Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10520
Well Classification: OW Status: PR - 9/1/2023
Well Name/No:GUS LD #15-022HN
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/1/2023
FacilityID:476889LocationID:476754
County:ADAMS #001Location:SENE 21 1S67W 6
Field:WATTENBERG - #90750Elevation:5123 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1663FNL  456 FELLat/Long: 39.953062 / -104.885947Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.953061 / -104.885947Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/1/2022
End Date: 5/16/2022
Reported: 6/6/2022
Days to report: 21
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 9/1/2023             Measured TD: 16222 ft.    Vertical TD: 7765 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 9/1/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:6/10/2022
Proposed Top PZ Location:Sec:22 Twp: 1S 67W Footage: 2572 FNL  515 FWL
Bottom Hole Location:Sec:15 Twp: 1S 67W Footage: 370 FNL  465 FWL
Proposed Depth/Form:15986 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-2794 , Unit Acreage: 960, Drill Unit: SEC15:ALL SEC22:N2
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1700 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 655, Top: 0 ft., Bottom: 1700 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 15986 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1841, Top: 4506 ft., Bottom: 15986 ft.

Wellbore Completed
Completion Date:1/20/2022
Spud Date:10/30/2021Spud Date Is:ACTUAL
Measured TD:16222 ft.Measured PB depth:16217 ft.
True Vertical TD:7765 ft.True Vertical PB depth:7765 ft.
Top PZ Location:Sec:22 Twp: 1S 67WFootage: 2464 FNL  523 FWL
Bottom Hole Location:Sec:15 Twp: 1S 67WFootage: 295 FNL  468 FWL
Log Types:MWD/LWD, Mud, CBL (Composite in 001-10516)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2043 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 997, Top: 0 ft., Bottom: 2043 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16222 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 1735, Top: 2410 ft., Bottom: 16222 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4578 ft.4710 ft.NN
SUSSEX4970 ft.5158 ft.NN
SHANNON5753 ft.6109 ft.NN
SHARON SPRINGS7807 ft.NN
NIOBRARA7963 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 9/1/2023                  Interval Top: 8768 ft.    Interval Bottom: 16013 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:5/1/2022Treatment End Date:5/16/2022
Treatment Summary:28 Stage Plug and Perf Total Fluids: 204,742 bbls Slickwater Fluid: 202,929 bbls 15% HCl Acid: 1,813 bbls Total Proppant: 6,711,374 lbs Silica Proppant: 6,711,374 lbs
Total fluid used in treatment (bbls):204742Max pressure during treatment (psi):4725
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:28
Total acid used in treatment (bbls):1813Min frac gradient (psi/ft):0.93
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):202929Disposition method For flowback:
Total proppant used (lbs):6711374Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 245
BBLS_OIL 194
BTU_GAS 1409
CALC_BBLS_H2O 245
CALC_BBLS_OIL 194
CALC_GOR 1737
CALC_MCF_GAS 337
CASING_PRESS 950
GRAVITY_OIL 44
MCF_GAS 337
TUBING_PRESS 915
Perforation Data:
Interval Top:8768 ft.# Of Holes:1071
Interval Bottom:16013 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)7567
Total Gas Produced (MCF)106954
GOR14134
GOR DeterminationBOE
Average BOE per Day71.046
Average MCFE per Day412.028

 Federal Financial Assurance  i 

 Tribal Well  i No