|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 8/7/2018 Measured TD: 17454 ft. Vertical TD: 7337 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 8/7/2018 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 4/21/2019 | Proposed Top PZ Location: | Sec:29 Twp: 1S 66W | Footage: 860 FSL 500 FWL | Bottom Hole Location: | Sec:28 Twp: 1S 66W | Footage: 860 FSL 500 FEL | Proposed Depth/Form: | 17592 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED | Cement: | Sacks: 100, Top: 0 ft., Bottom: 80 ft. | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 400, Top: 0 ft., Bottom: 1500 ft. | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17573 ft., Weight: 20 , Citings Type: PLANNED | Cement: | Sacks: 2342, Top: 1500 ft., Bottom: 17573 ft. |
| | |
Wellbore Completed | Completion Date: | 8/9/2018 | Spud Date: | 8/9/2018 | Spud Date Is: | ACTUAL | Measured TD: | 17454 ft. | Measured PB depth: | 17454 ft. | True Vertical TD: | 7337 ft. | True Vertical PB depth: | 7337 ft. | Top PZ Location: | Sec:28 Twp: 1S 66W | Footage: 861 FSL 535 FEL | Bottom Hole Location: | Sec:28 Twp: 1S 66W | Footage: 861 S 535 E | Log Types: | MWD/LWD, (Triple Combo on 001-10041). | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL | Cement: | Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1597 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 550, Top: 0 ft., Bottom: 1597 ft., Determination Method: VISU | Casing: | String Type: OPEN HOLE, Hole Size: 8.5 in., Size: , Top: 1597 ft., Depth: 17454 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4673 ft. | | N | N | SUSSEX | 5069 ft. | | N | N | SHANNON | 5754 ft. | | N | N | NIOBRARA | 7750 ft. | | | | No formation data to display. |
Sidetrack #01 Wellbore Classification: OW Status: PR - 4/1/2023 Measured TD: 17451 ft. Vertical TD: 7389 ft. Wellbore Data for Sidetrack #01 | Wellbore Classification: OW PR - 4/1/2023 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 9/11/2020 | Proposed Top PZ Location: | Sec:29 Twp: 1S 66W | Footage: 860 FSL 500 FWL | Bottom Hole Location: | Sec:28 Twp: 1S 66W | Footage: 860 FSL 500 FEL | Proposed Depth/Form: | 17592 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED | Cement: | Sacks: 100, Top: 0 ft., Bottom: 80 ft. | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1596 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 550, Top: 0 ft., Bottom: 1596 ft. | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17573 ft., Weight: 20 , Citings Type: PLANNED | Cement: | Sacks: 2342, Top: 1500 ft., Bottom: 17573 ft. |
| | |
Wellbore Completed | Completion Date: | 9/9/2018 | Spud Date: | 8/9/2018 | Spud Date Is: | ACTUAL | Measured TD: | 17451 ft. | Measured PB depth: | 17426 ft. | True Vertical TD: | 7389 ft. | True Vertical PB depth: | 7390 ft. | Top PZ Location: | Sec:29 Twp: 1S 66W | Footage: 860 FSL 505 FWL | Bottom Hole Location: | Sec:28 Twp: 1S 66W | Footage: 862 S 564 E | Log Types: | CBL, Mud, MWD/LWD, (Triple Combo on 001-10041). | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL | Cement: | Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1597 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 550, Top: 0 ft., Bottom: 1597 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17430 ft., Weight: 20 , Citings Type: ACTUAL | Cement: | Sacks: 2775, Top: 280 ft., Bottom: 17451 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4673 ft. | | | | SUSSEX | 5069 ft. | | | | SHANNON | 5754 ft. | | | | NIOBRARA | 7750 ft. | | | |
Formation NBRR Formation Classification: OW Status: PR - 4/1/2023 Interval Top: 7913 ft. Interval Bottom: 17381 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 3/18/2019 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 1/5/2019 | Treatment End Date: | 1/14/2019 | Treatment Summary: | Frac'd Niobrara with 48-stage plug-and-perf;
218466 total bbls fluid pumped: 202709 bbls gelled fluid, 15602 bbls fresh water, and 155 bbls 28% HCl acid;
14352524 total lbs proppant pumped: 7152060 lbs 40/70 mesh and 7200464 lbs 30/50 mesh. | Total fluid used in treatment (bbls): | 218466 | Max pressure during treatment (psi): | 8595 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.33 | Type Of gas: | | Number Of staged intervals: | 48 | Total acid used in treatment (bbls): | 155 | Min frac gradient (psi/ft): | 0.88 | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 17945 | Fresh water used in treatment (bbls): | 15602 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 14352524 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7855 ft. | Tubing Packer Depth: | 7839 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 3/28/2019 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 257 | BBLS_OIL | 686 | BTU_GAS | 1485 | CALC_BBLS_H2O | 257 | CALC_BBLS_OIL | 686 | CALC_GOR | 981 | CALC_MCF_GAS | 673 | GRAVITY_OIL | 40 | MCF_GAS | 673 | TUBING_PRESS | 884 |
| Perforation Data: | Interval Top: | 7913 ft. | # Of Holes: | 1129 | Interval Bottom: | 17381 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 9680 |
Total Gas Produced (MCF) | 56497 |
GOR | 5836 |
GOR Determination | BOE |
Average BOE per Day | 53.060 |
Average MCFE per Day | 307.747 |
Federal Financial Assurance | i | |
|
|