Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10077
Well Classification: OW Status: PR - 8/26/2021
Well Name/No:Prairie LE #17-022HN
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/26/2021
FacilityID:451563LocationID:450942
Municipality/County:BRIGHTON / ADAMS #001Location:SWSW 20 1S66W 6
Field:WATTENBERG - #90750Elevation:5047 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:477FSL  1302 FWLLat/Long: 39.944638 / -104.804184Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.944638 / -104.804183Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/24/2021
End Date: 7/12/2021
Reported: 7/27/2021
Days to report: 15
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 8/26/2021             Measured TD: 17987 ft.    Vertical TD: 7477 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 8/26/2021
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:1/9/2023
Proposed Top PZ Location:Sec:20 Twp: 1S 66W Footage: 460 FSL  380 FWL
Bottom Hole Location:Sec:17 Twp: 1S 66W Footage: 370 FNL  380 FWL
Proposed Depth/Form:18114 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 640, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1700 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 717, Top: 0 ft., Bottom: 1700 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18114 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 2288, Top: , Bottom: 18114 ft.

Wellbore Completed
Completion Date:4/11/2021
Spud Date:2/8/2021Spud Date Is:ACTUAL
Measured TD:17987 ft.Measured PB depth:17982 ft.
True Vertical TD:7477 ft.True Vertical PB depth:7478 ft.
Top PZ Location:Sec:20 Twp: 1S 66WFootage: 532 FSL  375 FWL
Bottom Hole Location:Sec:17 Twp: 1S 66WFootage: 292 FNL  395 FWL
Log Types:Mud log, MWD/LWD, CBL (Composite in 001-10066)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2037 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 1000, Top: 0 ft., Bottom: 2037 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17987 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2350, Top: 3804 ft., Bottom: 17987 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4518 ft.4688 ft.NN
SUSSEX4930 ft.5109 ft.NN
SHANNON5668 ft.5853 ft.NN
SHARON SPRINGS7210 ft.NN
NIOBRARA7635 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 8/26/2021                 Interval Top: 8255 ft.    Interval Bottom: 17756 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/23/2021Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:6/24/2021Treatment End Date:7/12/2021
Treatment Summary:1845 bbls 15% HCL Acid; 577,032 # 100 Mesh Sand; 6,560,768 # 20/40 Sand; 181,367 bbls Gelled Fluid; Flowback determind from well test separator
Total fluid used in treatment (bbls):183212Max pressure during treatment (psi):4526
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:48
Total acid used in treatment (bbls):1845Min frac gradient (psi/ft):0.87
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):29503
Fresh water used in treatment (bbls):181367Disposition method For flowback:DISPOSAL
Total proppant used (lbs):7137800Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7824 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/26/2021Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 561
BBLS_OIL 354
BTU_GAS 1542
CALC_BBLS_H2O 561
CALC_BBLS_OIL 354
CALC_GOR 1073
CALC_MCF_GAS 380
CASING_PRESS 1894
GRAVITY_OIL 43
MCF_GAS 380
TUBING_PRESS 1308
Perforation Data:
Interval Top:8255 ft.# Of Holes:960
Interval Bottom:17756 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)7162
Total Gas Produced (MCF)66611
GOR9300
GOR DeterminationBOE
Average BOE per Day51.152
Average MCFE per Day296.688

 Federal Financial Assurance  i 

 Tribal Well  i No