Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10270
Well Classification: OW Status: PR - 12/17/2022
Well Name/No:B-Farm LD #18-384HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/17/2022
FacilityID:458720LocationID:452914
County:ADAMS #001Location:NENW 7 1S67W 6
Field:WATTENBERG - #90750Elevation:5126 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:934FNL  1743 FWLLat/Long: 39.983792 / -104.934028Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.983792 / -104.934027Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/31/2022
End Date: 11/19/2022
Reported: 1/9/2023
Days to report: 51
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 12/17/2022             Measured TD: 18618 ft.    Vertical TD: 7990 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 12/17/2022
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:11/3/2020
Proposed Top PZ Location:Sec:7 Twp: 1S 67W Footage: 460 FNL  1043 FWL
Bottom Hole Location:Sec:19 Twp: 1S 67W Footage: 25 FNL  1013 FWL
Proposed Depth/Form:18412 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 1080, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1700 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 707, Top: 0 ft., Bottom: 1700 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18412 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1864, Top: 4823 ft., Bottom: 18412 ft.

Wellbore Completed
Completion Date:5/25/2022
Spud Date:4/15/2020Spud Date Is:ACTUAL
Measured TD:18618 ft.Measured PB depth:18613 ft.
True Vertical TD:7990 ft.True Vertical PB depth:7990 ft.
Top PZ Location:Sec:7 Twp: 1S 67WFootage: 460 FNL  1043 FWL
Bottom Hole Location:Sec:19 Twp: 1S 67WFootage: 25 FNL  1013 FWL
Log Types:
Log Types:CBL, MWD, DIL in 05-001-10098
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2037 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 930, Top: 0 ft., Bottom: 2037 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18617 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2005, Top: 3014 ft., Bottom: 18617 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4505 ft.
SUSSEX4884 ft.
SHANNON5985 ft.
SHARON SPRINGS7640 ft.
NIOBRARA7787 ft.
FORT HAYS8393 ft.
CODELL8467 ft.
CARLILE17118 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 9/27/2024                 Interval Top: 17118 ft.    Interval Bottom: 17586 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:9/27/2024Treatment End Date:N/A
Treatment Summary:Completed Depths: 17,118’ – 17,586’
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:17118 ft.# Of Holes:1960
Interval Bottom:17586 ft.Hole Size:0.42 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 9/27/2024                 Interval Top: 9279 ft.    Interval Bottom: 18037 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:9/27/2024Treatment End Date:N/A
Treatment Summary:Completed Depths: 9,279’ – 9,529’, 10,408’ – 10,977’, 17,848’ – 18,037’
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:9279 ft.# Of Holes:1960
Interval Bottom:18037 ft.Hole Size:0.42 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 12/17/2022                Interval Top: 8519 ft.    Interval Bottom: 18420 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:12/10/2022Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:10/31/2022Treatment End Date:11/19/2022
Treatment Summary:55 Stage Plug and Perf Total Fluid: 202,656 bbls Gel Fluid: 129,764 bbls Slickwater Fluid: 72,036 bbls 15% HCl Acid: 856 bbls Total Proppant: 12,076,630 lbs Silica Proppant: 12,076,630 lbs Method for determining flowback: Measuring flowback tank volumes.
Total fluid used in treatment (bbls):202656Max pressure during treatment (psi):4490
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:55
Total acid used in treatment (bbls):856Min frac gradient (psi/ft):0.88
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):10269
Fresh water used in treatment (bbls):201800Disposition method For flowback:DISPOSAL
Total proppant used (lbs):12076630Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8280 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/17/2022Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 629
BBLS_OIL 356
BTU_GAS 1362
CALC_BBLS_H2O 629
CALC_BBLS_OIL 356
CALC_GOR 1315
CALC_MCF_GAS 468
CASING_PRESS 2482
GRAVITY_OIL 45
MCF_GAS 468
TUBING_PRESS 1880
Perforation Data:
Interval Top:8519 ft.# Of Holes:1960
Interval Bottom:18420 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 9/27/2024                 Interval Top: 8519 ft.    Interval Bottom: 18420 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:9/27/2024Treatment End Date:N/A
Treatment Summary:Completed Depths: 8,519’ – 9,279’, 9,529’ – 10,408’, 10,977’ – 17,118’, 17,586’ – 17,848’, 18,037’ – 18,617’
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8519 ft.# Of Holes:1960
Interval Bottom:18420 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)12172
Total Gas Produced (MCF)252117
GOR20712
GOR DeterminationMCFE
Average BOE per Day146.720
Average MCFE per Day850.998

 Federal Financial Assurance  i 

 Tribal Well  i No