Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10027
Well Classification: OW Status: PR - 7/1/2023
Well Name/No:ALMA 1S-66-2524 #20CDH
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/1/2023
FacilityID:449943LocationID:449925
County:ADAMS #001Location:SWSE 25 1S66W 6
Field:WATTENBERG - #90750Elevation:5173 ft.
Planned Location:237FSL  2038 FELLat/Long: 39.929500 / -104.721850Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.929499 / -104.721848Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/27/2018
End Date: 3/4/2018
Reported: 3/19/2018
Days to report: 15
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 7/1/2023             Measured TD: 16202 ft.    Vertical TD: 7738 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 7/1/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:4/5/2019
Proposed Top PZ Location:Sec:25 Twp: 1S 66W Footage: 103 FSL  7 FWL
Bottom Hole Location:Sec:24 Twp: 1S 66W Footage: 2109 FSL  1 FWL
Proposed Depth/Form:16350 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 560, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16250 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2149, Top: 1500 ft., Bottom: 16250 ft.

Wellbore Completed
Completion Date:11/23/2017
Spud Date:11/12/2017Spud Date Is:ACTUAL
Measured TD:16202 ft.Measured PB depth:16170 ft.
True Vertical TD:7738 ft.True Vertical PB depth:7738 ft.
Top PZ Location:Sec:25 Twp: 1S 66WFootage: 103 FSL  7 FWL
Bottom Hole Location:Sec:24 Twp: 1S 66WFootage: 2109 S  1 W
Log Types:Mud, Triple Combination, MWD/LWD, CBL.
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1675 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 575, Top: 0 ft., Bottom: 1675 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16175 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2600, Top: 786 ft., Bottom: 16175 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3840 ft.NN
SUSSEX4605 ft.NN
SHANNON5740 ft.NN
SHARON SPRINGS8237 ft.NN
NIOBRARA8281 ft.NN
FORT HAYS8764 ft.NN
CODELL8853 ft.NN

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 12/21/2018                Interval Top: 10385 ft.    Interval Bottom: 15944 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:3/30/2018Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/27/2018Treatment End Date:3/4/2018
Treatment Summary:Producing Intervals: 10385'-10454'; 13986'-14331'; 15122'-15190'; 15597'-15944'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:10385 ft.# Of Holes:168
Interval Bottom:15944 ft.Hole Size:0.42 in.

Formation CD-FH                   Formation Classification:  OW                   Status:  SI - 11/1/2024                 Interval Top: 8917 ft.    Interval Bottom: 16074 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:3/30/2018Choke Size: 
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/27/2018Treatment End Date:3/4/2018
Treatment Summary:Frac'd Codell-Fort Hays with 36-stage plug-and-perf; 10800640 total lbs proppant pumped: 30/50 mesh sand; 11519 total bbls fluid pumped: 11457 bbls fresh water and 62 bbls 15% HCL acid.
Total fluid used in treatment (bbls):11519Max pressure during treatment (psi):8531
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:36
Total acid used in treatment (bbls):62Min frac gradient (psi/ft):0.87
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):8925
Fresh water used in treatment (bbls):11457Disposition method For flowback:DISPOSAL
Total proppant used (lbs):10800640Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8779 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/15/2018Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 483
BBLS_OIL 401
BTU_GAS 1340
CALC_BBLS_H2O 483
CALC_BBLS_OIL 401
CALC_GOR 711
CALC_MCF_GAS 285
CASING_PRESS 229
GRAVITY_OIL 41
MCF_GAS 285
TUBING_PRESS 503
Perforation Data:
Interval Top:8917 ft.# Of Holes:1261
Interval Bottom:16074 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 12/21/2018                Interval Top: 8917 ft.    Interval Bottom: 16074 ft.

 Completed Information for Formation CODELL
1st Production Date:3/30/2018Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/27/2018Treatment End Date:3/4/2018
Treatment Summary:Producing Intervals: 8917'-10357'; 10485'-13952'; 14362'-15089'; 15219'-15566'; 15976-16074'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8917 ft.# Of Holes:1093
Interval Bottom:16074 ft.Hole Size:0.42 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
12/2023 - 11/2024

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)287
Total Gas Produced (MCF)1035
GOR3606
GOR DeterminationBOE
Average BOE per Day1.255
Average MCFE per Day7.299

 Federal Financial Assurance  i 

 Tribal Well  i No