Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10514
Well Classification: OW Status: PR - 4/10/2023
Well Name/No:GUS LD #15-029HN
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/10/2023
FacilityID:476883LocationID:476754
County:ADAMS #001Location:SENE 21 1S67W 6
Field:WATTENBERG - #90750Elevation:5129 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1738FNL  381 FELLat/Long: 39.952856 / -104.885680Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.952855 / -104.885681Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/14/2023
End Date: 1/19/2023
Reported: 1/30/2023
Days to report: 11
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 4/10/2023             Measured TD: 16431 ft.    Vertical TD: 7648 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 4/10/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:6/10/2022
Proposed Top PZ Location:Sec:22 Twp: 1S 67W Footage: 2565 FNL  2380 FWL
Bottom Hole Location:Sec:15 Twp: 1S 67W Footage: 370 FNL  2355 FWL
Proposed Depth/Form:16243 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-2794 , Unit Acreage: 960, Drill Unit: SEC15:ALL SEC22:N2
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1700 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 665, Top: 0 ft., Bottom: 1700 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16243 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1833, Top: 4814 ft., Bottom: 16243 ft.

Wellbore Completed
Completion Date:2/7/2022
Spud Date:11/16/2021Spud Date Is:ACTUAL
Measured TD:16431 ft.Measured PB depth:16425 ft.
True Vertical TD:7648 ft.True Vertical PB depth:7648 ft.
Top PZ Location:Sec:22 Twp: 1S 67WFootage: 2565 FNL  2370 FWL
Bottom Hole Location:Sec:15 Twp: 1S 67WFootage: 292 FNL  2350 FWL
Log Types:MWD/LWD, Mud, CBL (Composite in 001-10516)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2041 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 1046, Top: 0 ft., Bottom: 2041 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16431 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 1740, Top: 2746 ft., Bottom: 16431 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4919 ft.5136 ft.NN
SUSSEX5358 ft.5566 ft.NN
SHANNON6258 ft.6440 ft.NN
SHARON SPRINGS8214 ft.NN
NIOBRARA8369 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 4/10/2023                 Interval Top: 8928 ft.    Interval Bottom: 16253 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/30/2023Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:1/14/2023Treatment End Date:1/19/2023
Treatment Summary:40 Stage Plug and Perf Total Fluid: 129,318 bbls Gel Fluid: 54,383 bbls Slickwater Fluid: 74,379 bbls 15% HCl Acid: 556 bbls Total Proppant: 4,394,775 bbls Silica Proppant: 4,394,775 bbls Method for determining flowback: Measuring flowback tank volumes.
Total fluid used in treatment (bbls):129318Max pressure during treatment (psi):6095
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:40
Total acid used in treatment (bbls):556Min frac gradient (psi/ft):0.94
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):8168
Fresh water used in treatment (bbls):128762Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4394775Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8526 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/10/2023Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 233
BBLS_OIL 185
BTU_GAS 1409
CALC_BBLS_H2O 233
CALC_BBLS_OIL 185
CALC_GOR 697
CALC_MCF_GAS 129
CASING_PRESS 1890
GRAVITY_OIL 44
MCF_GAS 129
TUBING_PRESS 1478
Perforation Data:
Interval Top:8928 ft.# Of Holes:1400
Interval Bottom:16253 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)16850
Total Gas Produced (MCF)105924
GOR6286
GOR DeterminationBOE
Average BOE per Day96.159
Average MCFE per Day557.739

 Federal Financial Assurance  i 

 Tribal Well  i No