Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10106
Well Classification: OW Status: TA - 12/12/2023
Well Name/No:Edmundson LE #33-082HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:TAStatus Date12/12/2023
FacilityID:453937LocationID:453934
County:ADAMS #001Location:SESE 30 1S66W 6
Field:WATTENBERG - #90750Elevation:5059 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:365FSL  344 FELLat/Long: 39.929872 / -104.810153Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.929875 / -104.810154Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/5/2021
End Date: 8/9/2021
Reported: 8/18/2021
Days to report: 9
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: TA - 12/12/2023             Measured TD: 18443 ft.    Vertical TD: 7713 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        TA - 12/12/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:1/9/2023
Proposed Top PZ Location:Sec:32 Twp: 1S 66W Footage: 1139 FNL  460 FWL
Bottom Hole Location:Sec:33 Twp: 1S 66W Footage: 1114 FNL  295 FEL
Proposed Depth/Form:18186 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CARL , Formation: CARLILE , Order: 407-3469 , Unit Acreage: 1280, Drill Unit: Secs. 32 & 33: All
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-3469 , Unit Acreage: 1280, Drill Unit: Secs. 32 & 33: All
Formation And Spacing:Code: FTHYS , Formation: FORT HAYS , Order: 407-3469 , Unit Acreage: 1280, Drill Unit: Secs. 32 & 33: All
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-3469 , Unit Acreage: 1280, Drill Unit: Secs. 32 & 33: All
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 624, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18186 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1849, Top: , Bottom: 18186 ft.

Wellbore Completed
Completion Date:6/2/2021
Spud Date:4/8/2021Spud Date Is:ACTUAL
Measured TD:18443 ft.Measured PB depth:18438 ft.
True Vertical TD:7713 ft.True Vertical PB depth:7713 ft.
Top PZ Location:Sec:32 Twp: 1S 66WFootage: 1139 FNL  460 FWL
Bottom Hole Location:Sec:33 Twp: 1S 66WFootage: 1114 FNL  295 FEL
Log Types:Mud log, MWD/LWD, CBL, Composite
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2031 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 1010, Top: 0 ft., Bottom: 2031 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18443 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2420, Top: 4166 ft., Bottom: 18443 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4424 ft.4582 ft.NN
SUSSEX4970 ft.5140 ft.NN
SHANNON6304 ft.6474 ft.NN
SHARON SPRINGS7333 ft.NN
NIOBRARA7690 ft.NN
FORT HAYS8402 ft.NN
CODELL8489 ft.NN
CARLILE8563 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 10/8/2024                 Interval Top: 9080 ft.    Interval Bottom: 18215 ft.

 Completed Information for Formation CODELL
1st Production Date:8/31/2021Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/8/2024Treatment End Date:N/A
Treatment Summary:Codell perf intervals: 9080-15646, 16153-16242, 16606-18215
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:9080 ft.# Of Holes:1152
Interval Bottom:18215 ft.Hole Size:0.38 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 10/8/2024                 Interval Top: 8825 ft.    Interval Bottom: 16605 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:8/31/2021Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/8/2024Treatment End Date:N/A
Treatment Summary:Fort Hays perf intervals: 8825-9079, 16243-16605
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8825 ft.# Of Holes:1152
Interval Bottom:16605 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 10/8/2024                 Interval Top: 8791 ft.    Interval Bottom: 8824 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/31/2021Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:8791 ft.# Of Holes:1152
Interval Bottom:8824 ft.Hole Size:0.38 in.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 10/8/2024                 Interval Top: 8688 ft.    Interval Bottom: 16152 ft.

 Completed Information for Formation CARLILE
1st Production Date:8/31/2021Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/8/2024Treatment End Date:N/A
Treatment Summary:Carlile perf intervals: 8688-8790; 15647-16152
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:8688 ft.# Of Holes:1152
Interval Bottom:16152 ft.Hole Size:0.38 in.

Formation NFCC                     Formation Classification:  OW                     Status:  TA - 12/12/2023                Interval Top: 8688 ft.    Interval Bottom: 18215 ft.

 Completed Information for Formation NIOBRARA-FORT HAYS-CODELL-CARLILE
1st Production Date:8/31/2021Choke Size: 
Formation Name:NIOBRARA-FORT HAYS-CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:8/5/2021Treatment End Date:8/9/2021
Treatment Summary:548 bbls 15% HCL Acid; 327,813 # 100 Mesh Sand; 4,473,407 # 20/40 Sand; 122,288 bbls gelled fluid; Flowback determined from well test separator.
Total fluid used in treatment (bbls):122836Max pressure during treatment (psi):4131
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:48
Total acid used in treatment (bbls):548Min frac gradient (psi/ft):0.85
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):15336
Fresh water used in treatment (bbls):122288Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4801220Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 409
BBLS_OIL 376
BTU_GAS 1560
CALC_BBLS_H2O 409
CALC_BBLS_OIL 376
CALC_GOR 1157
CALC_MCF_GAS 435
CASING_PRESS 1769
GRAVITY_OIL 42
MCF_GAS 435
TUBING_PRESS 1327
Perforation Data:
Interval Top:8688 ft.# Of Holes:
Interval Bottom:18215 ft.Hole Size:0.38 in.
Primary Well Designation:
Noticed Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveYNoticed Date
08/22/2024
Defined Inactive (TA )YDefined Inactive
10/31/2023
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No