24W-27-12
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/27/2024
FacilityID:483410LocationID:483031
County:ADAMS #001Location:SWSE 13 1S66W 6
Field:WATTENBERG - #90750Elevation:5084 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1209FSL  1436 FELLat/Long: 39.961216 / -104.719694Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.961215 / -104.719694Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/19/2024
End Date: 5/1/2024
Reported: 5/16/2024
Days to report: 15
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 9/1/2024             Measured TD: 22667 ft.    Vertical TD: 7776 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 9/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:12/11/2025
Proposed Top PZ Location:Sec:24 Twp: 1S 66W Footage: 2150 FNL  860 FWL
Bottom Hole Location:Sec:21 Twp: 1S 66W Footage: 2147 FNL  2184 FEL
Proposed Depth/Form:22665 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-3386 , Unit Acreage: 2640, Drill Unit: T1S R66W SEC 13: W2W
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 669, Top: 0 ft., Bottom: 2500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 22665 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2938, Top: , Bottom: 22665 ft.

Wellbore Completed
Completion Date:8/16/2023
Spud Date:6/30/2023Spud Date Is:ACTUAL
Measured TD:22667 ft.Measured PB depth:22663 ft.
True Vertical TD:7776 ft.True Vertical PB depth:7776 ft.
Top PZ Location:Sec:24 Twp: 1S 66WFootage: 2086 FNL  880 FWL
Bottom Hole Location:Sec:21 Twp: 1S 66WFootage: 2113 FNL  2183 FEL
Log Types:CBL, MWD, RES
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 92 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 92 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2834 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 1236, Top: 0 ft., Bottom: 2834 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 22663 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 3540, Top: 1685 ft., Bottom: 22663 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN5170 ft.NN
SUSSEX5682 ft.NN
SHANNON6438 ft.NN
SHARON SPRINGS8325 ft.NN
NIOBRARA8347 ft.NN
FORT HAYS8884 ft.NN
CODELL8988 ft.NN
CARLILE12067 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 3/13/2025                 Interval Top: 12067 ft.    Interval Bottom: 17024 ft.

 Completed Information for Formation CARLILE
1st Production Date:9/14/2024Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:4/19/2024Treatment End Date:5/1/2024
Treatment Summary:12067 - 12177, 12422 - 12465, 15879 - 16135, 16707 - 17024
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:12067 ft.# Of Holes:317
Interval Bottom:17024 ft.Hole Size:0.36 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 3/13/2025                 Interval Top: 9231 ft.    Interval Bottom: 15624 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:9/14/2024Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:4/19/2024Treatment End Date:5/1/2024
Treatment Summary:9231 - 9337, 11259 - 11290, 15548 - 15624
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:9231 ft.# Of Holes:10
Interval Bottom:15624 ft.Hole Size:0.36 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 9/27/2024                 Interval Top: 9084 ft.    Interval Bottom: 22601 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:9/14/2024Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:4/19/2024Treatment End Date:5/1/2024
Treatment Summary:Frac'd Carlile-Codell-Fort Hays with 74 stage plug and perf: 13134755 total pounds proppant pumped: 7831885 pounds 40/70 mesh; 5302870 pounds 100 mesh; 408073 total bbls fluid pumped: 369469 bbls gelled fluid; 38565 bbls fresh water and 39 bbls 15% HCl Acid.
Total fluid used in treatment (bbls):408073Max pressure during treatment (psi):9367
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:74
Total acid used in treatment (bbls):39Min frac gradient (psi/ft):0.84
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):38565Disposition method For flowback:DISPOSAL
Total proppant used (lbs):13134755Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8708 ft.
Tubing Packer Depth:8706 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/27/2024Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 542
BBLS_OIL 618
BTU_GAS 1400
CALC_BBLS_H2O 542
CALC_BBLS_OIL 618
CALC_GOR 992
CALC_MCF_GAS 613
CASING_PRESS 617
GRAVITY_OIL 42
MCF_GAS 613
TUBING_PRESS 1588
Perforation Data:
Interval Top:9084 ft.# Of Holes:4240
Interval Bottom:22601 ft.Hole Size:0.36 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 3/13/2025                 Interval Top: 9084 ft.    Interval Bottom: 22601 ft.

 Completed Information for Formation CODELL
1st Production Date:9/14/2024Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:4/19/2024Treatment End Date:5/1/2024
Treatment Summary:9084 - 9217, 9348 - 11245, 11304 - 12066, 12195 - 12409, 12478 - 15530, 15638 - 15865, 16149 - 16695, 17038 - 22601
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:9084 ft.# Of Holes:3818
Interval Bottom:22601 ft.Hole Size:0.36 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)111959
Total Gas Produced (MCF)142574
GOR1273
GOR DeterminationBOE
Average BOE per Day371.090
Average MCFE per Day2152.299

 Federal Financial Assurance  i 

 Tribal Well  i No