Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10377
Well Classification: OW Status: PR - 8/15/2020
Well Name/No:Baseline LE #06-069HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/15/2020
FacilityID:460379LocationID:460375
County:ADAMS #001Location:NWNE 2 1S67W 6
Field:WATTENBERG - #90750Elevation:5009 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:623FNL  1333 FELLat/Long: 39.998672 / -104.851336Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.998673 / -104.851337Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/20/2020
End Date: 7/3/2020
Reported: 7/23/2020
Days to report: 20
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 8/15/2020             Measured TD: 15655 ft.    Vertical TD: 7673 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 8/15/2020
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:12/27/2020
Proposed Top PZ Location:Sec:1 Twp: 1S 67W Footage: 754 FNL  460 FWL
Bottom Hole Location:Sec:6 Twp: 1S 66W Footage: 741 FNL  2432 FWL
Proposed Depth/Form:15687 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CARL , Formation: CARLILE , Order: 407-3734 , Unit Acreage: 895, Drill Unit: Sec 1:ALL Sec 6:W2
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-3734 , Unit Acreage: 895, Drill Unit: Sec 1:ALL Sec 6:W2
Formation And Spacing:Code: FTHYS , Formation: FORT HAYS , Order: 407-3734 , Unit Acreage: 895, Drill Unit: Sec 1:ALL Sec 6:W2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-3734 , Unit Acreage: 895, Drill Unit: Sec 1:ALL Sec 6:W2
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1700 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 707, Top: 0 ft., Bottom: 1700 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 15687 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1941, Top: , Bottom: 15687 ft.

Wellbore Completed
Completion Date:3/24/2020
Spud Date:12/16/2019Spud Date Is:ACTUAL
Measured TD:15655 ft.Measured PB depth:15638 ft.
True Vertical TD:7673 ft.True Vertical PB depth:7673 ft.
Top PZ Location:Sec:1 Twp: 1S 67WFootage: 754 FNL  460 FWL
Bottom Hole Location:Sec:6 Twp: 1S 66WFootage: 741 FNL  2432 FWL
Log Types:Mud Log, MWD/LWD, Composite, CBL, (Composite in 001-10365)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1789 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 800, Top: 0 ft., Bottom: 1789 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 15655 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2040, Top: 3682 ft., Bottom: 15655 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4312 ft.4518 ft.NN
SUSSEX4771 ft.5044 ft.NN
SHANNON5391 ft.5520 ft.NN
SHARON SPRINGS7601 ft.NN
NIOBRARA7620 ft.NN
FORT HAYS8260 ft.NN
CODELL8341 ft.NN

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 9/30/2024                 Interval Top: 14540 ft.    Interval Bottom: 14768 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:8/6/2020Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:9/30/2024Treatment End Date:N/A
Treatment Summary:Ft. Hays Perf Interval: 14540' - 14768'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:No
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:14540 ft.# Of Holes:1050
Interval Bottom:14768 ft.Hole Size:0.38 in.

Formation CD-FH                   Formation Classification:  OW                   Status:  PR - 8/15/2020                 Interval Top: 8469 ft.    Interval Bottom: 15361 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:8/6/2020Choke Size: 
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/20/2020Treatment End Date:7/3/2020
Treatment Summary:36 bbls 15% HCL Acid; 301,357 # 100 Mesh Sand; 3,263,640 # 20/40 Sand; 83,045 bbls gelled fluid; Flowback determined from well test separator.
Total fluid used in treatment (bbls):83081Max pressure during treatment (psi):4039
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:35
Total acid used in treatment (bbls):36Min frac gradient (psi/ft):0.89
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):18710
Fresh water used in treatment (bbls):83045Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3564997Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7874 ft.
Tubing Packer Depth:7857 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/15/2020Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 227
BBLS_OIL 407
BTU_GAS 1382
CALC_BBLS_H2O 227
CALC_BBLS_OIL 407
CALC_GOR 1002
CALC_MCF_GAS 408
GRAVITY_OIL 43
MCF_GAS 408
TUBING_PRESS 1716
Perforation Data:
Interval Top:8469 ft.# Of Holes:1050
Interval Bottom:15361 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 9/30/2024                 Interval Top: 8469 ft.    Interval Bottom: 15361 ft.

 Completed Information for Formation CODELL
1st Production Date:8/6/2020Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:9/30/2024Treatment End Date:N/A
Treatment Summary:Codell Perf Interval: 8469' - 14539'; 14769' - 15361'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8469 ft.# Of Holes:1050
Interval Bottom:15361 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)7172
Total Gas Produced (MCF)50664
GOR7064
GOR DeterminationBOE
Average BOE per Day43.512
Average MCFE per Day252.406

 Federal Financial Assurance  i 

 Tribal Well  i No