Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10513
Well Classification: OW Status: PR - 4/15/2023
Well Name/No:Gus LD #34-363 HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/15/2023
FacilityID:476882LocationID:476754
County:ADAMS #001Location:SENE 21 1S67W 6
Field:WATTENBERG - #90750Elevation:5124 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1634FNL  306 FELLat/Long: 39.953144 / -104.885411Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.953150 / -104.885420Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/21/2023
End Date: 2/11/2023
Reported: 2/23/2023
Days to report: 12
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 4/15/2023             Measured TD: 22697 ft.    Vertical TD: 7934 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 4/15/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:4/9/2025
Proposed Top PZ Location:Sec:22 Twp: 1S 67W Footage: 2535 FSL  660 FEL
Bottom Hole Location:Sec:34 Twp: 1S 67W Footage: 476 FSL  658 FEL
Proposed Depth/Form:22559 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CARL , Formation: CARLILE , Order: 407-3725 , Unit Acreage: 1600, Drill Unit: SEC22:S2; SEC 27 and
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-3725 , Unit Acreage: 1600, Drill Unit: SEC22:S2; SEC 27 and
Formation And Spacing:Code: FTHYS , Formation: FORT HAYS , Order: 407-3725 , Unit Acreage: 1600, Drill Unit: SEC22:S2; SEC 27 and
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-3725 , Unit Acreage: 960, Drill Unit: SEC15:ALL SEC22:N2
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2250 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 949, Top: 0 ft., Bottom: 2250 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 22559 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 3265, Top: , Bottom: 22559 ft.

Wellbore Completed
Completion Date:8/6/2022
Spud Date:6/2/2022Spud Date Is:ACTUAL
Measured TD:22697 ft.Measured PB depth:22677 ft.
True Vertical TD:7934 ft.True Vertical PB depth:7934 ft.
Top PZ Location:Sec:22 Twp: 1S 67WFootage: 2535 FSL  660 FEL
Bottom Hole Location:Sec:34 Twp: 1S 67WFootage: 476 FSL  658 FEL
Log Types:CBL, MWD (Composite log in 05-001-10516)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2345 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 1035, Top: 0 ft., Bottom: 2345 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 22693 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2535, Top: 2350 ft., Bottom: 22693 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN5311 ft.
SUSSEX5743 ft.
SHANNON7374 ft.
SHARON SPRINGS8905 ft.
NIOBRARA9102 ft.
FORT HAYS9861 ft.
CODELL9989 ft.
CARLILE15492 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 9/9/2024                  Interval Top: 15450 ft.    Interval Bottom: 18339 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:9/9/2024Treatment End Date:N/A
Treatment Summary:Completed Depths: 15,450' – 15,492', 18,212' – 18,339'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:15450 ft.# Of Holes:2496
Interval Bottom:18339 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 9/9/2024                  Interval Top: 12507 ft.    Interval Bottom: 12858 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:9/9/2024Treatment End Date:N/A
Treatment Summary:Completed Depths: 12,507' – 12,858'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:12507 ft.# Of Holes:2496
Interval Bottom:12858 ft.Hole Size:0.42 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 9/9/2024                  Interval Top: 12040 ft.    Interval Bottom: 16424 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:9/9/2024Treatment End Date:N/A
Treatment Summary:Completed Depths: 12,040' – 12,507', 16,322' – 16,424'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:12040 ft.# Of Holes:2496
Interval Bottom:16424 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 9/9/2024                  Interval Top: 10110 ft.    Interval Bottom: 22693 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:9/9/2024Treatment End Date:N/A
Treatment Summary:Completed Depths: 10,110’-12,040', 12,858' – 15,450', 15,492' – 16,322', 16,424' – 18,212', 18,339' - 22,693'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:10110 ft.# Of Holes:2496
Interval Bottom:22693 ft.Hole Size:0.42 in.

Formation NFCC                     Formation Classification:  OW                     Status:  PR - 4/15/2023                 Interval Top: 10110 ft.    Interval Bottom: 22693 ft.

 Completed Information for Formation NIOBRARA-FORT HAYS-CODELL-CARLILE
1st Production Date:4/4/2023Choke Size: 
Formation Name:NIOBRARA-FORT HAYS-CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:1/21/2023Treatment End Date:2/11/2023
Treatment Summary:70 Stage Plug and Perf Total Fluid: 263,586 bbls Gel Fluid: 139,878 bbls Slickwater Fluid: 123,214 bbls 15% HCl Acid: 494 bbls Total Proppant: 15,168,255 lbs Silica Proppant: 15,168,255 lbs Method for determining flowback: Measuring flowback tank volumes.
Total fluid used in treatment (bbls):263586Max pressure during treatment (psi):4531
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:70
Total acid used in treatment (bbls):494Min frac gradient (psi/ft):0.89
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):616
Fresh water used in treatment (bbls):263092Disposition method For flowback:DISPOSAL
Total proppant used (lbs):15168255Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:9512 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/15/2023Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 516
BBLS_OIL 858
BTU_GAS 1409
CALC_BBLS_H2O 516
CALC_BBLS_OIL 858
CALC_GOR 1119
CALC_MCF_GAS 961
CASING_PRESS 2624
GRAVITY_OIL 44
MCF_GAS 960
TUBING_PRESS 2263
Perforation Data:
Interval Top:10110 ft.# Of Holes:2496
Interval Bottom:22693 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)85446
Total Gas Produced (MCF)313477
GOR3668
GOR DeterminationBOE
Average BOE per Day382.075
Average MCFE per Day2216.032

 Federal Financial Assurance  i 

 Tribal Well  i No