Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10365
Well Classification: OW Status: PR - 8/1/2019
Well Name/No:Baseline LE #06-252HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/1/2019
FacilityID:460366LocationID:460375
County:ADAMS #001Location:NWNE 2 1S67W 6
Field:WATTENBERG - #90750Elevation:5010 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:723FNL  1406 FELLat/Long: 39.998397 / -104.851606Lat/Long Source: Field Measured
As Drilled Location:723 FNL  1437 FELLat/Long: 39.998398 / -104.851712Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/1/2019
End Date: 8/11/2019
Reported: 9/16/2019
Days to report: 36
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 8/1/2019             Measured TD: 16550 ft.    Vertical TD: 7676 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 8/1/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:12/27/2020
Proposed Top PZ Location:Sec:1 Twp: 1S 67W Footage: 1987 FSL  460 FWL
Bottom Hole Location:Sec:6 Twp: 1S 66W Footage: 1975 FSL  2283 FWL
Proposed Depth/Form:16058 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-2176 , Unit Acreage: 895, Drill Unit: Sec 1:ALL Sec 6:W2
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1700 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 707, Top: 0 ft., Bottom: 1700 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16058 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1987, Top: , Bottom: 16058 ft.

Wellbore Completed
Completion Date:7/6/2019
Spud Date:6/22/2019Spud Date Is:ACTUAL
Measured TD:16550 ft.Measured PB depth:16031 ft.
True Vertical TD:7676 ft.True Vertical PB depth:7681 ft.
Top PZ Location:Sec:1 Twp: 1S 67WFootage: 1973 FSL  553 FWL
Bottom Hole Location:Sec:6 Twp: 1S 66WFootage: 1972 FSL  2514 FEL
Log Types:Mud log, MWD/LWD, CBL, Composite
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1794 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 800, Top: 0 ft., Bottom: 1794 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16042 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 2269, Top: 1472 ft., Bottom: 16042 ft., Determination Method: CBL
Casing:String Type: OPEN HOLE, Hole Size: 8.5 in., Size: , Top: 16042 ft., Depth: 16550 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PARKMAN4511 ft.4721 ft.NN
SUSSEX4957 ft.5161 ft.NN
SHANNON5544 ft.5776 ft.NN
SHARON SPRINGS7849 ft.NN
NIOBRARA7871 ft.NN
FORT HAYS8508 ft.NN
CODELL8627 ft.NN
CARLILE11691 ft.NN

Formation CARL                     Formation Classification:  OW                     Status:  CM - 7/28/2020                 Interval Top: 11691 ft.    Interval Bottom: 13338 ft.

 Completed Information for Formation CARLILE
1st Production Date:9/17/2019Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:7/28/2020Treatment End Date:N/A
Treatment Summary:Carlile Perf Interval: 11,691'- 12,285', 13,073' - 13,338'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:11691 ft.# Of Holes:1020
Interval Bottom:13338 ft.Hole Size:0.38 in.

Formation CD-CRL                 Formation Classification:  OW                 Status:  PR - 9/10/2019                 Interval Top: 8994 ft.    Interval Bottom: 15741 ft.

 Completed Information for Formation CODELL-CARLILE
1st Production Date:9/17/2019Choke Size: 
Formation Name:CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/1/2019Treatment End Date:8/11/2019
Treatment Summary:341,600# 100 Mesh Sand; 6,462,468# 20/40 Sand; 114,879 bbls gelled fluid; Flowback determined from well test separator.
Total fluid used in treatment (bbls):114879Max pressure during treatment (psi):4185
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:34
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.90
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):12827
Fresh water used in treatment (bbls):114879Disposition method For flowback:DISPOSAL
Total proppant used (lbs):6804068Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7558 ft.
Tubing Packer Depth:7571 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/10/2019Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 330
BBLS_OIL 652
BTU_GAS 1439
CALC_BBLS_H2O 330
CALC_BBLS_OIL 652
CALC_GOR 1396
CALC_MCF_GAS 910
CASING_PRESS 153
GRAVITY_OIL 45
MCF_GAS 910
TUBING_PRESS 1473
Perforation Data:
Interval Top:8994 ft.# Of Holes:1020
Interval Bottom:15741 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 7/28/2020                 Interval Top: 8994 ft.    Interval Bottom: 15741 ft.

 Completed Information for Formation CODELL
1st Production Date:9/17/2019Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:7/28/2020Treatment End Date:N/A
Treatment Summary:Codell Perf Interval: 8,994' - 11,690', 12,286' - 13,072', 13,339' - 15,741'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8994 ft.# Of Holes:1020
Interval Bottom:15741 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)3196
Total Gas Produced (MCF)49484
GOR15483
GOR DeterminationMCFE
Average BOE per Day32.137
Average MCFE per Day186.353

 Federal Financial Assurance  i 

 Tribal Well  i No