Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10088
Well Classification: OW Status: PR - 2/21/2022
Well Name/No:Brighton Lakes #20-17-3NBH
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:DUNAMIS ENERGY OPERATING LLC - 10848
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/21/2022
FacilityID:451644LocationID:451646
Municipality/County:BRIGHTON / ADAMS #001Location:SESW 20 1S66W 6
Field:DJ HORIZONTAL NIOBRARA - #16950Elevation:5047 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:400FSL  1964 FWLLat/Long: 39.944420 / -104.801820Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.944420 / -104.801820Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/28/2021
End Date: 12/12/2021
Reported: 7/7/2022
Days to report: 207
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 2/21/2022             Measured TD: 18080 ft.    Vertical TD: 7480 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 2/21/2022
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:8/4/2019
Proposed Top PZ Location:Sec:20 Twp: 1S 66W Footage: 460 FSL  759 FEL
Bottom Hole Location:Sec:17 Twp: 1S 66W Footage: 460 FNL  759 FEL
Proposed Depth/Form:17935 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-1879 , Unit Acreage: 640, Drill Unit: S. 17:E2; S.20:E2
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1800 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 620, Top: 0 ft., Bottom: 1800 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 17935 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 3585, Top: , Bottom: 17935 ft.

Wellbore Completed
Completion Date:10/22/2021
Spud Date:7/20/2019Spud Date Is:ACTUAL
Measured TD:18080 ft.Measured PB depth:17995 ft.
True Vertical TD:7480 ft.True Vertical PB depth:7479 ft.
Top PZ Location:Sec:20 Twp: 1S 66WFootage: 460 FSL  747 FEL
Bottom Hole Location:Sec:17 Twp: 1S 66WFootage: 435 FNL  787 FEL
Log Types:
Log Types:CBL, Mud Log, MWD/LWD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1869 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 455, Top: 0 ft., Bottom: 1869 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18067 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2340, Top: 1020 ft., Bottom: 18080 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN5169 ft.5254 ft.
SUSSEX5254 ft.5332 ft.
SHANNON5332 ft.7850 ft.
SHARON SPRINGS7850 ft.7898 ft.NN
NIOBRARA7898 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 2/21/2022                 Interval Top: 8464 ft.    Interval Bottom: 17969 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:2/21/2022Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:11/28/2021Treatment End Date:12/17/2021
Treatment Summary:53 Stage Plug and Perf: 349,039 bbls slick water, 1,274 bbls 15% HCl acid, 12,449,477 lbs 40/70 White, 537,680 lbs 100 Mesh
Total fluid used in treatment (bbls):350313Max pressure during treatment (psi):6763
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.40
Type Of gas:Number Of staged intervals:53
Total acid used in treatment (bbls):1274Min frac gradient (psi/ft):0.92
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):9175
Fresh water used in treatment (bbls):349039Disposition method For flowback:DISPOSAL
Total proppant used (lbs):12987157Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7488 ft.
Tubing Packer Depth:7488 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/21/2022Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 499
BBLS_OIL 202
BTU_GAS 1555
CALC_BBLS_H2O 499
CALC_BBLS_OIL 202
CALC_GOR 1124
CALC_MCF_GAS 227
GRAVITY_OIL 45
MCF_GAS 227
TUBING_PRESS 1664
Perforation Data:
Interval Top:8464 ft.# Of Holes:1908
Interval Bottom:17969 ft.Hole Size:0.43 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)11727
Total Gas Produced (MCF)40089
GOR3418
GOR DeterminationBOE
Average BOE per Day50.686
Average MCFE per Day293.978

 Federal Financial Assurance  i 

 Tribal Well  i No