Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10486
Well Classification: OW Status: PR - 3/29/2023
Well Name/No:Gus LD #34-370HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/29/2023
FacilityID:476854LocationID:476754
County:ADAMS #001Location:SENE 21 1S67W 6
Field:WATTENBERG - #90750Elevation:5124 ft.
Planned Location:1588FNL  381 FELLat/Long: 39.953268 / -104.885679Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/28/2022
End Date: 1/12/2023
Reported: 1/26/2023
Days to report: 14
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 3/29/2023             Measured TD: 21828 ft.    Vertical TD: 7965 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 3/29/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:4/10/2025
Proposed Top PZ Location:Sec:22 Twp: 1S 67W Footage: 2566 FSL  1580 FWL
Bottom Hole Location:Sec:34 Twp: 1S 67W Footage: 476 FSL  2438 FEL
Proposed Depth/Form:21891 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CARL , Formation: CARLILE , Order: 407-3725 , Unit Acreage: 1600, Drill Unit: 27&34:ALL SEC22:S2
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-3725 , Unit Acreage: 1600, Drill Unit: 27&34:ALL SEC22:S2
Formation And Spacing:Code: FTHYS , Formation: FORT HAYS , Order: 407-3725 , Unit Acreage: 1600, Drill Unit: 27&34:ALL SEC22:S2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-3725 , Unit Acreage: 1600, Drill Unit: 27&34:ALL SEC22:S2
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2021 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 853, Top: 0 ft., Bottom: 2021 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 21891 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 3209, Top: , Bottom: 21891 ft.

Wellbore Completed
Completion Date:7/6/2022
Spud Date:5/30/2022Spud Date Is:ACTUAL
Measured TD:21828 ft.Measured PB depth:21806 ft.
True Vertical TD:7965 ft.True Vertical PB depth:7965 ft.
Top PZ Location:Sec:22 Twp: 1S 67WFootage: 2566 FSL  1580 FWL
Bottom Hole Location:Sec:34 Twp: 1S 67WFootage: 476 FSL  2438 FEL
Log Types:CBL, MWD (Composite log in 05-001-10516)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2081 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 944, Top: 0 ft., Bottom: 2081 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 21820 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2425, Top: 1230 ft., Bottom: 21820 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4927 ft.
SUSSEX5321 ft.
SHANNON6711 ft.
SHARON SPRINGS8107 ft.
NIOBRARA8282 ft.
FORT HAYS8963 ft.
CODELL9041 ft.
CARLILE15107 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 8/28/2024                 Interval Top: 15107 ft.    Interval Bottom: 15596 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:8/28/2024Treatment End Date:N/A
Treatment Summary:Completed Depths: 15,107' – 15,596’
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:15107 ft.# Of Holes:1272
Interval Bottom:15596 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 8/28/2024                 Interval Top: 10694 ft.    Interval Bottom: 11157 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:8/28/2024Treatment End Date:N/A
Treatment Summary:Completed Depths: 10,694' – 11,157'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:10694 ft.# Of Holes:1272
Interval Bottom:11157 ft.Hole Size:0.42 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 8/28/2024                 Interval Top: 10119 ft.    Interval Bottom: 16460 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:8/28/2024Treatment End Date:N/A
Treatment Summary:Completed Depths: 10,119' – 10,694', 12,038' – 12,367', 16,265' – 16,460'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:10119 ft.# Of Holes:1272
Interval Bottom:16460 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 8/28/2024                 Interval Top: 9244 ft.    Interval Bottom: 21820 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:8/28/2024Treatment End Date:N/A
Treatment Summary:Completed Depths: 9,244’- - 10,119', 11,157' – 12,038', 12,367' – 15,107', 15,596' – 16,265', 16460' – 21,820'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:9244 ft.# Of Holes:1272
Interval Bottom:21820 ft.Hole Size:0.42 in.

Formation NFCC                     Formation Classification:  OW                     Status:  PR - 3/29/2023                 Interval Top: 9244 ft.    Interval Bottom: 21820 ft.

 Completed Information for Formation NIOBRARA-FORT HAYS-CODELL-CARLILE
1st Production Date:3/21/2023Choke Size: 
Formation Name:NIOBRARA-FORT HAYS-CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:12/28/2022Treatment End Date:1/12/2023
Treatment Summary:36 Stage Plug and Perf Total Fluid: 233,212 bbls Gel Fluid: 163,554 bbls Slickwater Fluid: 68,997 bbls 15% HCl Acid: 661 bbls Total Proppant: 15,387,487 lbs Silica Proppant: 15,387,487 lbs Method for determining flowback: Measuring flowback tank volumes.
Total fluid used in treatment (bbls):233212Max pressure during treatment (psi):4283
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:36
Total acid used in treatment (bbls):661Min frac gradient (psi/ft):0.88
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):18720
Fresh water used in treatment (bbls):232551Disposition method For flowback:DISPOSAL
Total proppant used (lbs):15387487Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8721 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/29/2023Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1011
BBLS_OIL 514
BTU_GAS 1409
CALC_BBLS_H2O 1011
CALC_BBLS_OIL 514
CALC_GOR 1060
CALC_MCF_GAS 545
CASING_PRESS 2368
GRAVITY_OIL 44
MCF_GAS 545
TUBING_PRESS 1736
Perforation Data:
Interval Top:9244 ft.# Of Holes:1272
Interval Bottom:21820 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)60699
Total Gas Produced (MCF)305629
GOR5035
GOR DeterminationBOE
Average BOE per Day310.201
Average MCFE per Day1799.159

 Federal Financial Assurance  i 

 Tribal Well  i No