Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10332
Well Classification: OW Status: PR - 5/31/2020
Well Name/No:Brant LE #08-199HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/31/2020
FacilityID:460108LocationID:460107
County:ADAMS #001Location:SENE 11 1S67W 6
Field:WATTENBERG - #90750Elevation:4973 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2230FNL  411 FELLat/Long: 39.980685 / -104.848211Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.980685 / -104.848209Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/12/2020
End Date: 4/7/2020
Reported: 4/20/2020
Days to report: 13
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 5/31/2020             Measured TD: 23369 ft.    Vertical TD: 7615 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 5/31/2020
Wellbore PermitHORIZONTAL
Permit #:Expiration Date:12/19/2020
Proposed Top PZ Location:Sec:12 Twp: 1S 67W Footage: 2591 FNL  523 FWL
Bottom Hole Location:Sec:8 Twp: 1S 66W Footage: 2599 FNL  246 FEL
Proposed Depth/Form:23136 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CARL , Formation: CARLILE , Order: 407-3712 , Unit Acreage: 1923, Drill Unit: Sec 12, 7 & 8: ALL
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-3712 , Unit Acreage: 1923, Drill Unit: Sec 12, 7 & 8: ALL
Formation And Spacing:Code: FTHYS , Formation: FORT HAYS , Order: 407-3712 , Unit Acreage: 1923, Drill Unit: Sec 12, 7 & 8: ALL
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-3712 , Unit Acreage: 1923, Drill Unit: Sec 12, 7 & 8: ALL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1700 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 717, Top: 0 ft., Bottom: 1700 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 23136 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 3150, Top: , Bottom: 23136 ft.

Wellbore Completed
Completion Date:2/3/2020
Spud Date:12/8/2019Spud Date Is:ACTUAL
Measured TD:23369 ft.Measured PB depth:23358 ft.
True Vertical TD:7615 ft.True Vertical PB depth:7615 ft.
Top PZ Location:Sec:12 Twp: 1S 67WFootage: 2591 FNL  523 FWL
Bottom Hole Location:Sec:8 Twp: 1S 66WFootage: 2599 FNL  246 FEL
Log Types:Composite, Mud Log, MWD/LWD, CBL (Composite in 05-001-10345)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1771 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 800, Top: 0 ft., Bottom: 1771 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 23369 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 3320, Top: 1920 ft., Bottom: 23369 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4387 ft.4574 ft.NN
SUSSEX4794 ft.4944 ft.NN
SHANNON5355 ft.5529 ft.NN
SHARON SPRINGS7280 ft.NN
NIOBRARA7310 ft.NN
FORT HAYS7940 ft.NN
CODELL8021 ft.NN
CARLILE8370 ft.NN

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 10/24/2024                Interval Top: 9748 ft.    Interval Bottom: 22771 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:5/29/2020Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/24/2024Treatment End Date:N/A
Treatment Summary:FT. Hays Perf Interval: 9748' - 9920'; 13201' - 13405'; 16696' - 17390'; 22759' - 22771'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:9748 ft.# Of Holes:2190
Interval Bottom:22771 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 10/24/2024                Interval Top: 9554 ft.    Interval Bottom: 16695 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:5/29/2020Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/24/2024Treatment End Date:N/A
Treatment Summary:Niobrara Perf Interval: 9554' - 9747'; 12995' - 13200'; 16446' - 16695'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:9554 ft.# Of Holes:2190
Interval Bottom:16695 ft.Hole Size:0.38 in.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 10/24/2024                Interval Top: 8370 ft.    Interval Bottom: 8476 ft.

 Completed Information for Formation CARLILE
1st Production Date:5/29/2020Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/24/2024Treatment End Date:N/A
Treatment Summary:Carlile Perf Interval: 8370' - 8476'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:8370 ft.# Of Holes:2190
Interval Bottom:8476 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 10/24/2024                Interval Top: 8191 ft.    Interval Bottom: 23050 ft.

 Completed Information for Formation CODELL
1st Production Date:5/29/2020Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/24/2024Treatment End Date:N/A
Treatment Summary:Codell Perf Interval: 8191' - 8369'; 8477' - 9553'; 9921' - 12994'; 13406' - 16445'; 17391' - 22758'; 22772' - 23050'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8191 ft.# Of Holes:2190
Interval Bottom:23050 ft.Hole Size:0.38 in.

Formation NFCC                     Formation Classification:  OW                     Status:  PR - 5/31/2020                 Interval Top: 8191 ft.    Interval Bottom: 23050 ft.

 Completed Information for Formation NIOBRARA-FORT HAYS-CODELL-CARLILE
1st Production Date:5/29/2020Choke Size: 
Formation Name:NIOBRARA-FORT HAYS-CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/12/2020Treatment End Date:4/7/2020
Treatment Summary:36 bbls 15% HCL Acid; 755,580# 100 Mesh Sand; 13,515,836 # 20/40 Sand; 266,760 bbls gelled fluid; Flowback determined from well test separator.
Total fluid used in treatment (bbls):266796Max pressure during treatment (psi):4407
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:72
Total acid used in treatment (bbls):36Min frac gradient (psi/ft):0.87
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):47121
Fresh water used in treatment (bbls):266760Disposition method For flowback:DISPOSAL
Total proppant used (lbs):14271416Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7520 ft.
Tubing Packer Depth:7511 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/31/2020Test Method:
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 320
BBLS_OIL 577
BTU_GAS 1500
CALC_BBLS_H2O 320
CALC_BBLS_OIL 577
CALC_GOR 1015
CALC_MCF_GAS 586
GRAVITY_OIL 41
MCF_GAS 586
TUBING_PRESS 1677
Perforation Data:
Interval Top:8191 ft.# Of Holes:2190
Interval Bottom:23050 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)19096
Total Gas Produced (MCF)44327
GOR2321
GOR DeterminationBOE
Average BOE per Day73.085
Average MCFE per Day423.897

 Federal Financial Assurance  i 

 Tribal Well  i No