Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10070
Well Classification: OW Status: PR - 9/2/2021
Well Name/No:Prairie LE #17-018HNX
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/2/2021
FacilityID:450941LocationID:450942
Municipality/County:BRIGHTON / ADAMS #001Location:SESW 20 1S66W 6
Field:WATTENBERG - #90750Elevation:5047 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:477FSL  1332 FWLLat/Long: 39.944638 / -104.804077Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.944638 / -104.804076Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/24/2021
End Date: 7/12/2021
Reported: 7/27/2021
Days to report: 15
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 9/2/2021             Measured TD: 17780 ft.    Vertical TD: 7366 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 9/2/2021
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:1/9/2023
Proposed Top PZ Location:Sec:20 Twp: 1S 66W Footage: 538 FSL  746 FWL
Bottom Hole Location:Sec:17 Twp: 1S 66W Footage: 295 FNL  750 FWL
Proposed Depth/Form:18134 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-2901 , Unit Acreage: 640, Drill Unit: Sec 17, 20 W 1/2
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1700 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 717, Top: 0 ft., Bottom: 1700 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18134 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 2286, Top: , Bottom: 18134 ft.

Wellbore Completed
Completion Date:5/7/2021
Spud Date:2/10/2021Spud Date Is:ACTUAL
Measured TD:17780 ft.Measured PB depth:17775 ft.
True Vertical TD:7366 ft.True Vertical PB depth:7366 ft.
Top PZ Location:Sec:20 Twp: 1S 66WFootage: 538 FSL  746 FWL
Bottom Hole Location:Sec:17 Twp: 1S 66WFootage: 295 FNL  750 FWL
Log Types:Mud log, MWD/LWD, CBL (Composite in 001-10066)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2024 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 1000, Top: 0 ft., Bottom: 2024 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17780 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2350, Top: 3630 ft., Bottom: 17780 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4504 ft.4682 ft.NN
SUSSEX4925 ft.5106 ft.NN
SHANNON5646 ft.5813 ft.NN
SHARON SPRINGS7158 ft.NN
NIOBRARA7615 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 9/2/2021                  Interval Top: 8051 ft.    Interval Bottom: 17552 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/30/2021Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:6/24/2021Treatment End Date:7/12/2021
Treatment Summary:1917 bbls 15% HCL Acid; 573,357 # 100 Mesh Sand; 6,586,660 # 20/40 Sand; 181,989 bbls Gelled Fluid; Flowback determind from well test separator
Total fluid used in treatment (bbls):183906Max pressure during treatment (psi):6896
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:48
Total acid used in treatment (bbls):1917Min frac gradient (psi/ft):0.89
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):20845
Fresh water used in treatment (bbls):181989Disposition method For flowback:DISPOSAL
Total proppant used (lbs):7160017Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7652 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/2/2021Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 768
BBLS_OIL 350
BTU_GAS 1542
CALC_BBLS_H2O 768
CALC_BBLS_OIL 350
CALC_GOR 654
CALC_MCF_GAS 229
CASING_PRESS 2258
GRAVITY_OIL 43
MCF_GAS 229
TUBING_PRESS 1531
Perforation Data:
Interval Top:8051 ft.# Of Holes:980
Interval Bottom:17552 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)6840
Total Gas Produced (MCF)64677
GOR9455
GOR DeterminationBOE
Average BOE per Day49.358
Average MCFE per Day286.293

 Federal Financial Assurance  i 

 Tribal Well  i No