Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10345
Well Classification: OW Status: PR - 12/1/2023
Well Name/No:Brant LE #08-082HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/1/2023
FacilityID:460121LocationID:460107
County:ADAMS #001Location:SENE 11 1S67W 6
Field:WATTENBERG - #90750Elevation:4973 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2164FNL  331 FELLat/Long: 39.980869 / -104.847923Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.980871 / -104.847922Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/13/2019
End Date: 7/22/2019
Reported: 9/16/2019
Originally Reported: 7/25/2019
Days to report: 56
Days to report: 3
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 12/1/2023             Measured TD: 23434 ft.    Vertical TD: 7654 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 12/1/2023
Wellbore PermitHORIZONTAL
Permit #:Expiration Date:12/19/2020
Proposed Top PZ Location:Sec:12 Twp: 1S 67W Footage: 1225 FNL  460 FWL
Bottom Hole Location:Sec:8 Twp: 1S 66W Footage: 1225 FNL  370 FEL
Proposed Depth/Form:23264 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-2246 , Unit Acreage: 1923, Drill Unit: Sec 12, 7 & 8: All
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1700 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 717, Top: 0 ft., Bottom: 1700 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 23264 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 3171, Top: , Bottom: 23264 ft.

Wellbore Completed
Completion Date:6/27/2019
Spud Date:6/6/2019Spud Date Is:ACTUAL
Measured TD:23434 ft.Measured PB depth:23424 ft.
True Vertical TD:7654 ft.True Vertical PB depth:7654 ft.
Top PZ Location:Sec:12 Twp: 1S 67WFootage: 1218 FNL  518 FWL
Bottom Hole Location:Sec:8 Twp: 1S 66WFootage: 1240 FNL  240 FEL
Log Types:CBL, Mud Log, MWD/LWD, Composite
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1778 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 815, Top: 0 ft., Bottom: 1778 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 23434 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 3125, Top: 6644 ft., Bottom: 23434 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4399 ft.4567 ft.NN
SUSSEX4752 ft.4938 ft.NN
SHANNON5358 ft.5522 ft.NN
SHARON SPRINGS7357 ft.NN
NIOBRARA7389 ft.NN
FORT HAYS8028 ft.NN
CODELL8132 ft.NN

Formation CARL                     Formation Classification:  OW                     Status:  CM - 8/28/2020                 Interval Top: 17249 ft.    Interval Bottom: 17294 ft.

 Completed Information for Formation CARLILE
1st Production Date:8/14/2019Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:17249 ft.# Of Holes:2160
Interval Bottom:17294 ft.Hole Size:0.38 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 8/28/2020                 Interval Top: 13927 ft.    Interval Bottom: 21839 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:8/14/2019Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:8/28/2020Treatment End Date:N/A
Treatment Summary:Perf Intervals: 13927-14440, 14545-14573, 15769-15882, 17060-17248, 17550-17602, 21801-21839
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:13927 ft.# Of Holes:2160
Interval Bottom:21839 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 8/28/2020                 Interval Top: 13562 ft.    Interval Bottom: 13926 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/14/2019Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:13562 ft.# Of Holes:2160
Interval Bottom:13926 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 8/28/2020                 Interval Top: 8246 ft.    Interval Bottom: 23148 ft.

 Completed Information for Formation CODELL
1st Production Date:8/14/2019Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:8/28/2020Treatment End Date:N/A
Treatment Summary:Perf/producing intervals: 8246-13561, 14441-14544, 14574-15768, 15883-17059, 17295-17549, 17603-21800, 21840-23202'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8246 ft.# Of Holes:2160
Interval Bottom:23148 ft.Hole Size:0.38 in.

Formation NFCC                     Formation Classification:  OW                     Status:  PR - 12/1/2023                 Interval Top: 8246 ft.    Interval Bottom: 23202 ft.

 Completed Information for Formation NIOBRARA-FORT HAYS-CODELL-CARLILE
1st Production Date:8/14/2019Choke Size: 
Formation Name:NIOBRARA-FORT HAYS-CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/13/2019Treatment End Date:7/22/2019
Treatment Summary:0 bbls 15% HCL Acid; 720,000# 100 Mesh Sand; 13,548,046# 20/40 Sand; 262,690 bbls gelled fluid; Flowback determined from well test separator.
Total fluid used in treatment (bbls):262690Max pressure during treatment (psi):4167
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:72
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.84
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):29583
Fresh water used in treatment (bbls):262690Disposition method For flowback:DISPOSAL
Total proppant used (lbs):14268046Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7939 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/16/2019Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 591
BBLS_OIL 1043
BTU_GAS 1436
CALC_BBLS_H2O 591
CALC_BBLS_OIL 1043
CALC_GOR 1240
CALC_MCF_GAS 1293
CASING_PRESS 2254
GRAVITY_OIL 43
MCF_GAS 1293
TUBING_PRESS 1656
Perforation Data:
Interval Top:8246 ft.# Of Holes:2160
Interval Bottom:23202 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)11897
Total Gas Produced (MCF)157337
GOR13224
GOR DeterminationBOE
Average BOE per Day106.944
Average MCFE per Day620.273

 Federal Financial Assurance  i 

 Tribal Well  i No