Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10090
Well Classification: OW Status: PR - 11/1/2023
Well Name/No:B-Farm LD #18-039HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/1/2023
FacilityID:452909LocationID:452914
County:ADAMS #001Location:NENW 7 1S67W 6
Field:WATTENBERG - #90750Elevation:5124 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:864FNL  1842 FWLLat/Long: 39.983983 / -104.933672Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.983981 / -104.933670Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/10/2018
End Date: 3/18/2018
Reported: 4/3/2018
Days to report: 16
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 11/1/2023             Measured TD: 14190 ft.    Vertical TD: 7971 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 11/1/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:11/4/2019
Proposed Top PZ Location:Sec:7 Twp: 1S 67W Footage: 592 FNL  493 FEL
Bottom Hole Location:Sec:18 Twp: 1S 67W Footage: 409 FNL  477 FEL
Proposed Depth/Form:14064 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 400, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1700 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 707, Top: 0 ft., Bottom: 1700 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 14064 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1700, Top: 0 ft., Bottom: 14064 ft.

Wellbore Completed
Completion Date:2/4/2018
Spud Date:12/29/2017Spud Date Is:ACTUAL
Measured TD:14190 ft.Measured PB depth:14182 ft.
True Vertical TD:7971 ft.True Vertical PB depth:7970 ft.
Top PZ Location:Sec:7 Twp: 1S 67WFootage: 592 FNL  493 FEL
Bottom Hole Location:Sec:18 Twp: 1S 67WFootage: 409 FNL  477 FEL
Log Types:CBL, Mud Log, MWD/LWD, (Composite 001-10098)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1712 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 760, Top: 0 ft., Bottom: 1712 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 14190 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 2374, Top: 2370 ft., Bottom: 14190 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3626 ft.3822 ft.NN
SUSSEX5176 ft.5450 ft.NN
SHANNON6425 ft.6681 ft.NN
SHARON SPRINGS8074 ft.NN
NIOBRARA8193 ft.NN
FORT HAYS8907 ft.NN
CODELL9480 ft.NN
CARLILE10837 ft.NN

Formation CARL                     Formation Classification:  OW                     Status:  CM - 2/10/2020                 Interval Top: 10837 ft.    Interval Bottom: 10963 ft.

 Completed Information for Formation CARLILE
1st Production Date:4/11/2018Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:2/10/2020Treatment End Date:N/A
Treatment Summary:Carlile Perf Interval: 10837' - 10963'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:10837 ft.# Of Holes:750
Interval Bottom:10963 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 2/10/2020                 Interval Top: 9480 ft.    Interval Bottom: 14051 ft.

 Completed Information for Formation CODELL
1st Production Date:4/11/2018Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:2/10/2020Treatment End Date:N/A
Treatment Summary:Codell Perf Interval: 9480' - 10836', 10964' - 14051'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:9480 ft.# Of Holes:750
Interval Bottom:14051 ft.Hole Size:0.38 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 11/1/2023                 Interval Top: 9099 ft.    Interval Bottom: 14051 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:4/11/2018Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/10/2018Treatment End Date:3/18/2018
Treatment Summary:274,244 lbs 100 Mesh Sand; 4,754,241 lbs 20/40 Sand; 84,916 bbls Gelled Fluid. Flowback determined from well test separator
Total fluid used in treatment (bbls):84916Max pressure during treatment (psi):4506
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:25
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.87
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):11988
Fresh water used in treatment (bbls):84916Disposition method For flowback:DISPOSAL
Total proppant used (lbs):5028485Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.875 in.Tubing Setting Depth:8662 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/12/2018Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 252
BBLS_OIL 433
BTU_GAS 1362
CALC_BBLS_H2O 252
CALC_BBLS_OIL 433
CALC_GOR 1473
CALC_MCF_GAS 638
CASING_PRESS 1900
GRAVITY_OIL 45
MCF_GAS 638
TUBING_PRESS 1550
Perforation Data:
Interval Top:9099 ft.# Of Holes:750
Interval Bottom:14051 ft.Hole Size:0.38 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 2/10/2020                 Interval Top: 9099 ft.    Interval Bottom: 9479 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:4/11/2018Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:2/10/2020Treatment End Date:N/A
Treatment Summary:Fort Hays Perf Interval: 9099' - 9479'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:9099 ft.# Of Holes:750
Interval Bottom:9479 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)1426
Total Gas Produced (MCF)9805
GOR6875
GOR DeterminationBOE
Average BOE per Day8.882
Average MCFE per Day51.513

 Federal Financial Assurance  i 

 Tribal Well  i No