Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10159
Well Classification: OW Status: PR - 7/1/2021
Well Name/No:Duck Club #12W-20-5C
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/1/2021
FacilityID:456111LocationID:456114
County:ADAMS #001Location:NWSW 12 1S66W 6
Field:WATTENBERG - #90750Elevation:5037 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2491FSL  690 FWLLat/Long: 39.979140 / -104.730950Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.979141 / -104.730945Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/5/2019
End Date: 2/17/2019
Reported: 3/19/2019
Days to report: 30
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 7/1/2021             Measured TD: 17921 ft.    Vertical TD: 7648 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 7/1/2021
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:7/21/2020
Proposed Top PZ Location:Sec:12 Twp: 1S 66W Footage: 2060 FNL  2173 FWL
Bottom Hole Location:Sec:10 Twp: 1S 66W Footage: 1960 FNL  2179 FEL
Proposed Depth/Form:17914 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-2422 , Unit Acreage: 1280, Drill Unit: Sec 10,11&12
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17914 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2392, Top: 1500 ft., Bottom: 17914 ft.

Wellbore Completed
Completion Date:12/17/2018
Spud Date:11/7/2018Spud Date Is:ACTUAL
Measured TD:17921 ft.Measured PB depth:17915 ft.
True Vertical TD:7648 ft.True Vertical PB depth:7648 ft.
Top PZ Location:Sec:12 Twp: 1S 66WFootage: 2059 FNL  2148 FWL
Bottom Hole Location:Sec:10 Twp: 1S 66WFootage: 2034 FNL  2126 FEL
Log Types:CBL, Mud, MWD/LWD, (Resistivity on 001-10158).
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1615 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 525, Top: 0 ft., Bottom: 1615 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17918 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2830, Top: 105 ft., Bottom: 17921 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX5078 ft.NN
SHARON SPRINGS7652 ft.NN
NIOBRARA7676 ft.NN
FORT HAYS8305 ft.NN
CODELL8472 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 6/11/2019                 Interval Top: 8493 ft.    Interval Bottom: 17866 ft.

 Completed Information for Formation CODELL
1st Production Date:4/28/2019Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/5/2019Treatment End Date:2/17/2019
Treatment Summary:Perforated Intervals: 8493'-12372'; 12655'-17866'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8493 ft.# Of Holes:1084
Interval Bottom:17866 ft.Hole Size:0.52 in.

Formation CD-FH                   Formation Classification:  OW                   Status:  PR - 7/1/2021                  Interval Top: 8372 ft.    Interval Bottom: 17866 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:4/28/2019Choke Size: 
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/5/2019Treatment End Date:2/17/2019
Treatment Summary:Frac'd Codell-Fort Hays with 48-stage plug-and-perf; 151339 total bbls fluid pumped: 131645 bbls gelled fluid, 19682 bbls fresh water, and 12 bbls 28% HCL acid; 9551910 total lbs proppant pumped: all 30/50 mesh sand.
Total fluid used in treatment (bbls):151339Max pressure during treatment (psi):8593
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:48
Total acid used in treatment (bbls):12Min frac gradient (psi/ft):0.83
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):14694
Fresh water used in treatment (bbls):19682Disposition method For flowback:DISPOSAL
Total proppant used (lbs):9551910Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8184 ft.
Tubing Packer Depth:8170 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/6/2019Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 545
BBLS_OIL 720
BTU_GAS 1350
CALC_BBLS_H2O 545
CALC_BBLS_OIL 720
CALC_GOR 1190
CALC_MCF_GAS 857
CASING_PRESS 629
GRAVITY_OIL 41
MCF_GAS 857
TUBING_PRESS 1323
Perforation Data:
Interval Top:8372 ft.# Of Holes:1129
Interval Bottom:17866 ft.Hole Size:0.52 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 6/11/2019                 Interval Top: 8372 ft.    Interval Bottom: 12632 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:4/28/2019Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/5/2019Treatment End Date:2/17/2019
Treatment Summary:Perforated Intervals: 8372'-8468'; 12406'-12632'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8372 ft.# Of Holes:45
Interval Bottom:12632 ft.Hole Size:0.52 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)7547
Total Gas Produced (MCF)35176
GOR4660
GOR DeterminationBOE
Average BOE per Day37.337
Average MCFE per Day216.549

 Federal Financial Assurance  i 

 Tribal Well  i No