Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10132
Well Classification: OW Status: PR - 10/18/2018
Well Name/No:Sharp #2635-1-15HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/18/2018
FacilityID:454230LocationID:436062
County:ADAMS #001Location:SWSW 24 1S67W 6
Field:WATTENBERG - #90750Elevation:5019 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:265FSL  190 FWLLat/Long: 39.944073 / -104.846046Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.944072 / -104.846047Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/25/2018
End Date: 10/2/2018
Reported: 10/16/2018
Days to report: 14
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 10/18/2018             Measured TD: 18461 ft.    Vertical TD: 7833 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 10/18/2018
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/5/2020
Proposed Top PZ Location:Sec:26 Twp: 1S 67W Footage: 534 FNL  2569 FWL
Bottom Hole Location:Sec:35 Twp: 1S 67W Footage: 851 FSL  2602 FWL
Proposed Depth/Form:17999 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-2307  , Unit Acreage: 1280, Drill Unit: S. 26 & 35: All
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1700 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 707, Top: 0 ft., Bottom: 1700 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18166 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1802, Top: 5024 ft., Bottom: 18166 ft.

Wellbore Completed
Completion Date:9/18/2018
Spud Date:7/28/2018Spud Date Is:ACTUAL
Measured TD:18461 ft.Measured PB depth:18452 ft.
True Vertical TD:7833 ft.True Vertical PB depth:7833 ft.
Top PZ Location:Sec:26 Twp: 1S 67WFootage: 534 FNL  2569 FWL
Bottom Hole Location:Sec:35 Twp: 1S 67WFootage: 851 FSL  2602 FWL
Log Types:CBL, Mud Log, MWD/LWD, (IND in 001-09801)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1740 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 760, Top: 0 ft., Bottom: 1740 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18461 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1990, Top: 3408 ft., Bottom: 18461 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3613 ft.3814 ft.NN
SUSSEX5175 ft.5289 ft.NN
SHANNON5966 ft.6221 ft.NN
SHARON SPRINGS7866 ft.NN
NIOBRARA8069 ft.NN
FORT HAYS8705 ft.NN
CODELL8851 ft.NN
CARLILE11807 ft.NN

Formation CARL                     Formation Classification:  OW                     Status:  CM - 7/15/2019                 Interval Top: 11807 ft.    Interval Bottom: 12006 ft.

 Completed Information for Formation CARLILE
1st Production Date:10/15/2018Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:7/15/2019Treatment End Date:N/A
Treatment Summary:Carlile Perf Interval: 11807' - 12006'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:11807 ft.# Of Holes:1380
Interval Bottom:12006 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 7/15/2019                 Interval Top: 11557 ft.    Interval Bottom: 11806 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/15/2018Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:7/15/2019Treatment End Date:N/A
Treatment Summary:Niobrara Perf Interval: 11557' - 11806'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:11557 ft.# Of Holes:1380
Interval Bottom:11806 ft.Hole Size:0.38 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 7/15/2019                 Interval Top: 11262 ft.    Interval Bottom: 11556 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:10/15/2018Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:7/15/2019Treatment End Date:N/A
Treatment Summary:Fort Hays Perf Interval: 11262' - 11556'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:11262 ft.# Of Holes:1380
Interval Bottom:11556 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 7/15/2019                 Interval Top: 9264 ft.    Interval Bottom: 18386 ft.

 Completed Information for Formation CODELL
1st Production Date:10/15/2018Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:7/15/2019Treatment End Date:N/A
Treatment Summary:Codell Perf Intervals: 9264' - 11261', 12007' - 18386'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:9264 ft.# Of Holes:1380
Interval Bottom:18386 ft.Hole Size:0.38 in.

Formation NFCC                     Formation Classification:  OW                     Status:  PR - 10/18/2018                Interval Top: 9264 ft.    Interval Bottom: 18386 ft.

 Completed Information for Formation NIOBRARA-FORT HAYS-CODELL-CARLILE
1st Production Date:10/15/2018Choke Size: 
Formation Name:NIOBRARA-FORT HAYS-CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/25/2018Treatment End Date:10/2/2018
Treatment Summary:459,223 lbs 100 Mesh Sand; 8,466,229 lbs 20/40 Sand; 48 bbls 15% HCL Acid; 180,553 bbls Gelled Fluid. Flowback determined from well test separator
Total fluid used in treatment (bbls):180601Max pressure during treatment (psi):5145
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:46
Total acid used in treatment (bbls):48Min frac gradient (psi/ft):0.88
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):16946
Fresh water used in treatment (bbls):180553Disposition method For flowback:DISPOSAL
Total proppant used (lbs):8925452Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8514 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/18/2018Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 504
BBLS_OIL 370
BTU_GAS 1398
CALC_BBLS_H2O 504
CALC_BBLS_OIL 370
CALC_GOR 1062
CALC_MCF_GAS 393
CASING_PRESS 2385
GRAVITY_OIL 46
MCF_GAS 393
TUBING_PRESS 1803
Perforation Data:
Interval Top:9264 ft.# Of Holes:1380
Interval Bottom:18386 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)17346
Total Gas Produced (MCF)90923
GOR5241
GOR DeterminationBOE
Average BOE per Day92.124
Average MCFE per Day534.297

 Federal Financial Assurance  i 

 Tribal Well  i No