Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10509
Well Classification: OW Status: PR - 9/1/2024
Well Name/No:GUS LD #15-031HNX
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/1/2024
FacilityID:476878LocationID:476754
County:ADAMS #001Location:SENE 21 1S67W 6
Field:WATTENBERG - #90750Elevation:5124 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1678FNL  456 FELLat/Long: 39.953021 / -104.885947Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.953020 / -104.885947Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/1/2022
End Date: 5/16/2022
Reported: 6/6/2022
Days to report: 21
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 9/1/2024             Measured TD: 16692 ft.    Vertical TD: 7504 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 9/1/2024
Wellbore PermitHORIZONTAL
Permit #:Expiration Date:6/10/2022
Proposed Top PZ Location:Sec:22 Twp: 1S 67W Footage: 2564 FNL  2590 FEL
Bottom Hole Location:Sec:15 Twp: 1S 67W Footage: 370 FNL  2590 FEL
Proposed Depth/Form:16271 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-2794 , Unit Acreage: 960, Drill Unit: SEC15:ALL SEC22:N2
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2124 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 896, Top: 0 ft., Bottom: 2124 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16271 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2250, Top: , Bottom: 16271 ft.

Wellbore Completed
Completion Date:1/15/2022
Spud Date:11/9/2021Spud Date Is:ACTUAL
Measured TD:16692 ft.Measured PB depth:16646 ft.
True Vertical TD:7504 ft.True Vertical PB depth:7507 ft.
Top PZ Location:Sec:22 Twp: 1S 67WFootage: 2399 FNL  5438 FEL
Bottom Hole Location:Sec:15 Twp: 1S 67WFootage: 298 FNL  2579 FEL
Log Types:MWD/LWD, Mud, CBL (Composite in 001-10516)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2056 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 992, Top: 88 ft., Bottom: 2056 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16652 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 1795, Top: 1540 ft., Bottom: 16652 ft., Determination Method: CBL
Casing:String Type: OPEN HOLE, Hole Size: 8.5 in., Size: , Top: 16652 ft., Depth: 16692 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
Additional Cement:String Type: SURF , Top: 0 ft., Depth: , Bottom: 88 ft., Sacks: 60, Method: 1 INCH
FormationInterval TopLog BottomCoredDSTs
PARKMAN4905 ft.5117 ft.NN
SUSSEX5406 ft.5629 ft.NN
SHANNON6260 ft.6464 ft.NN
SHARON SPRINGS8472 ft.NN
NIOBRARA8688 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 9/1/2024                  Interval Top: 9238 ft.    Interval Bottom: 16483 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:5/1/2022Treatment End Date:5/16/2022
Treatment Summary:28 Stage Plug and Perf Total Fluid: 202,478 bbls Slickwater Fluid: 15% HCl Acid: 2,113 bbls Total Proppant: Silica Proppant:
Total fluid used in treatment (bbls):202478Max pressure during treatment (psi):4531
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:28
Total acid used in treatment (bbls):2113Min frac gradient (psi/ft):0.91
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):200365Disposition method For flowback:
Total proppant used (lbs):6959586Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 330
BBLS_OIL 211
BTU_GAS 1409
CALC_BBLS_H2O 330
CALC_BBLS_OIL 211
CALC_GOR 1374
CALC_MCF_GAS 290
CASING_PRESS 2048
GRAVITY_OIL 44
MCF_GAS 290
TUBING_PRESS 1556
Perforation Data:
Interval Top:9238 ft.# Of Holes:1326
Interval Bottom:16483 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)7214
Total Gas Produced (MCF)123869
GOR17170
GOR DeterminationMCFE
Average BOE per Day78.316
Average MCFE per Day454.219

 Federal Financial Assurance  i 

 Tribal Well  i No