Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10504
Well Classification: OW Status: PR - 4/7/2023
Well Name/No:GUS LD #15-038HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/7/2023
FacilityID:476873LocationID:476754
County:ADAMS #001Location:SENE 21 1S67W 6
Field:WATTENBERG - #90750Elevation:5129 ft.
Planned Location:1724FNL  306 FELLat/Long: 39.952897 / -104.885412Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/12/2023
End Date: 2/22/2023
Reported: 3/21/2023
Days to report: 27
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 4/7/2023             Measured TD: 17660 ft.    Vertical TD: 7902 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 4/7/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:6/10/2022
Proposed Top PZ Location:Sec:22 Twp: 1S 67W Footage: 2531 FNL  859 FEL
Bottom Hole Location:Sec:15 Twp: 1S 67W Footage: 294 FNL  863 FEL
Proposed Depth/Form:17300 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CARL , Formation: CARLILE , Order: 407-3725 , Unit Acreage: 960, Drill Unit: SEC15:ALL SEC22:N2
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-3725 , Unit Acreage: 960, Drill Unit: SEC15:ALL SEC22:N2
Formation And Spacing:Code: FTHYS , Formation: FORT HAYS , Order: 407-3725 , Unit Acreage: 960, Drill Unit: SEC15:ALL SEC22:N2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-3725 , Unit Acreage: 960, Drill Unit: SEC15:ALL SEC22:N2
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1752 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 685, Top: 0 ft., Bottom: 1752 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17300 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1927, Top: 5286 ft., Bottom: 17300 ft.

Wellbore Completed
Completion Date:3/2/2022
Spud Date:11/19/2021Spud Date Is:ACTUAL
Measured TD:17660 ft.Measured PB depth:17655 ft.
True Vertical TD:7902 ft.True Vertical PB depth:7902 ft.
Top PZ Location:Sec:22 Twp: 1S 67WFootage: 2531 FNL  859 FEL
Bottom Hole Location:Sec:15 Twp: 1S 67WFootage: 294 FNL  863 FEL
Log Types:MWD/LWD, Mud, CBL (Composite in 001-10516)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2043 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 1048, Top: 0 ft., Bottom: 2043 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17660 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 1900, Top: 2086 ft., Bottom: 17660 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN5232 ft.5408 ft.NN
SUSSEX5735 ft.5979 ft.NN
SHANNON6655 ft.6907 ft.NN
SHARON SPRINGS9061 ft.NN
NIOBRARA9235 ft.NN
FORT HAYS9901 ft.NN
CODELL9990 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 8/28/2024                 Interval Top: 12783 ft.    Interval Bottom: 14453 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:8/28/2024Treatment End Date:N/A
Treatment Summary:Completed Depths: 12,783'-14,453'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:12783 ft.# Of Holes:1438
Interval Bottom:14453 ft.Hole Size:0.42 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 8/28/2024                 Interval Top: 12133 ft.    Interval Bottom: 16606 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:8/28/2024Treatment End Date:N/A
Treatment Summary:Completed Depths: 12,133’ – 12,783’, 14,453’ – 14,864’, 16,094’ – 16,606’
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:12133 ft.# Of Holes:1438
Interval Bottom:16606 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 8/28/2024                 Interval Top: 10187 ft.    Interval Bottom: 17482 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:8/28/2024Treatment End Date:N/A
Treatment Summary:Completed Depths: 10,187’-12,133’, 14,864’- 16,094’, 16,606’ – 17,482’
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:10187 ft.# Of Holes:1438
Interval Bottom:17482 ft.Hole Size:0.42 in.

Formation NBFHC                   Formation Classification:  OW                   Status:  PR - 4/7/2023                  Interval Top: 10187 ft.    Interval Bottom: 17482 ft.

 Completed Information for Formation NIOBRARA-FT HAYS-CODELL
1st Production Date:3/23/2023Choke Size: 
Formation Name:NIOBRARA-FT HAYS-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:2/12/2023Treatment End Date:2/22/2023
Treatment Summary:40 Stage Plug and Perf Total Fluid: 144,639 Gel Fluid: 77,812 bbls Slickwater Fluid: 66,335 bbls 15% HCl Acid: 492 bbls Total Proppant: 8,628,320 lbs Silica Proppant: 8,628,320 lbs Method for determining flowback: Measuring flowback tank volumes.
Total fluid used in treatment (bbls):144639Max pressure during treatment (psi):4797
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:40
Total acid used in treatment (bbls):492Min frac gradient (psi/ft):0.90
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):3668
Fresh water used in treatment (bbls):144147Disposition method For flowback:DISPOSAL
Total proppant used (lbs):8628320Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:9735 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/7/2023Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 383
BBLS_OIL 433
BTU_GAS 1409
CALC_BBLS_H2O 383
CALC_BBLS_OIL 433
CALC_GOR 1275
CALC_MCF_GAS 552
CASING_PRESS 2017
GRAVITY_OIL 44
MCF_GAS 552
TUBING_PRESS 1604
Perforation Data:
Interval Top:10187 ft.# Of Holes:1438
Interval Bottom:17482 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)38948
Total Gas Produced (MCF)209847
GOR5387
GOR DeterminationBOE
Average BOE per Day205.538
Average MCFE per Day1192.129

 Federal Financial Assurance  i 

 Tribal Well  i No