Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10497
Well Classification: OW Status: PR - 3/31/2023
Well Name/No:GUS LD #34-378HNX
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/31/2023
FacilityID:476866LocationID:476754
County:ADAMS #001Location:SENE 21 1S66W 6
Field:WATTENBERG - #90750Elevation:5124 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1603FNL  456 FELLat/Long: 39.953227 / -104.885946Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.953225 / -104.885946Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/25/2022
End Date: 12/27/2022
Reported: 1/26/2023
Days to report: 30
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 3/31/2023             Measured TD: 21131 ft.    Vertical TD: 7623 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 3/31/2023
Wellbore PermitHORIZONTAL
Permit #:Expiration Date:6/10/2022
Proposed Top PZ Location:Sec:22 Twp: 1S 67W Footage: 2565 FSL  830 FWL
Bottom Hole Location:Sec:34 Twp: 1S 67W Footage: 370 FSL  850 FWL
Proposed Depth/Form:20903 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-2793 , Unit Acreage: 1600, Drill Unit: 27&34:ALL SEC22:S2
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2000 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 844, Top: 0 ft., Bottom: 2000 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 20903 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 3053, Top: , Bottom: 20903 ft.

Wellbore Completed
Completion Date:2/19/2022
Spud Date:10/26/2021Spud Date Is:ACTUAL
Measured TD:21131 ft.Measured PB depth:21125 ft.
True Vertical TD:7623 ft.True Vertical PB depth:7624 ft.
Top PZ Location:Sec:22 Twp: 1S 67WFootage: 2565 FSL  776 FWL
Bottom Hole Location:Sec:34 Twp: 1S 67WFootage: 295 FSL  851 FWL
Log Types:MWD/LWD, Mud, CBL (Composite in 001-10516)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2046 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 925, Top: 103 ft., Bottom: 2046 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 21131 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2355, Top: 1730 ft., Bottom: 21131 ft., Determination Method: CBL
Additional Cement:String Type: SURF , Top: 0 ft., Depth: , Bottom: 103 ft., Sacks: 122, Method: 1 INCH
FormationInterval TopLog BottomCoredDSTs
PARKMAN4580 ft.4709 ft.NN
SUSSEX4934 ft.5114 ft.NN
SHANNON5730 ft.6034 ft.NN
SHARON SPRINGS7745 ft.NN
NIOBRARA7957 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 3/31/2023                 Interval Top: 8354 ft.    Interval Bottom: 20915 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/17/2023Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:11/25/2022Treatment End Date:12/27/2022
Treatment Summary:69 Stage Plug and Perf Total Fluid: 275,891 bbls Gel Fluid: 136,296 bbls Slickwater Fluid: 138,297 bbls 15% HCl Acid: 1,298 bbls Total Proppant: 11,214,980 lbs Silica Proppant: 11,214,980 lbs Method for determining flowback: Measuring flowback tank volumes.
Total fluid used in treatment (bbls):277189Max pressure during treatment (psi):9796
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:69
Total acid used in treatment (bbls):1298Min frac gradient (psi/ft):0.90
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):20826
Fresh water used in treatment (bbls):275891Disposition method For flowback:DISPOSAL
Total proppant used (lbs):11214980Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7989 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/31/2023Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 630
BBLS_OIL 273
BTU_GAS 1409
CALC_BBLS_H2O 630
CALC_BBLS_OIL 273
CALC_GOR 1352
CALC_MCF_GAS 369
CASING_PRESS 1767
GRAVITY_OIL 44
MCF_GAS 369
TUBING_PRESS 1548
Perforation Data:
Interval Top:8354 ft.# Of Holes:2484
Interval Bottom:20915 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)7393
Total Gas Produced (MCF)160758
GOR21744
GOR DeterminationMCFE
Average BOE per Day96.259
Average MCFE per Day558.331

 Federal Financial Assurance  i 

 Tribal Well  i No