Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10529
Well Classification: OW Status: PR - 9/27/2024
Well Name/No:Warbler #24W-27-12
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/27/2024
FacilityID:483410LocationID:483031
County:ADAMS #001Location:SWSE 13 1S66W 6
Field:WATTENBERG - #90750Elevation:5084 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1209FSL  1436 FELLat/Long: 39.961216 / -104.719694Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.961215 / -104.719694Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/19/2024
End Date: 5/1/2024
Reported: 5/16/2024
Days to report: 15
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 9/1/2024             Measured TD: 22667 ft.    Vertical TD: 7776 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 9/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:12/11/2025
Proposed Top PZ Location:Sec:24 Twp: 1S 66W Footage: 2150 FNL  860 FWL
Bottom Hole Location:Sec:21 Twp: 1S 66W Footage: 2147 FNL  2184 FEL
Proposed Depth/Form:22665 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-3386 , Unit Acreage: 2640, Drill Unit: T1S R66W SEC 13: W2W
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 669, Top: 0 ft., Bottom: 2500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 22665 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2938, Top: , Bottom: 22665 ft.

Wellbore Completed
Completion Date:8/16/2023
Spud Date:6/30/2023Spud Date Is:ACTUAL
Measured TD:22667 ft.Measured PB depth:22663 ft.
True Vertical TD:7776 ft.True Vertical PB depth:7776 ft.
Top PZ Location:Sec:24 Twp: 1S 66WFootage: 2086 FNL  880 FWL
Bottom Hole Location:Sec:21 Twp: 1S 66WFootage: 2113 FNL  2183 FEL
Log Types:CBL, MWD, RES
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 92 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 92 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2834 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 1236, Top: 0 ft., Bottom: 2834 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 22663 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 3540, Top: 1685 ft., Bottom: 22663 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN5170 ft.NN
SUSSEX5682 ft.NN
SHANNON6438 ft.NN
SHARON SPRINGS8325 ft.NN
NIOBRARA8347 ft.NN
FORT HAYS8884 ft.NN
CODELL8988 ft.NN
CARLILE12067 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 3/13/2025                 Interval Top: 12067 ft.    Interval Bottom: 17024 ft.

 Completed Information for Formation CARLILE
1st Production Date:9/14/2024Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:4/19/2024Treatment End Date:5/1/2024
Treatment Summary:12067 - 12177, 12422 - 12465, 15879 - 16135, 16707 - 17024
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:12067 ft.# Of Holes:317
Interval Bottom:17024 ft.Hole Size:0.36 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 3/13/2025                 Interval Top: 9231 ft.    Interval Bottom: 15624 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:9/14/2024Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:4/19/2024Treatment End Date:5/1/2024
Treatment Summary:9231 - 9337, 11259 - 11290, 15548 - 15624
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:9231 ft.# Of Holes:10
Interval Bottom:15624 ft.Hole Size:0.36 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 9/27/2024                 Interval Top: 9084 ft.    Interval Bottom: 22601 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:9/14/2024Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:4/19/2024Treatment End Date:5/1/2024
Treatment Summary:Frac'd Carlile-Codell-Fort Hays with 74 stage plug and perf: 13134755 total pounds proppant pumped: 7831885 pounds 40/70 mesh; 5302870 pounds 100 mesh; 408073 total bbls fluid pumped: 369469 bbls gelled fluid; 38565 bbls fresh water and 39 bbls 15% HCl Acid.
Total fluid used in treatment (bbls):408073Max pressure during treatment (psi):9367
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:74
Total acid used in treatment (bbls):39Min frac gradient (psi/ft):0.84
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):38565Disposition method For flowback:DISPOSAL
Total proppant used (lbs):13134755Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8708 ft.
Tubing Packer Depth:8706 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/27/2024Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 542
BBLS_OIL 618
BTU_GAS 1400
CALC_BBLS_H2O 542
CALC_BBLS_OIL 618
CALC_GOR 992
CALC_MCF_GAS 613
CASING_PRESS 617
GRAVITY_OIL 42
MCF_GAS 613
TUBING_PRESS 1588
Perforation Data:
Interval Top:9084 ft.# Of Holes:4240
Interval Bottom:22601 ft.Hole Size:0.36 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 3/13/2025                 Interval Top: 9084 ft.    Interval Bottom: 22601 ft.

 Completed Information for Formation CODELL
1st Production Date:9/14/2024Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:4/19/2024Treatment End Date:5/1/2024
Treatment Summary:9084 - 9217, 9348 - 11245, 11304 - 12066, 12195 - 12409, 12478 - 15530, 15638 - 15865, 16149 - 16695, 17038 - 22601
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:9084 ft.# Of Holes:3818
Interval Bottom:22601 ft.Hole Size:0.36 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)224806
Total Gas Produced (MCF)251705
GOR1119
GOR DeterminationBOE
Average BOE per Day728.946
Average MCFE per Day4227.877

 Federal Financial Assurance  i 

 Tribal Well  i No