Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10377
Well Classification: OW Status: PR - 8/15/2020
Well Name/No:Baseline LE #06-069HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/15/2020
FacilityID:460379LocationID:460375
County:ADAMS #001Location:NWNE 2 1S67W 6
Field:WATTENBERG - #90750Elevation:5009 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:623FNL  1333 FELLat/Long: 39.998672 / -104.851336Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.998673 / -104.851337Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/20/2020
End Date: 7/3/2020
Reported: 7/23/2020
Days to report: 20
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 8/15/2020             Measured TD: 15655 ft.    Vertical TD: 7673 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 8/15/2020
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:12/27/2020
Proposed Top PZ Location:Sec:1 Twp: 1S 67W Footage: 754 FNL  460 FWL
Bottom Hole Location:Sec:6 Twp: 1S 66W Footage: 741 FNL  2432 FWL
Proposed Depth/Form:15687 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CARL , Formation: CARLILE , Order: 407-3734 , Unit Acreage: 895, Drill Unit: Sec 1:ALL Sec 6:W2
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-3734 , Unit Acreage: 895, Drill Unit: Sec 1:ALL Sec 6:W2
Formation And Spacing:Code: FTHYS , Formation: FORT HAYS , Order: 407-3734 , Unit Acreage: 895, Drill Unit: Sec 1:ALL Sec 6:W2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-3734 , Unit Acreage: 895, Drill Unit: Sec 1:ALL Sec 6:W2
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1700 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 707, Top: 0 ft., Bottom: 1700 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 15687 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1941, Top: , Bottom: 15687 ft.

Wellbore Completed
Completion Date:3/24/2020
Spud Date:12/16/2019Spud Date Is:ACTUAL
Measured TD:15655 ft.Measured PB depth:15638 ft.
True Vertical TD:7673 ft.True Vertical PB depth:7673 ft.
Top PZ Location:Sec:1 Twp: 1S 67WFootage: 754 FNL  460 FWL
Bottom Hole Location:Sec:6 Twp: 1S 66WFootage: 741 FNL  2432 FWL
Log Types:Mud Log, MWD/LWD, Composite, CBL, (Composite in 001-10365)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1789 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 800, Top: 0 ft., Bottom: 1789 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 15655 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2040, Top: 3682 ft., Bottom: 15655 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4312 ft.4518 ft.NN
SUSSEX4771 ft.5044 ft.NN
SHANNON5391 ft.5520 ft.NN
SHARON SPRINGS7601 ft.NN
NIOBRARA7620 ft.NN
FORT HAYS8260 ft.NN
CODELL8341 ft.NN

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 9/30/2024                 Interval Top: 14540 ft.    Interval Bottom: 14768 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:8/6/2020Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:9/30/2024Treatment End Date:N/A
Treatment Summary:Ft. Hays Perf Interval: 14540' - 14768'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:No
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:14540 ft.# Of Holes:1050
Interval Bottom:14768 ft.Hole Size:0.38 in.

Formation CD-FH                   Formation Classification:  OW                   Status:  PR - 8/15/2020                 Interval Top: 8469 ft.    Interval Bottom: 15361 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:8/6/2020Choke Size: 
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/20/2020Treatment End Date:7/3/2020
Treatment Summary:36 bbls 15% HCL Acid; 301,357 # 100 Mesh Sand; 3,263,640 # 20/40 Sand; 83,045 bbls gelled fluid; Flowback determined from well test separator.
Total fluid used in treatment (bbls):83081Max pressure during treatment (psi):4039
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:35
Total acid used in treatment (bbls):36Min frac gradient (psi/ft):0.89
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):18710
Fresh water used in treatment (bbls):83045Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3564997Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7874 ft.
Tubing Packer Depth:7857 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/15/2020Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 227
BBLS_OIL 407
BTU_GAS 1382
CALC_BBLS_H2O 227
CALC_BBLS_OIL 407
CALC_GOR 1002
CALC_MCF_GAS 408
GRAVITY_OIL 43
MCF_GAS 408
TUBING_PRESS 1716
Perforation Data:
Interval Top:8469 ft.# Of Holes:1050
Interval Bottom:15361 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 9/30/2024                 Interval Top: 8469 ft.    Interval Bottom: 15361 ft.

 Completed Information for Formation CODELL
1st Production Date:8/6/2020Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:9/30/2024Treatment End Date:N/A
Treatment Summary:Codell Perf Interval: 8469' - 14539'; 14769' - 15361'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8469 ft.# Of Holes:1050
Interval Bottom:15361 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)7302
Total Gas Produced (MCF)48113
GOR6589
GOR DeterminationBOE
Average BOE per Day42.698
Average MCFE per Day247.668

 Federal Financial Assurance  i 

 Tribal Well  i No