Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10098
Well Classification: OW Status: PR - 12/1/2022
Well Name/No:B-Farm LD #18-034HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/1/2022
FacilityID:452920LocationID:452914
County:ADAMS #001Location:NENW 7 1S67W 6
Field:WATTENBERG - #90750Elevation:5126 ft.
Planned Location:924FNL  1843 FWLLat/Long: 39.983819 / -104.933672Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.983821 / -104.933671Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/10/2018
End Date: 3/19/2018
Reported: 4/3/2018
Days to report: 15
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 12/1/2022             Measured TD: 13833 ft.    Vertical TD: 7968 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 12/1/2022
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:11/5/2019
Proposed Top PZ Location:Sec:7 Twp: 1S 67W Footage: 590 FNL  1541 FEL
Bottom Hole Location:Sec:18 Twp: 1S 67W Footage: 355 FNL  1541 FEL
Proposed Depth/Form:13799 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 400, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1700 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 707, Top: 0 ft., Bottom: 1700 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 13799 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1674, Top: 0 ft., Bottom: 13799 ft.

Wellbore Completed
Completion Date:1/15/2018
Spud Date:12/31/2017Spud Date Is:ACTUAL
Measured TD:13833 ft.Measured PB depth:13825 ft.
True Vertical TD:7968 ft.True Vertical PB depth:7968 ft.
Top PZ Location:Sec:7 Twp: 1S 67WFootage: 590 FNL  1541 FEL
Bottom Hole Location:Sec:18 Twp: 1S 67WFootage: 355 N  1541 E
Log Types:CBL, Mud Log, MWD/LWD, Composite
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1718 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 760, Top: 0 ft., Bottom: 1718 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 13833 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 2307, Top: 210 ft., Bottom: 13833 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3536 ft.3707 ft.NN
SUSSEX4974 ft.5241 ft.NN
SHANNON6168 ft.6427 ft.NN
SHARON SPRINGS7780 ft.NN
NIOBRARA7976 ft.NN
FORT HAYS8553 ft.NN
CODELL8650 ft.NN
CARLILE8828 ft.NN

Formation CARL                     Formation Classification:  OW                     Status:  CM - 2/10/2020                 Interval Top: 8828 ft.    Interval Bottom: 13752 ft.

 Completed Information for Formation CARLILE
1st Production Date:4/11/2018Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:2/10/2020Treatment End Date:N/A
Treatment Summary:Carlile Perf Interval: 8828' - 8993', 12904' - 13269, 13580' - 13752'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:8828 ft.# Of Holes:750
Interval Bottom:13752 ft.Hole Size:0.38 in.

Formation CD-CRL                 Formation Classification:  OW                 Status:  PR - 12/1/2022                 Interval Top: 8800 ft.    Interval Bottom: 13752 ft.

 Completed Information for Formation CODELL-CARLILE
1st Production Date:4/11/2018Choke Size: 
Formation Name:CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/10/2018Treatment End Date:3/19/2018
Treatment Summary:271,255 lbs 100 Mesh Sand; 4,679,418 lbs 20/40 Sand; 83,743 bbls Gelled Fluid. Flowback determined from well test separator
Total fluid used in treatment (bbls):83743Max pressure during treatment (psi):4097
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:25
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.86
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):8013
Fresh water used in treatment (bbls):83743Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4950673Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.875 in.Tubing Setting Depth:8423 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/13/2018Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 315
BBLS_OIL 391
BTU_GAS 1362
CALC_BBLS_H2O 315
CALC_BBLS_OIL 391
CALC_GOR 2028
CALC_MCF_GAS 793
CASING_PRESS 2300
GRAVITY_OIL 45
MCF_GAS 793
TUBING_PRESS 1750
Perforation Data:
Interval Top:8800 ft.# Of Holes:750
Interval Bottom:13752 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 2/10/2020                 Interval Top: 8800 ft.    Interval Bottom: 13579 ft.

 Completed Information for Formation CODELL
1st Production Date:4/11/2018Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:2/10/2020Treatment End Date:N/A
Treatment Summary:Codell Perf Interval: 8800' - 8827', 8994' - 12903', 13270 - 13579'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8800 ft.# Of Holes:750
Interval Bottom:13579 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)2239
Total Gas Produced (MCF)53277
GOR23794
GOR DeterminationMCFE
Average BOE per Day31.222
Average MCFE per Day181.094

 Federal Financial Assurance  i 

 Tribal Well  i No