Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10223
Well Classification: OW Status: PR - 3/1/2022
Well Name/No:BEF WEST #17
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PETRO OPERATING COMPANY LLC - 10583
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/1/2022
FacilityID:458145LocationID:458074
Municipality/County:BRIGHTON / ADAMS #001Location:SENE 2 1S66W 6
Field:WATTENBERG - #90750Elevation:5048 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2120FNL  321 FELLat/Long: 39.994720 / -104.734700Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.994730 / -104.734700Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/3/2019
End Date: 5/10/2019
Reported: 6/10/2019
Days to report: 31
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 3/1/2022             Measured TD: 12267 ft.    Vertical TD: 7472 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 3/1/2022
Wellbore PermitHORIZONTAL
Permit #:Expiration Date:10/17/2020
Proposed Top PZ Location:Sec:2 Twp: 1S 66W Footage: 1349 FNL  460 FEL
Bottom Hole Location:Sec:2 Twp: 1S 66W Footage: 1336 FNL  460 FWL
Proposed Depth/Form:12055 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-2163 , Unit Acreage: 640, Drill Unit: SEC 2 ALL
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 576, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 12055 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1571, Top: , Bottom: 12055 ft.

Wellbore Completed
Completion Date:1/31/2019
Spud Date:12/24/2018Spud Date Is:ACTUAL
Measured TD:12267 ft.Measured PB depth:12211 ft.
True Vertical TD:7472 ft.True Vertical PB depth:7472 ft.
Top PZ Location:Sec:2 Twp: 1S 66WFootage: 1349 FNL  480 FEL
Bottom Hole Location:Sec:2 Twp: 1S 66WFootage: 1336 FNL  460 FWL
Log Types:MWD/LWD, Mud, CBL, GR in 05-001-10215
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1537 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 420, Top: 0 ft., Bottom: 1537 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 12258 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1470, Top: 2010 ft., Bottom: 12267 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4035 ft.NN
SUSSEX4821 ft.NN
SHANNON5569 ft.NN
SHARON SPRINGS7050 ft.NN
NIOBRARA7350 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 3/1/2022                  Interval Top: 7927 ft.    Interval Bottom: 12147 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:11/6/2019Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/3/2019Treatment End Date:5/10/2019
Treatment Summary:Frac Summary: 23 Stages, 12,868 Gals 28% HCL; 5,796,740 # 40/70 White Sand; 1,531,670 # 100 Mesh; 5,746,734 Gals Slickwater. Total Proppant used 7,328,410 #, During Pumpdown Ave Rate 17.9 bpm, Ave PSI 5224, Max PSI 6350.
Total fluid used in treatment (bbls):213688Max pressure during treatment (psi):6350
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:23
Total acid used in treatment (bbls):306Min frac gradient (psi/ft):0.97
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):9531
Fresh water used in treatment (bbls):213382Disposition method For flowback:DISPOSAL
Total proppant used (lbs):7328410Green completions techniques utilized:No
Reason green techniques Not utilized: PIPELINE
Tubing Size:2.375 in.Tubing Setting Depth:7554 ft.
Tubing Packer Depth:7194 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/7/2019Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:FLARED
Test TypeMeasure
BBLS_H2O 359
BBLS_OIL 355
BTU_GAS 1245
CALC_BBLS_H2O 359
CALC_BBLS_OIL 355
CALC_GOR 865
CALC_MCF_GAS 307
CASING_PRESS 2750
GRAVITY_OIL 41
MCF_GAS 307
TUBING_PRESS 1725
Perforation Data:
Interval Top:7927 ft.# Of Holes:828
Interval Bottom:12147 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)6332
Total Gas Produced (MCF)62053
GOR9799
GOR DeterminationBOE
Average BOE per Day46.634
Average MCFE per Day270.490

 Federal Financial Assurance  i 

 Tribal Well  i No