Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10090
Well Classification: OW Status: PR - 11/1/2023
Well Name/No:B-Farm LD #18-039HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/1/2023
FacilityID:452909LocationID:452914
County:ADAMS #001Location:NENW 7 1S67W 6
Field:WATTENBERG - #90750Elevation:5124 ft.
Planned Location:864FNL  1842 FWLLat/Long: 39.983983 / -104.933672Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.983981 / -104.933670Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/10/2018
End Date: 3/18/2018
Reported: 4/3/2018
Days to report: 16
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 11/1/2023             Measured TD: 14190 ft.    Vertical TD: 7971 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 11/1/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:11/4/2019
Proposed Top PZ Location:Sec:7 Twp: 1S 67W Footage: 592 FNL  493 FEL
Bottom Hole Location:Sec:18 Twp: 1S 67W Footage: 409 FNL  477 FEL
Proposed Depth/Form:14064 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 400, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1700 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 707, Top: 0 ft., Bottom: 1700 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 14064 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1700, Top: 0 ft., Bottom: 14064 ft.

Wellbore Completed
Completion Date:2/4/2018
Spud Date:12/29/2017Spud Date Is:ACTUAL
Measured TD:14190 ft.Measured PB depth:14182 ft.
True Vertical TD:7971 ft.True Vertical PB depth:7970 ft.
Top PZ Location:Sec:7 Twp: 1S 67WFootage: 592 FNL  493 FEL
Bottom Hole Location:Sec:18 Twp: 1S 67WFootage: 409 FNL  477 FEL
Log Types:CBL, Mud Log, MWD/LWD, (Composite 001-10098)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1712 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 760, Top: 0 ft., Bottom: 1712 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 14190 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 2374, Top: 2370 ft., Bottom: 14190 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3626 ft.3822 ft.NN
SUSSEX5176 ft.5450 ft.NN
SHANNON6425 ft.6681 ft.NN
SHARON SPRINGS8074 ft.NN
NIOBRARA8193 ft.NN
FORT HAYS8907 ft.NN
CODELL9480 ft.NN
CARLILE10837 ft.NN

Formation CARL                     Formation Classification:  OW                     Status:  CM - 2/10/2020                 Interval Top: 10837 ft.    Interval Bottom: 10963 ft.

 Completed Information for Formation CARLILE
1st Production Date:4/11/2018Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:2/10/2020Treatment End Date:N/A
Treatment Summary:Carlile Perf Interval: 10837' - 10963'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:10837 ft.# Of Holes:750
Interval Bottom:10963 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 2/10/2020                 Interval Top: 9480 ft.    Interval Bottom: 14051 ft.

 Completed Information for Formation CODELL
1st Production Date:4/11/2018Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:2/10/2020Treatment End Date:N/A
Treatment Summary:Codell Perf Interval: 9480' - 10836', 10964' - 14051'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:9480 ft.# Of Holes:750
Interval Bottom:14051 ft.Hole Size:0.38 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 11/1/2023                 Interval Top: 9099 ft.    Interval Bottom: 14051 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:4/11/2018Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/10/2018Treatment End Date:3/18/2018
Treatment Summary:274,244 lbs 100 Mesh Sand; 4,754,241 lbs 20/40 Sand; 84,916 bbls Gelled Fluid. Flowback determined from well test separator
Total fluid used in treatment (bbls):84916Max pressure during treatment (psi):4506
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:25
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.87
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):11988
Fresh water used in treatment (bbls):84916Disposition method For flowback:DISPOSAL
Total proppant used (lbs):5028485Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.875 in.Tubing Setting Depth:8662 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/12/2018Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 252
BBLS_OIL 433
BTU_GAS 1362
CALC_BBLS_H2O 252
CALC_BBLS_OIL 433
CALC_GOR 1473
CALC_MCF_GAS 638
CASING_PRESS 1900
GRAVITY_OIL 45
MCF_GAS 638
TUBING_PRESS 1550
Perforation Data:
Interval Top:9099 ft.# Of Holes:750
Interval Bottom:14051 ft.Hole Size:0.38 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 2/10/2020                 Interval Top: 9099 ft.    Interval Bottom: 9479 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:4/11/2018Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:2/10/2020Treatment End Date:N/A
Treatment Summary:Fort Hays Perf Interval: 9099' - 9479'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:9099 ft.# Of Holes:750
Interval Bottom:9479 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
April 2024 - March 2025i
Total Oil Produced (Barrels)1637
Total Gas Produced (MCF)7393
GOR4516
GOR DeterminationBOE
Average BOE per Day7.957
Average MCFE per Day46.147

 Federal Financial Assurance  i 

 Tribal Well  i No