Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10345
Well Classification: OW Status: PR - 12/1/2023
Well Name/No:Brant LE #08-082HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/1/2023
FacilityID:460121LocationID:460107
County:ADAMS #001Location:SENE 11 1S67W 6
Field:WATTENBERG - #90750Elevation:4973 ft.
Planned Location:2164FNL  331 FELLat/Long: 39.980869 / -104.847923Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.980871 / -104.847922Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/13/2019
End Date: 7/22/2019
Reported: 9/16/2019
Originally Reported: 7/25/2019
Days to report: 56
Days to report: 3
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 12/1/2023             Measured TD: 23434 ft.    Vertical TD: 7654 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 12/1/2023
Wellbore PermitHORIZONTAL
Permit #:Expiration Date:12/19/2020
Proposed Top PZ Location:Sec:12 Twp: 1S 67W Footage: 1225 FNL  460 FWL
Bottom Hole Location:Sec:8 Twp: 1S 66W Footage: 1225 FNL  370 FEL
Proposed Depth/Form:23264 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-2246 , Unit Acreage: 1923, Drill Unit: Sec 12, 7 & 8: All
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1700 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 717, Top: 0 ft., Bottom: 1700 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 23264 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 3171, Top: , Bottom: 23264 ft.

Wellbore Completed
Completion Date:6/27/2019
Spud Date:6/6/2019Spud Date Is:ACTUAL
Measured TD:23434 ft.Measured PB depth:23424 ft.
True Vertical TD:7654 ft.True Vertical PB depth:7654 ft.
Top PZ Location:Sec:12 Twp: 1S 67WFootage: 1218 FNL  518 FWL
Bottom Hole Location:Sec:8 Twp: 1S 66WFootage: 1240 FNL  240 FEL
Log Types:CBL, Mud Log, MWD/LWD, Composite
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1778 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 815, Top: 0 ft., Bottom: 1778 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 23434 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 3125, Top: 6644 ft., Bottom: 23434 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4399 ft.4567 ft.NN
SUSSEX4752 ft.4938 ft.NN
SHANNON5358 ft.5522 ft.NN
SHARON SPRINGS7357 ft.NN
NIOBRARA7389 ft.NN
FORT HAYS8028 ft.NN
CODELL8132 ft.NN

Formation CARL                     Formation Classification:  OW                     Status:  CM - 8/28/2020                 Interval Top: 17249 ft.    Interval Bottom: 17294 ft.

 Completed Information for Formation CARLILE
1st Production Date:8/14/2019Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:17249 ft.# Of Holes:2160
Interval Bottom:17294 ft.Hole Size:0.38 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 8/28/2020                 Interval Top: 13927 ft.    Interval Bottom: 21839 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:8/14/2019Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:8/28/2020Treatment End Date:N/A
Treatment Summary:Perf Intervals: 13927-14440, 14545-14573, 15769-15882, 17060-17248, 17550-17602, 21801-21839
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:13927 ft.# Of Holes:2160
Interval Bottom:21839 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 8/28/2020                 Interval Top: 13562 ft.    Interval Bottom: 13926 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/14/2019Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:13562 ft.# Of Holes:2160
Interval Bottom:13926 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 8/28/2020                 Interval Top: 8246 ft.    Interval Bottom: 23148 ft.

 Completed Information for Formation CODELL
1st Production Date:8/14/2019Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:8/28/2020Treatment End Date:N/A
Treatment Summary:Perf/producing intervals: 8246-13561, 14441-14544, 14574-15768, 15883-17059, 17295-17549, 17603-21800, 21840-23202'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8246 ft.# Of Holes:2160
Interval Bottom:23148 ft.Hole Size:0.38 in.

Formation NFCC                     Formation Classification:  OW                     Status:  PR - 12/1/2023                 Interval Top: 8246 ft.    Interval Bottom: 23202 ft.

 Completed Information for Formation NIOBRARA-FORT HAYS-CODELL-CARLILE
1st Production Date:8/14/2019Choke Size: 
Formation Name:NIOBRARA-FORT HAYS-CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/13/2019Treatment End Date:7/22/2019
Treatment Summary:0 bbls 15% HCL Acid; 720,000# 100 Mesh Sand; 13,548,046# 20/40 Sand; 262,690 bbls gelled fluid; Flowback determined from well test separator.
Total fluid used in treatment (bbls):262690Max pressure during treatment (psi):4167
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:72
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.84
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):29583
Fresh water used in treatment (bbls):262690Disposition method For flowback:DISPOSAL
Total proppant used (lbs):14268046Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7939 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/16/2019Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 591
BBLS_OIL 1043
BTU_GAS 1436
CALC_BBLS_H2O 591
CALC_BBLS_OIL 1043
CALC_GOR 1240
CALC_MCF_GAS 1293
CASING_PRESS 2254
GRAVITY_OIL 43
MCF_GAS 1293
TUBING_PRESS 1656
Perforation Data:
Interval Top:8246 ft.# Of Holes:2160
Interval Bottom:23202 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
April 2024 - March 2025i
Total Oil Produced (Barrels)12381
Total Gas Produced (MCF)116620
GOR9419
GOR DeterminationBOE
Average BOE per Day91.597
Average MCFE per Day531.261

 Federal Financial Assurance  i 

 Tribal Well  i No