Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10491
Well Classification: OW Status: PR - 3/28/2023
Well Name/No:GUS LD #34-379HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/28/2023
FacilityID:476859LocationID:476754
County:ADAMS #001Location:SENE 21 1S67W 6
Field:WATTENBERG - #90750Elevation:5118 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1573FNL  456 FELLat/Long: 39.953309 / -104.885946Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.953307 / -104.885947Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/25/2022
End Date: 12/27/2022
Reported: 1/26/2023
Days to report: 30
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 3/28/2023             Measured TD: 21346 ft.    Vertical TD: 8015 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 3/28/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:6/10/2022
Proposed Top PZ Location:Sec:22 Twp: 1S 67W Footage: 2539 FSL  484 FWL
Bottom Hole Location:Sec:34 Twp: 1S 67W Footage: 370 FSL  484 FWL
Proposed Depth/Form:21243 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-2793 , Unit Acreage: 1600, Drill Unit: 27&34:ALL SEC22:S2
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1700 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 665, Top: 0 ft., Bottom: 1700 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 21243 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 2701, Top: 4400 ft., Bottom: 21243 ft.

Wellbore Completed
Completion Date:3/5/2022
Spud Date:10/28/2021Spud Date Is:ACTUAL
Measured TD:21346 ft.Measured PB depth:21340 ft.
True Vertical TD:8015 ft.True Vertical PB depth:8015 ft.
Top PZ Location:Sec:22 Twp: 1S 67WFootage: 2504 FSL  490 FWL
Bottom Hole Location:Sec:34 Twp: 1S 67WFootage: 303 FSL  495 FWL
Log Types:MWD/LWD, Mud, CBL (Composite in 001-10516)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2041 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 984, Top: 0 ft., Bottom: 2041 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 21346 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2380, Top: 3305 ft., Bottom: 21346 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4563 ft.4714 ft.NN
SUSSEX4928 ft.5097 ft.NN
SHANNON5549 ft.5701 ft.NN
SHARON SPRINGS7581 ft.NN
NIOBRARA7736 ft.NN
FORT HAYS8349 ft.NN
CODELL8453 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 9/11/2023                 Interval Top: 12075 ft.    Interval Bottom: 15061 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:9/11/2023Treatment End Date:N/A
Treatment Summary:Completed Depths: 12,075’ – 12,336’, 14,797’ – 15,061’
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:12075 ft.# Of Holes:2480
Interval Bottom:15061 ft.Hole Size:0.42 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 9/11/2023                 Interval Top: 9136 ft.    Interval Bottom: 20210 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:9/11/2023Treatment End Date:N/A
Treatment Summary:Completed Depths: 9,136’ – 9,347’, 10,164’ – 10,487’, 11,401’ – 12,075’, 12,976’- 13,260’, 14,475’ – 14,797’, 17,715’ – 18,025’, 19,944’- 20,210’
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:9136 ft.# Of Holes:2480
Interval Bottom:20210 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 9/11/2023                 Interval Top: 8598 ft.    Interval Bottom: 21178 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:9/11/2023Treatment End Date:N/A
Treatment Summary:Completed Depths: 8,598’- 9,136’, 9,347’ – 10,164’, 10,487’ – 11,401’, 12,336’ – 12,976’, 13,260’ – 14,475’, 15,061’- 17,715’, 18,025’- 19,944’, 20,210’-21,178’
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8598 ft.# Of Holes:2480
Interval Bottom:21178 ft.Hole Size:0.42 in.

Formation NBFHC                   Formation Classification:  OW                   Status:  PR - 3/28/2023                 Interval Top: 8598 ft.    Interval Bottom: 21178 ft.

 Completed Information for Formation NIOBRARA-FT HAYS-CODELL
1st Production Date:3/18/2023Choke Size: 
Formation Name:NIOBRARA-FT HAYS-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:11/25/2022Treatment End Date:12/27/2022
Treatment Summary:69 Stage Plug and Perf Total Fluid: 254,008 Gel Fluid: 123,985 bbls Slickwater Fluid: 129,169 bbls 15% HCl Acid: 854 bbls Total Proppant: 14,909,645 lbs Silica Proppant: 14,909,645 lbs Method for determining flowback: Measuring flowback tank volumes.
Total fluid used in treatment (bbls):254008Max pressure during treatment (psi):4519
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:69
Total acid used in treatment (bbls):854Min frac gradient (psi/ft):0.83
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):14335
Fresh water used in treatment (bbls):253154Disposition method For flowback:DISPOSAL
Total proppant used (lbs):14909645Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8223 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/28/2023Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 893
BBLS_OIL 285
BTU_GAS 1409
CALC_BBLS_H2O 893
CALC_BBLS_OIL 285
CALC_GOR 1270
CALC_MCF_GAS 362
CASING_PRESS 2577
GRAVITY_OIL 44
MCF_GAS 362
TUBING_PRESS 2011
Perforation Data:
Interval Top:8598 ft.# Of Holes:2480
Interval Bottom:21178 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)12738
Total Gas Produced (MCF)205829
GOR16158
GOR DeterminationMCFE
Average BOE per Day132.656
Average MCFE per Day769.402

 Federal Financial Assurance  i 

 Tribal Well  i No