|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 4/1/2023 Measured TD: 18336 ft. Vertical TD: 7675 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 4/1/2023 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 4/21/2019 | Proposed Top PZ Location: | Sec:29 Twp: 1S 66W | Footage: 451 FNL 547 FWL | Bottom Hole Location: | Sec:28 Twp: 1S 66W | Footage: 477 FNL 537 FEL | Proposed Depth/Form: | 17915 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED | Cement: | Sacks: 100, Top: 0 ft., Bottom: 80 ft. | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 400, Top: 0 ft., Bottom: 1500 ft. | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18406 ft., Weight: 20 , Citings Type: PLANNED | Cement: | Sacks: 2463, Top: 1500 ft., Bottom: 18406 ft. |
| | |
Wellbore Completed | Completion Date: | 2/3/2018 | Spud Date: | 1/16/2018 | Spud Date Is: | ACTUAL | Measured TD: | 18336 ft. | Measured PB depth: | 18318 ft. | True Vertical TD: | 7675 ft. | True Vertical PB depth: | 7677 ft. | Top PZ Location: | Sec:29 Twp: 1S 66W | Footage: 451 FNL 547 FWL | Bottom Hole Location: | Sec:28 Twp: 1S 66W | Footage: 477 N 537 E | Log Types: | CBL, Mud, MWD/LWD, (Triple Combo on 001-10041). | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL | Cement: | Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1547 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 525, Top: 0 ft., Bottom: 1547 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18321 ft., Weight: 20 , Citings Type: ACTUAL | Cement: | Sacks: 2900, Top: 760 ft., Bottom: 18336 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 5204 ft. | | N | N | SUSSEX | 5661 ft. | | N | N | SHANNON | 6359 ft. | | N | N | SHARON SPRINGS | 8180 ft. | | N | N | NIOBRARA | 8220 ft. | | N | N | FORT HAYS | 8862 ft. | | N | N | CODELL | 9027 ft. | | N | N |
Formation CODL Formation Classification: OW Status: CM - 8/20/2018 Interval Top: 9045 ft. Interval Bottom: 18271 ft. Completed Information for Formation CODELL | 1st Production Date: | 4/29/2018 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 3/8/2018 | Treatment End Date: | 3/25/2018 | Treatment Summary: | Producing Intervals: 9045'-11485'; 11866'-17504'; 17618'-18271'. | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 9045 ft. | # Of Holes: | 2122 | Interval Bottom: | 18271 ft. | Hole Size: | 0.42 in. |
|
Formation FTHYS Formation Classification: OW Status: CM - 8/20/2018 Interval Top: 8873 ft. Interval Bottom: 17599 ft. Completed Information for Formation FORT HAYS | 1st Production Date: | 4/29/2018 | Choke Size: | | Formation Name: | FORT HAYS | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 3/8/2018 | Treatment End Date: | 3/25/2018 | Treatment Summary: | Producing Intervals: 8873'-9023'; 11485'-11486'; 17146'-17207'; 17505'-17599'. | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation FTHYS. |
| Perforation Data: | Interval Top: | 8873 ft. | # Of Holes: | 135 | Interval Bottom: | 17599 ft. | Hole Size: | 0.42 in. |
|
Formation NBFHC Formation Classification: OW Status: PR - 4/1/2023 Interval Top: 8827 ft. Interval Bottom: 18271 ft. Completed Information for Formation NIOBRARA-FT HAYS-CODELL | 1st Production Date: | 4/29/2018 | Choke Size: | | Formation Name: | NIOBRARA-FT HAYS-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 3/8/2018 | Treatment End Date: | 3/25/2018 | Treatment Summary: | 21152 total bbls fluid pumped: 21140 bbls fresh water, 12 bbls 15% HCl acid;
19,202,290 total lbs proppant pumped: 30/50 mesh sand. | Total fluid used in treatment (bbls): | 21152 | Max pressure during treatment (psi): | 8574 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.33 | Type Of gas: | | Number Of staged intervals: | 64 | Total acid used in treatment (bbls): | 12 | Min frac gradient (psi/ft): | 0.82 | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 9153 | Fresh water used in treatment (bbls): | 21140 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 19202290 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8773 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 5/13/2018 | Test Method: | flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 594 | BBLS_OIL | 711 | BTU_GAS | 1350 | CALC_BBLS_H2O | 594 | CALC_BBLS_OIL | 711 | CALC_GOR | 270 | CALC_MCF_GAS | 192 | CASING_PRESS | 623 | GRAVITY_OIL | 42 | MCF_GAS | 192 | TUBING_PRESS | 1445 |
| Perforation Data: | Interval Top: | 8827 ft. | # Of Holes: | 2269 | Interval Bottom: | 18271 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 8/20/2018 Interval Top: 8827 ft. Interval Bottom: 8855 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 4/29/2018 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 3/8/2018 | Treatment End Date: | 3/25/2018 | Treatment Summary: | Producing Interval: 8827'-8855'. | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 8827 ft. | # Of Holes: | 12 | Interval Bottom: | 8855 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 18579 |
Total Gas Produced (MCF) | 75704 |
GOR | 4074 |
GOR Determination | BOE |
Average BOE per Day | 86.414 |
Average MCFE per Day | 501.193 |
Federal Financial Assurance | i | |
|
|